Subnational Spending in Nigeria
Summary
The report finds that Nigerian states expanded approved budgets by 26.5% between 2024 and 2025, yet execution rates declined from 70% to 68%, leaving over N8 trillion unimplemented in 2025. It argues that budgets are often used as political signaling tools to project ambition rather than realistic fiscal frameworks. While capital expenditure is frequently under-delivered due to weak procurement and institutional systems, personnel costs remain politically protected and are often fully implemented or exceeded. The analysis highlights a misalignment where expenditure growth outpaces revenue growth in states like Niger, Plateau, and Kebbi, whereas states like Lagos and Bayelsa show stronger alignment and execution.
Key insights
- Between 2024 and 2025, Nigerian states significantly increased their planned spending, but the rate of actual implementation declined. Total approved expenditure rose from N20.17 trillion in 2024 to N25.51 trillion in 2025, a 26.5% increase, while execution rates dropped from 70% to 68%.
- In 2025, more than N8 trillion of planned state spending was not implemented, leading to delayed infrastructure, reduced service delivery, and diminished fiscal credibility.
- Budgets in many Nigerian states function as political tools for signaling developmental ambition and projecting legitimacy rather than as realistic implementation frameworks, leading to a gap between approved budgets and actual delivery.
- Personnel and recurrent expenditures are politically protected and remain rigid even during fiscal stress; states typically cut capital projects to manage fiscal pressure rather than reducing personnel costs.
- There is a significant disparity in budget execution across states. Lagos State and Bayelsa State showed strong performance with execution rates of approximately 84% and 82% respectively, while Kebbi State (41%), Plateau State (47%), and Niger State (47%) recorded much lower rates.
- Several states exhibit a misalignment where expenditure growth far exceeds actual revenue growth. For example, Niger State increased its 2025 approved expenditure to N1.09 trillion despite actual revenue of only N354.51 billion.
- Weak institutional systems, specifically in procurement, project management, and monitoring, constrain the implementation of capital expenditure and lead to a cycle of abandoned projects.
Cite the original document
- APA
- Kwaga, V., Jolayemi, T., & Aje, A. (2024). Subnational Spending in Nigeria. BudgIT. https://budgit.org/wp-content/uploads/2026/06/Subnational-Spending-in-Nigeria.pdf
- Chicago
- Kwaga, Vahyala, Thaddeaus Jolayemi, and Ayotomiwa Aje. Subnational Spending in Nigeria. BudgIT, 2024. https://budgit.org/wp-content/uploads/2026/06/Subnational-Spending-in-Nigeria.pdf.
- Wikipedia
- {{cite report |last1=Kwaga |first1=Vahyala |last2=Jolayemi |first2=Thaddeaus |last3=Aje |first3=Ayotomiwa |title=Subnational Spending in Nigeria |publisher=BudgIT |date=2024 |url=https://budgit.org/wp-content/uploads/2026/06/Subnational-Spending-in-Nigeria.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document budgit-000262)}}
- BibTeX
- @techreport{kwaga2024subnational, author = {Kwaga, Vahyala and Jolayemi, Thaddeaus and Aje, Ayotomiwa}, title = {{Subnational Spending in Nigeria}}, institution = {BudgIT}, year = {2024}, url = {https://budgit.org/wp-content/uploads/2026/06/Subnational-Spending-in-Nigeria.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document budgit-000262} }
Full text
Collected · Record updated