While Brussels finalises the EU Grid Package, three areas demand immediate action

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The document outlines three priority areas for the upcoming EU Grid Package to resolve electricity grid bottlenecks in Europe: coordinating planning across borders and time horizons, accelerating permitting processes, and modernising existing infrastructure using grid-enhancing technologies. It highlights that Europe requires approximately half a trillion euros in grid investments by 2030 and notes that over 40% of distribution grids are over 40 years old. The text emphasizes that current fragmented planning and permitting delays, which account for about 25% of total investment time, hinder the integration of renewable capacity. It proposes extending planning horizons from 10 to 20 years and implementing 'one-stop shops' for permitting to improve efficiency. Additionally, it suggests that grid-enhancing technologies could increase network capacity by 20-40%.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Europe requires approximately 500 billion euros in grid investments by 2030, according to the European Commission, to support climate ambitions, industrial competitiveness, and energy affordability.
  • The European electricity grid is aging, with more than 40% of distribution grids being over 40 years old and nearing the end of their useful life, while permitting processes currently account for roughly 25% of the total time required for grid investment.
  • Current grid planning is fragmented geographically and temporally, with national plans misaligned with the EU's Ten-Year Network Development Plan (TYNDP) and planning horizons of 10 years that are too short to capture long-term infrastructure synergies for 2050 goals.
  • The adoption of grid-enhancing technologies—such as advanced conductors, power flow controls, and dynamic line ratings—could increase existing network capacity by 20% to 40% and typically require less permitting time than new greenfield projects.

Cite the original document

APA
Romm, L., & Kösters, M. (2025). While Brussels finalises the EU Grid Package, three areas demand immediate action. Clean Air Task Force. https://www.catf.us/2025/11/while-brussels-finalises-eu-grid-package-three-areas-demand-immediate-action/
Chicago
Romm, Lea, and Marie Kösters. While Brussels finalises the EU Grid Package, three areas demand immediate action. Clean Air Task Force, 2025. https://www.catf.us/2025/11/while-brussels-finalises-eu-grid-package-three-areas-demand-immediate-action/.
Wikipedia
{{cite press release |last1=Romm |first1=Lea |last2=Kösters |first2=Marie |title=While Brussels finalises the EU Grid Package, three areas demand immediate action |publisher=Clean Air Task Force |date=20 November 2025 |url=https://www.catf.us/2025/11/while-brussels-finalises-eu-grid-package-three-areas-demand-immediate-action/ |access-date=23 October 2026 |via=Climate Insights Directory}}
BibTeX
@misc{romm2025while, author = {Romm, Lea and Kösters, Marie}, title = {{While Brussels finalises the EU Grid Package, three areas demand immediate action}}, publisher = {Clean Air Task Force}, year = {2025}, month = nov, url = {https://www.catf.us/2025/11/while-brussels-finalises-eu-grid-package-three-areas-demand-immediate-action/}, urldate = {2026-10-23}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated