THIRD MONITORING REPORT Of the Independent Complaint Mechanism of FMO, DEG, PROPARCO for the Barro Blanco Hydroelectric Project in Panama (Case 14-002)
Summary
The Independent Expert Panel (IEP) concludes that most non-compliances from the 2015 review remain unresolved, despite the project becoming operational and the financial relationship between the lenders (DEG, FMO) and the developer (GENISA) ending in April 2021. Key outstanding issues include the loss of access to holy petroglyphs, deficient consultation with the Ngäbe-Buglé indigenous people, and significant livelihood impacts caused by fluctuating reservoir water levels. While the lenders implemented institutional policy changes regarding indigenous rights and FPIC, the IEP recommends a public apology and the establishment of a remedial fund to mitigate the substantive alteration of the affected communities' living environment.
Key insights
- The majority of non-compliances identified in the 2015 Compliance Review Report remain unresolved, including issues related to land acquisition, indigenous consultation, environmental impacts, and cultural heritage.
- The project has caused a substantive alteration of the living environment for affected communities, with impacts including the loss of fertile riverbank land, reduced agricultural yields, and the disappearance of gallery forests used for medicinal plants and construction wood.
- Fluctuating reservoir water levels, ranging from 92-93 meters in dry seasons to 103 meters in rainy seasons, have created muddy shorelines that hinder boat access and prevent reforestation efforts.
- Cultural heritage impacts are completely unresolved, specifically the flooding of holy petroglyphs significant to the Mama Tadta religion; promised archaeological and cultural studies by the government were never conducted.
- Communication between the project operator, GENISA, and the affected communities in Kiabda and Quebrada Caña is described as basically non-existent, with both sides reporting a hostile environment.
- The forced easement compensation process, finalized in 2019, is not accepted by affected landowners who believe the amounts offered are insufficient to compensate for the loss of their living environment.
- A 2019 reduction in reservoir water levels for dam repairs caused significant environmental harm, specifically a considerable loss of fish, without prior communication to the communities.
- DEG and FMO have implemented institutional changes since 2015, including adopting revised IFC PS7 standards requiring Free, Prior and Informed Consent (FPIC) and updating sustainability and human rights policies.
- The financial relationship between the lenders and the client ended in April 2021 when the loans were prepaid, a move the affected communities claim they were not informed about in advance.
Cite the original document
- APA
- Djalovski, I., Hartmann, A., & Windfuhr, M. (2022). THIRD MONITORING REPORT Of the Independent Complaint Mechanism of FMO, DEG, PROPARCO for the Barro Blanco Hydroelectric Project in Panama (Case 14-002). Both ENDS. https://www.bothends.org/uploaded_files/inlineitem/1Monitoring_Report_October_2022_ENG_.pdf
- Chicago
- Djalovski, Inbal, Arntraud Hartmann, and Michael Windfuhr. THIRD MONITORING REPORT Of the Independent Complaint Mechanism of FMO, DEG, PROPARCO for the Barro Blanco Hydroelectric Project in Panama (Case 14-002). Both ENDS, 2022. https://www.bothends.org/uploaded_files/inlineitem/1Monitoring_Report_October_2022_ENG_.pdf.
- Wikipedia
- {{cite report |last1=Djalovski |first1=Inbal |last2=Hartmann |first2=Arntraud |last3=Windfuhr |first3=Michael |title=THIRD MONITORING REPORT Of the Independent Complaint Mechanism of FMO, DEG, PROPARCO for the Barro Blanco Hydroelectric Project in Panama (Case 14-002) |publisher=Both ENDS |date=4 October 2022 |url=https://www.bothends.org/uploaded_files/inlineitem/1Monitoring_Report_October_2022_ENG_.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document bothends-000378)}}
- BibTeX
- @techreport{djalovski2022third, author = {Djalovski, Inbal and Hartmann, Arntraud and Windfuhr, Michael}, title = {{THIRD MONITORING REPORT Of the Independent Complaint Mechanism of FMO, DEG, PROPARCO for the Barro Blanco Hydroelectric Project in Panama (Case 14-002)}}, institution = {Both ENDS}, year = {2022}, month = oct, url = {https://www.bothends.org/uploaded_files/inlineitem/1Monitoring_Report_October_2022_ENG_.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document bothends-000378} }
Full text
Collected · Record updated