PLUGGING THE LEAKS A CASE FOR PUBLIC SECTOR EFFICIENCY

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report evaluates the 2014 Nigerian budget proposal, highlighting a trend of increasing total budget size alongside significant revenue losses from oil theft and fraud. It notes that capital expenditure performance between 2009 and 2012 remained inconsistent, with unutilised funds reaching 38% in 2012. The document specifically details billions of dollars in losses within the oil and gas sector, including $10.99bn in crude oil theft and $8.2bn lost to fuel subsidy fraud, while illustrating the potential social impact of recovering missing funds.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Nigerian Federal Government budget has seen a steady increase from 2005 to 2014, rising from 1.648 trillion Naira in 2005 to a proposed 4.642 trillion Naira in 2014.
  • Capital expenditure performance from 2009 to 2012 showed significant gaps in utilisation, with unutilised capital expenditure being 27% in 2009, 38% in 2010, 34% in 2011, and 38% in 2012.
  • Substantial revenue leakages occur within the oil and gas sector, including $10.99bn in crude oil theft between 2009 and 2011, $8.2bn lost to fuel subsidy fraud, and $4.8bn in un-remitted NLNG payments by the NNPC.
  • The proposed 2014 security budget totals 814.45 billion Naira, with the largest allocation of 340.33 billion Naira going to Defence, followed by Police at 292.35 billion Naira.
  • The report highlights that $20bn in oil revenue from January to July 2013 is under investigation for being missing or stolen, suggesting this sum could instead fund high-speed rail, new refineries, or school fees for 10 million children.

Cite the original document

APA
BudgIT (n.d.). PLUGGING THE LEAKS A CASE FOR PUBLIC SECTOR EFFICIENCY. https://budgit.org/wp-content/uploads/2022/12/Plugging-The-Leaks-Publication.pdf
Chicago
BudgIT. PLUGGING THE LEAKS A CASE FOR PUBLIC SECTOR EFFICIENCY. n.d. https://budgit.org/wp-content/uploads/2022/12/Plugging-The-Leaks-Publication.pdf.
Wikipedia
{{cite report |author=BudgIT |title=PLUGGING THE LEAKS A CASE FOR PUBLIC SECTOR EFFICIENCY |url=https://budgit.org/wp-content/uploads/2022/12/Plugging-The-Leaks-Publication.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document budgit-000208)}}
BibTeX
@techreport{budgitndplugging, author = {{BudgIT}}, title = {{PLUGGING THE LEAKS A CASE FOR PUBLIC SECTOR EFFICIENCY}}, institution = {BudgIT}, url = {https://budgit.org/wp-content/uploads/2022/12/Plugging-The-Leaks-Publication.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document budgit-000208} }

Full text

Collected · Record updated