arnot-powerstation-reliability-calculations-acfc97085219772b.pdf
Summary
A letter from Eskom to the Department of Economic Development, Environment and Tourism (DEDET) providing reliability calculations for particulate matter (PM) and gaseous monitors at Arnot Power Station for the period of 1 April 2015 to 31 March 2016.
Key insights
- Between 1 April 2015 and 31 March 2016, the North Stack monitors showed high availability: the PM monitor was available 99.87% of the time, while the SO and NO monitors were both available 98.31% of the time.
- For the same period, the South Stack PM monitor had an availability of 99.92%, while the SO and NO monitors both had a lower availability of 83.29%.
Cite the original document
- APA
- Centre for Environmental Rights (n.d.). arnot-powerstation-reliability-calculations-acfc97085219772b.pdf. https://cer.org.za/wp-content/uploads/2017/07/Arnot-PowerStation-Reliability-Calculations.pdf?x21779
- Chicago
- Centre for Environmental Rights. arnot-powerstation-reliability-calculations-acfc97085219772b.pdf. n.d. https://cer.org.za/wp-content/uploads/2017/07/Arnot-PowerStation-Reliability-Calculations.pdf?x21779.
- Wikipedia
- {{cite report |author=Centre for Environmental Rights |title=arnot-powerstation-reliability-calculations-acfc97085219772b.pdf |url=https://cer.org.za/wp-content/uploads/2017/07/Arnot-PowerStation-Reliability-Calculations.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
- BibTeX
- @techreport{centreforenvironmentalrightsndarnotpowerstationreliabilitycalculationsacfc97085219772bpdf, author = {{Centre for Environmental Rights}}, title = {{arnot-powerstation-reliability-calculations-acfc97085219772b.pdf}}, institution = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2017/07/Arnot-PowerStation-Reliability-Calculations.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated