The South African Department of Environmental Affairs granted Medupi Power Station a postponement for SO2 emission compliance for existing plants (limit of 3500 mg/Nm3) until 31 March 2020, while maintaining a 500 mg/Nm3 limit for new plants from 1 April 2020, with full compliance required by 1 April 2025.
Cite the original document
- APA
- Centre for Environmental Rights (n.d.). annexure-b-medupi-approval-letter-4ee9385bdcf5fb3e.pdf. https://cer.org.za/wp-content/uploads/2018/10/Annexure-B-Medupi-Approval-Letter.pdf?x21779
- Chicago
- Centre for Environmental Rights. annexure-b-medupi-approval-letter-4ee9385bdcf5fb3e.pdf. n.d. https://cer.org.za/wp-content/uploads/2018/10/Annexure-B-Medupi-Approval-Letter.pdf?x21779.
- Wikipedia
- {{cite press release |author=Centre for Environmental Rights |title=annexure-b-medupi-approval-letter-4ee9385bdcf5fb3e.pdf |url=https://cer.org.za/wp-content/uploads/2018/10/Annexure-B-Medupi-Approval-Letter.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
- BibTeX
- @misc{centreforenvironmentalrightsndannexurebmedupiapprovalletter4ee9385bdcf5fb3epdf, author = {{Centre for Environmental Rights}}, title = {{annexure-b-medupi-approval-letter-4ee9385bdcf5fb3e.pdf}}, publisher = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2018/10/Annexure-B-Medupi-Approval-Letter.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated