Review of dredging activities for entry channel and harbor basin of Promar S.A. shipyard, Suape, Brazil

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report finds that dredging for the Promar S.A. shipyard in Suape, Brazil, has caused severe environmental degradation and social disruption, including the destruction of mangroves and coral reefs and the loss of livelihoods for fishing communities. It argues that Atradius DSB failed to properly consider these impacts in its due diligence process for providing export credit insurance to Van Oord, and that Van Oord may be in non-compliance with OECD Guidelines for multinational enterprises due to a lack of stakeholder engagement and transparency.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Dredging activities in the Suape region have caused severe environmental damage, including the destruction of coral reefs, loss of mangrove forests, and the haphazard disposal of dredged materials, which has damaged fish breeding grounds.
  • Local fishing communities have suffered a total loss of livelihoods due to the disappearance of fish stocks resulting from dredging operations.
  • The industrialization of the Suape harbor area has led to forced evictions of residents and a breakdown of the social fabric, manifesting in increased rates of crime, violence, and sexual exploitation.
  • Atradius DSB is criticized for a lack of transparency and inadequate due diligence, as it approved the project despite significant social and environmental risks and failed to consult local stakeholders.
  • Van Oord may be in non-compliance with OECD Guidelines for multinational enterprises because it failed to engage in consultations with affected local stakeholders, deferring this responsibility entirely to the Suape harbor authority.
  • The project's adherence to IFC Performance Standards is questioned, specifically regarding the preservation of biodiversity, the prevention of pollution, and the avoidance of forced evictions.
  • There is a legal dispute regarding the land ownership of the Suape harbor authority, suggesting that the authority may lack the legal grounds to evict inhabitants.

Cite the original document

APA
Wiertsema, W. (2013). Review of dredging activities for entry channel and harbor basin of Promar S.A. shipyard, Suape, Brazil. Both ENDS. https://www.bothends.org/uploaded_files/document/130222_Report_Suape.pdf
Chicago
Wiertsema, Wiert. Review of dredging activities for entry channel and harbor basin of Promar S.A. shipyard, Suape, Brazil. Both ENDS, 2013. https://www.bothends.org/uploaded_files/document/130222_Report_Suape.pdf.
Wikipedia
{{cite report |last1=Wiertsema |first1=Wiert |title=Review of dredging activities for entry channel and harbor basin of Promar S.A. shipyard, Suape, Brazil |publisher=Both ENDS |date=February 2013 |url=https://www.bothends.org/uploaded_files/document/130222_Report_Suape.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document bothends-000329)}}
BibTeX
@techreport{wiertsema2013review, author = {Wiertsema, Wiert}, title = {{Review of dredging activities for entry channel and harbor basin of Promar S.A. shipyard, Suape, Brazil}}, institution = {Both ENDS}, year = {2013}, month = feb, url = {https://www.bothends.org/uploaded_files/document/130222_Report_Suape.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document bothends-000329} }

Full text

Collected · Record updated