Technical Workshop on the Economics of Nuclear Energy: 9 March 2016, Johannesburg

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This report summarizes a technical workshop concluding that South Africa cannot afford its proposed nuclear programme and that such a project is not a solution to the country's immediate electricity crisis.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The global nuclear industry is in decline, characterized by a downward trend in reactor start-ups and a decrease in the relative share of nuclear electricity production from a peak of 17.6% in the mid-1990s to less than 11% in 2014.
  • South Africa's proposed nuclear programme is not a viable solution for the current electricity crisis because the first reactor would take at least 15 years to come online.
  • South Africa lacks the financial capacity to fund the nuclear programme due to a contracting economy and sustainable debt limits; the National Treasury has indicated the programme is not viable unless 70% local finance can be guaranteed.
  • The most plausible financing for South Africa would be deals from Russia or China, but these carry significant risks, including the requirement for sovereign guarantees and 60 years of foreign exchange exposure.
  • International experience with European Pressurised Water Reactor (EPR) constructions shows significant cost overruns and delays, such as a Finland plant where costs rose from an initial estimate of 2-2.5 billion Euro to around 8 billion Euro.
  • Competitive bidding, similar to the Renewable Energy Independent Power Producers (REIPP) programme, is identified as the best financing model to achieve the lowest price and highest transparency.
  • Decommissioning costs for nuclear plants are typically estimated at 15% of overnight costs, but there are no global examples of fully decommissioned plants to provide a definitive benchmark.

Cite the original document

APA
Heinrich Böll Stiftung Southern Africa (2016). Technical Workshop on the Economics of Nuclear Energy: 9 March 2016, Johannesburg. https://za.boell.org/sites/default/files/uploads/2016/05/summary_of_march_2016_technical_workshop_on_the_economics_of_nuclear_energy.pdf
Chicago
Heinrich Böll Stiftung Southern Africa. Technical Workshop on the Economics of Nuclear Energy: 9 March 2016, Johannesburg. 2016. https://za.boell.org/sites/default/files/uploads/2016/05/summary_of_march_2016_technical_workshop_on_the_economics_of_nuclear_energy.pdf.
Wikipedia
{{cite report |author=Heinrich Böll Stiftung Southern Africa |title=Technical Workshop on the Economics of Nuclear Energy: 9 March 2016, Johannesburg |date=9 March 2016 |url=https://za.boell.org/sites/default/files/uploads/2016/05/summary_of_march_2016_technical_workshop_on_the_economics_of_nuclear_energy.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document boellza-000173)}}
BibTeX
@techreport{heinrichbllstiftungsouthernafrica2016technical, author = {{Heinrich Böll Stiftung Southern Africa}}, title = {{Technical Workshop on the Economics of Nuclear Energy: 9 March 2016, Johannesburg}}, institution = {Heinrich Böll Stiftung Southern Africa}, year = {2016}, month = mar, url = {https://za.boell.org/sites/default/files/uploads/2016/05/summary_of_march_2016_technical_workshop_on_the_economics_of_nuclear_energy.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document boellza-000173} }

Full text

Collected · Record updated