The Centre for Environmental Rights (CER), acting for Earthlife Africa Johannesburg (ELA), wrote to the Department of Energy on 18 October 2016 to question the appointment of Thabametsi Power Company (Pty) Limited as a preferred bidder for a coal-fired power station. The CER highlights a pending High Court review application regarding the project's environmental authorisation, specifically the failure to conduct a climate change impact assessment, and requests clarity on whether Thabametsi disclosed this legal challenge to the Department as required by the procurement criteria.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Earthlife Africa Johannesburg (ELA) launched an application in the Pretoria High Court (case number 65662/16) on 28 August 2016 to review and set aside the environmental authorisation for the Thabametsi coal-fired power station, primarily due to the project's "failure to conduct a climate change impact assessment".
  • Under clause 4.1.3 of the Legal Qualification Criteria for the Coal Baseload Independent Power Producer Procurement Programme (CBIPPPP), the Department of Energy has the discretion to consider a bid response as "insufficient to pass the threshold requirement" if key environmental consents are subject to High Court review proceedings.
  • The CER is seeking confirmation on whether Thabametsi informed the Department of the review application and whether the company made submissions explaining why its bid should be accepted despite the pending litigation.

Cite the original document

APA
Centre for Environmental Rights (n.d.). cer-letter-to-ipp-unit-18-10-16-8b1d0f21e027627a.pdf. https://cer.org.za/wp-content/uploads/2016/07/CER-Letter-to-IPP-Unit-18-10-16.pdf?x21779
Chicago
Centre for Environmental Rights. cer-letter-to-ipp-unit-18-10-16-8b1d0f21e027627a.pdf. n.d. https://cer.org.za/wp-content/uploads/2016/07/CER-Letter-to-IPP-Unit-18-10-16.pdf?x21779.
Wikipedia
{{cite press release |author=Centre for Environmental Rights |title=cer-letter-to-ipp-unit-18-10-16-8b1d0f21e027627a.pdf |url=https://cer.org.za/wp-content/uploads/2016/07/CER-Letter-to-IPP-Unit-18-10-16.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@misc{centreforenvironmentalrightsndcerlettertoippunit1810168b1d0f21e027627apdf, author = {{Centre for Environmental Rights}}, title = {{cer-letter-to-ipp-unit-18-10-16-8b1d0f21e027627a.pdf}}, publisher = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2016/07/CER-Letter-to-IPP-Unit-18-10-16.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated