Browse all documents

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Greenhouse Gas Pollution Prevention Plan 1 (2017-2020) for African Rainbow Minerals (ARM) outlines the company's strategy for monitoring and mitigating greenhouse gas (GHG) emissions across its ferrous division operations in South Africa, in compliance with the National Air Quality Act of 2004.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Greenhouse Gas Pollution Prevention Plan (GHG-PPP) covers the period from 21 July 2017 to 31 December 2020, with subsequent plans intended to cover five-year calendar periods.
  • The reporting boundary for the GHG-PPP includes all facilities within the ARM Ferrous Division under direct or joint operational control, specifically the Beeshoek and Khumani Iron Ore Mines, the Black Rock Manganese Mine, and the Cato Ridge and Machadodorp Works. It excludes the ARM Platinum Division and all operations outside of South Africa.
  • ARM identifies three primary production processes contributing to emissions: stationary combustion at Beeshoek, Black Rock, and Khumani mines; stationary combustion at Cato Ridge and Machadodorp Works; and process emissions from ferroalloys production specifically at Cato Ridge Works.
  • The company utilizes a Tier 1 methodology for calculating emissions for most activities, though it is transitioning to a Tier 2 mass balance approach for ferroalloys production (category 2C2).
  • Onsite mobile combustion sources are excluded from the plan based on guidance from the Department of Environmental Affairs (DEA). This includes aviation fuel emissions from aircraft at Beeshoek Mine, as the 2017 financial year consumption of 19,048 litres was below the 100,000 litre/year threshold.
  • ARM's mitigation strategy focuses on improving energy efficiency, reducing fuel consumption, and exploring renewable energy. Specific measures include the use of energy-efficient motors, optimizing furnace operations, and implementing a 'plan-do-check' principle via ISO 14001 aligned environmental management systems.

Cite the original document

APA
Centre for Environmental Rights (n.d.). KM_C654e-20190503152813. https://cer.org.za/wp-content/uploads/2019/12/African-Rainbow-Minerals-PPP.pdf?x21779
Chicago
Centre for Environmental Rights. KM_C654e-20190503152813. n.d. https://cer.org.za/wp-content/uploads/2019/12/African-Rainbow-Minerals-PPP.pdf?x21779.
Wikipedia
{{cite report |author=Centre for Environmental Rights |title=KM_C654e-20190503152813 |url=https://cer.org.za/wp-content/uploads/2019/12/African-Rainbow-Minerals-PPP.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{centreforenvironmentalrightsndkmc654e20190503152813, author = {{Centre for Environmental Rights}}, title = {{KM\_C654e-20190503152813}}, institution = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2019/12/African-Rainbow-Minerals-PPP.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated