Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The 2021 Tracka Constituency Projects Report by BudgIT analyzes the execution of 5,253 public projects in Nigeria, highlighting systemic failures such as the diversion of empowerment projects for political patronage, the assignment of projects to agencies lacking relevant expertise, and a lack of transparency in budget locations. While noting a 23.5% increase in project completion rates compared to the previous year, the report documents numerous instances of under-implementation, project duplication, and the use of substandard materials. It specifically critiques the preference for short-term empowerment schemes over sustainable capital projects and calls for robust needs assessments and improved accountability from Ministries, Departments, and Agencies (MDAs).

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Between June 2021 and July 2022, Tracka monitored 5,253 projects, consisting of 1,195 Zonal Intervention Projects (ZIPs) and 4,058 Federal Consolidated Projects (FCPs). The overall completion rate for FCPs was 57.4%, and there was a 23.5% increase in the completion rate compared to the previous year.
  • A significant number of project locations are unspecified in the budget, creating opportunities for embezzlement and non-execution. In the 2021 ZIP and FCPs, over 2,354 project line items worth more than N20 billion had unknown locations.
  • Empowerment projects are frequently used as reward systems for political party loyalists rather than serving the general public. In Osun state, 90% of empowerment projects were managed by the All Progressives Congress (APC), with beneficiaries' names printed on party brochures.
  • Projects are often assigned to Ministries, Departments, and Agencies (MDAs) that lack the mandate or technical expertise to execute them, leading to shoddy implementation. Examples include the National Directorate of Employment (NDE) overseeing electrification in Edo state and the Public Complaints Commission handling water projects in Ondo state.
  • There is a recurring issue of project duplication and the reappearance of old budget items as new ones, which facilitates the mismanagement of funds. In Niger state, a N100m empowerment project under the OSGF reappeared in the same budget under SMEDAN for the same amount.
  • Many projects suffer from under-implementation or the use of substandard materials. In Ogun state, a N50m rural electrification project installed refurbished transformers instead of new ones, leaving the Orile-oko community in darkness.
  • Some elected officials have been found to fraudulently claim public projects as personal donations to curry political favor. In Ebonyi state, hospital beds and drugs funded by taxpayers were labeled as donations from Honourable Gomrade Chinedu Ogah.

Cite the original document

APA
Okeowo, G., Ilevbaoje, U., Ladipo, A., Ostyemi, J., Alade, B., Pabiekun, M., & Olofiniua, T. (2022). Tracka 2021 Constituency Projects Report. BudgIT. https://budgit.org/wp-content/uploads/2022/12/2021-Tracka-Constituency-Project-Report...pdf
Chicago
Okeowo, Gabriel, Uadamen Ilevbaoje, Ayormide Ladipo, Joshua Ostyemi, Bukola Alade, Michael Pabiekun, and Temitayo Olofiniua. Tracka 2021 Constituency Projects Report. BudgIT, 2022. https://budgit.org/wp-content/uploads/2022/12/2021-Tracka-Constituency-Project-Report...pdf.
Wikipedia
{{cite report |last1=Okeowo |first1=Gabriel |last2=Ilevbaoje |first2=Uadamen |last3=Ladipo |first3=Ayormide |last4=Ostyemi |first4=Joshua |last5=Alade |first5=Bukola |last6=Pabiekun |first6=Michael |last7=Olofiniua |first7=Temitayo |title=Tracka 2021 Constituency Projects Report |publisher=BudgIT |date=2022 |url=https://budgit.org/wp-content/uploads/2022/12/2021-Tracka-Constituency-Project-Report...pdf |access-date=5 November 2026 |via=Climate Insights Directory (document budgit-000064)}}
BibTeX
@techreport{okeowo2022tracka, author = {Okeowo, Gabriel and Ilevbaoje, Uadamen and Ladipo, Ayormide and Ostyemi, Joshua and Alade, Bukola and Pabiekun, Michael and Olofiniua, Temitayo}, title = {{Tracka 2021 Constituency Projects Report}}, institution = {BudgIT}, year = {2022}, url = {https://budgit.org/wp-content/uploads/2022/12/2021-Tracka-Constituency-Project-Report...pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document budgit-000064} }

Full text

Collected · Record updated