Browse all documents

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Mpumalanga Province Department of Agriculture, Rural Development, Land and Environmental Affairs has granted environmental authorisation to the International Company for Water and Power Projects to construct a bulk water supply pipeline. The pipeline will connect the eMalahleni Reclamation Plant with the Khanyisa Power Station.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The International Company for Water and Power Projects is authorised to construct a 4.4km bulk water supply pipeline with an internal diameter of 0.36m. This pipeline will connect the eMalahleni Reclamation Plant with the Khanyisa Power Station on Portion 0 and Portion 3 of the farm Groenfontein 331 JS.
  • The Department's decision to grant authorisation was based on the finding that the power station will help alleviate national and Eskom generation capacity shortages.
  • The project site includes a permanent channeled valley bottom floodplain wetland that is described as 'Critically Modified' because it has been completely transformed.
  • The authorisation is subject to several environmental conditions, including the requirement that the pipeline be constructed as close as possible to the existing conveyor belt and that an ecological walk-through be conducted during summer to identify plants of conservation importance for relocation.
  • The applicant must appoint an independent Environmental Control Officer (ECO) before construction begins to monitor compliance with the authorisation and the approved Environmental Management Programme (EMPr) dated 11 February 2016.
  • Construction activities are restricted to working hours between 07h00 and 17h00, and the developer must prioritise local labour for employment during the construction phase.

Cite the original document

APA
Centre for Environmental Rights (n.d.). KM_C554e-20160519164948. https://cer.org.za/wp-content/uploads/2018/04/5-May-2016-EA-Bulk-water-supply-pipeline-Khanyisa-Power-Station-1.pdf?x21779
Chicago
Centre for Environmental Rights. KM_C554e-20160519164948. n.d. https://cer.org.za/wp-content/uploads/2018/04/5-May-2016-EA-Bulk-water-supply-pipeline-Khanyisa-Power-Station-1.pdf?x21779.
Wikipedia
{{cite press release |author=Centre for Environmental Rights |title=KM_C554e-20160519164948 |url=https://cer.org.za/wp-content/uploads/2018/04/5-May-2016-EA-Bulk-water-supply-pipeline-Khanyisa-Power-Station-1.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@misc{centreforenvironmentalrightsndkmc554e20160519164948, author = {{Centre for Environmental Rights}}, title = {{KM\_C554e-20160519164948}}, publisher = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2018/04/5-May-2016-EA-Bulk-water-supply-pipeline-Khanyisa-Power-Station-1.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated