RECORD OF RECOMMENDATION: INTEGRATED WATER USE LICENCE FOR KIPOWER IPP COAL-FIRED POWER STATION

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Centre for Environmental Rights (CER), acting on behalf of groundWork, is requesting clarification from the Department of Water and Sanitation regarding the "minimum requirements" used to recommend the issuance of an integrated water use licence (IWUL) for the proposed 600MW KiPower coal-fired power station near Delmas, Mpumalanga.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Centre for Environmental Rights (CER), representing groundWork, has requested the Department of Water and Sanitation to clarify the meaning of "minimum requirements" cited in the Record of Recommendation (RoR) for the issuance of an integrated water use licence (IWUL) to KiPower (Pty) Limited. This request is intended to support an appeal of the IWUL.
  • The IWUL application pertains to the proposed 600MW KiPower coal-fired power station, which is planned to be located near Delmas in Mpumalanga.

Cite the original document

APA
Centre for Environmental Rights (2017). RECORD OF RECOMMENDATION: INTEGRATED WATER USE LICENCE FOR KIPOWER IPP COAL-FIRED POWER STATION. https://cer.org.za/wp-content/uploads/2017/09/Annexure-L-CER-Letter-DWS-10-8-17.pdf?x21779
Chicago
Centre for Environmental Rights. RECORD OF RECOMMENDATION: INTEGRATED WATER USE LICENCE FOR KIPOWER IPP COAL-FIRED POWER STATION. 2017. https://cer.org.za/wp-content/uploads/2017/09/Annexure-L-CER-Letter-DWS-10-8-17.pdf?x21779.
Wikipedia
{{cite press release |author=Centre for Environmental Rights |title=RECORD OF RECOMMENDATION: INTEGRATED WATER USE LICENCE FOR KIPOWER IPP COAL-FIRED POWER STATION |date=10 August 2017 |url=https://cer.org.za/wp-content/uploads/2017/09/Annexure-L-CER-Letter-DWS-10-8-17.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@misc{centreforenvironmentalrights2017record, author = {{Centre for Environmental Rights}}, title = {{RECORD OF RECOMMENDATION: INTEGRATED WATER USE LICENCE FOR KIPOWER IPP COAL-FIRED POWER STATION}}, publisher = {Centre for Environmental Rights}, year = {2017}, month = aug, url = {https://cer.org.za/wp-content/uploads/2017/09/Annexure-L-CER-Letter-DWS-10-8-17.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated