APPELLANT’S ANSWERING STATEMENT IN TERMS OF REGULATION 63(2)(b) OF THE ENVIRONMENTAL IMPACT ASSESSMENT REGULATIONS, 2010 GN R543, IN RESPECT OF THE APPEAL AGAINST THE AUTHORISATION FOR THE ESTABLISHMENT OF A 600 MEGAWATT (MW) COAL FIRED INDEPENDENT POWER PLANT (IPP) AND ASSOCIATED INFRASTRUCTURE FOR KIPOWER (PTY) LTD NEAR DELMAS, IN MPUMALANGA PROVINCE

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Centre for Environmental Rights submitted an Answering Statement on 4 March 2016 on behalf of groundWork to appeal the authorisation of a 600 MW coal-fired power plant for KiPower (Pty) Ltd near Delmas, Mpumalanga. The submission was four days late, and a request for condonation was included.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Centre for Environmental Rights submitted an Answering Statement on 4 March 2016 on behalf of groundWork, the appellant, regarding the authorisation of a 600 MW coal-fired Independent Power Plant (IPP) and associated infrastructure for KiPower (Pty) Ltd near Delmas, Mpumalanga Province.
  • The submission was made in response to a Responding Statement filed by Jones & Wagener (Pty) Ltd, the Environmental Assessment Practitioner for the Second Respondent, on 28 January 2016.
  • The Answering Statement was submitted four days after the original deadline of 29 February 2016; consequently, the appellant requested condonation for the late submission under regulation 63(3) of the 2010 EIA Regulations.

Cite the original document

APA
Centre for Environmental Rights (2016). APPELLANT’S ANSWERING STATEMENT IN TERMS OF REGULATION 63(2)(b) OF THE ENVIRONMENTAL IMPACT ASSESSMENT REGULATIONS, 2010 GN R543, IN RESPECT OF THE APPEAL AGAINST THE AUTHORISATION FOR THE ESTABLISHMENT OF A 600 MEGAWATT (MW) COAL FIRED INDEPENDENT POWER PLANT (IPP) AND ASSOCIATED INFRASTRUCTURE FOR KIPOWER (PTY) LTD NEAR DELMAS, IN MPUMALANGA PROVINCE. https://cer.org.za/wp-content/uploads/2014/06/CER-Cover-Letter-to-the-KiPower-Answering-Statement-4-March-2016.pdf?x21779
Chicago
Centre for Environmental Rights. APPELLANT’S ANSWERING STATEMENT IN TERMS OF REGULATION 63(2)(b) OF THE ENVIRONMENTAL IMPACT ASSESSMENT REGULATIONS, 2010 GN R543, IN RESPECT OF THE APPEAL AGAINST THE AUTHORISATION FOR THE ESTABLISHMENT OF A 600 MEGAWATT (MW) COAL FIRED INDEPENDENT POWER PLANT (IPP) AND ASSOCIATED INFRASTRUCTURE FOR KIPOWER (PTY) LTD NEAR DELMAS, IN MPUMALANGA PROVINCE. 2016. https://cer.org.za/wp-content/uploads/2014/06/CER-Cover-Letter-to-the-KiPower-Answering-Statement-4-March-2016.pdf?x21779.
Wikipedia
{{cite press release |author=Centre for Environmental Rights |title=APPELLANT’S ANSWERING STATEMENT IN TERMS OF REGULATION 63(2)(b) OF THE ENVIRONMENTAL IMPACT ASSESSMENT REGULATIONS, 2010 GN R543, IN RESPECT OF THE APPEAL AGAINST THE AUTHORISATION FOR THE ESTABLISHMENT OF A 600 MEGAWATT (MW) COAL FIRED INDEPENDENT POWER PLANT (IPP) AND ASSOCIATED INFRASTRUCTURE FOR KIPOWER (PTY) LTD NEAR DELMAS, IN MPUMALANGA PROVINCE |date=4 March 2016 |url=https://cer.org.za/wp-content/uploads/2014/06/CER-Cover-Letter-to-the-KiPower-Answering-Statement-4-March-2016.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@misc{centreforenvironmentalrights2016appellants, author = {{Centre for Environmental Rights}}, title = {{APPELLANT’S ANSWERING STATEMENT IN TERMS OF REGULATION 63(2)(b) OF THE ENVIRONMENTAL IMPACT ASSESSMENT REGULATIONS, 2010 GN R543, IN RESPECT OF THE APPEAL AGAINST THE AUTHORISATION FOR THE ESTABLISHMENT OF A 600 MEGAWATT (MW) COAL FIRED INDEPENDENT POWER PLANT (IPP) AND ASSOCIATED INFRASTRUCTURE FOR KIPOWER (PTY) LTD NEAR DELMAS, IN MPUMALANGA PROVINCE}}, publisher = {Centre for Environmental Rights}, year = {2016}, month = mar, url = {https://cer.org.za/wp-content/uploads/2014/06/CER-Cover-Letter-to-the-KiPower-Answering-Statement-4-March-2016.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated