The South African Department of Environmental Affairs issued an amendment to the Environmental Authorisation (EA) dated 31 October 2013 for the construction of the 450 MW Khanyisa coal-fired power station in Emalahleni, Mpumalanga. The amendment updates the project applicant and the specific farm portions designated for the project site and ash disposal site.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Department of Environmental Affairs amended the Environmental Authorisation for the 450 MW Khanyisa coal-fired power station, changing the applicant from Anglo Operations Limited to ACWA Khanyisa Thermal Power Station (RF) (Pty) Ltd.
  • The amendment updates the project site location to include the remaining extent of portion 1, the remaining extent of portion 145, and portion 167 of the Farm Klipfontein No. 322 JS, as well as the remaining extent of the Farm Groenfontein No. 331.
  • The ash disposal site has been amended to encompass the remaining extent of the Farm Groenfontein No. 331, the remaining extent of portion 2 of the Farm Groenfontein No. 331, the remaining extent of the Farm Klippan No. 332, and portions 2, 7, and 11 (a portion of portion 5) of the Farm Klippan No. 332.

Cite the original document

APA
Centre for Environmental Rights (n.d.). KM_C654e-20170203144023. https://cer.org.za/wp-content/uploads/2018/04/Approved-Amended-EA-ACWA-Power-Khanyisa-IPP-change-of-applicant-and-farm-names.pdf?x21779
Chicago
Centre for Environmental Rights. KM_C654e-20170203144023. n.d. https://cer.org.za/wp-content/uploads/2018/04/Approved-Amended-EA-ACWA-Power-Khanyisa-IPP-change-of-applicant-and-farm-names.pdf?x21779.
Wikipedia
{{cite press release |author=Centre for Environmental Rights |title=KM_C654e-20170203144023 |url=https://cer.org.za/wp-content/uploads/2018/04/Approved-Amended-EA-ACWA-Power-Khanyisa-IPP-change-of-applicant-and-farm-names.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@misc{centreforenvironmentalrightsndkmc654e20170203144023, author = {{Centre for Environmental Rights}}, title = {{KM\_C654e-20170203144023}}, publisher = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2018/04/Approved-Amended-EA-ACWA-Power-Khanyisa-IPP-change-of-applicant-and-farm-names.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated