Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The paper argues that South Africa's electricity planning is dominated by a narrow set of industrial interests and the needs of the utility Eskom, leading to a 'disconnect' with the country's green economy goals and climate commitments. It critiques the development of the IRP2 for lacking transparency, relying on potentially flawed cost analyses from the US-based EPRI, and marginalizing civil society engagement. While the government established an Inter-Ministerial Committee on Energy to improve coordination, the authors contend that the resulting Draft IRP2 remains too conservative regarding energy efficiency and renewables, and overly reliant on coal and nuclear power, potentially contradicting commitments made in the Copenhagen Accord.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The development of the Integrated Resource Plan 2 (IRP2) has been characterized by a lack of transparency and a perceived bias toward energy-intensive industries. The Department of Energy appointed 'technical advisors' from companies including BHP Billiton, Exxaro, and Xstrata, while denying requests for details of their deliberations under the Promotion of Access to Information Act (PAIA).
  • There is a significant disconnect between the Draft IRP2 and South Africa's climate and economic goals. The plan's assumptions on energy demand and intensity are viewed as inconsistent with the New Growth Path and the second Industrial Policy Action Plan's aspirations for a green economy. Furthermore, the preferred 'Revised Balanced Scenario' is reported to be inconsistent with emission reduction commitments from the Copenhagen Accord.
  • The cost analysis used to inform the IRP2, conducted by the US-based Electricity Policy Research Institute (EPRI), is criticized for underestimating the costs of nuclear power compared to recent global trends. This imbalanced data is believed to have strongly influenced the Department of Energy's preference for nuclear energy as a base load alternative to coal.
  • The Draft IRP2 proposes a massive increase in installed generation capacity, from 259,685 GWh to at least 454,367 GWh. While it increases the role of renewable energy compared to previous plans, the authors describe the envisioned deployment as 'conservative' and the energy efficiency scenarios as 'excessively conservative'.
  • Civil society and environmental groups have faced significant barriers to meaningful participation in the IRP2 process. Despite initial agreements to engage with the Energy Caucus and workshops organized by Idasa and WWF South Africa, the Department of Energy has failed to follow through on commitments to participate or provide requested information.
  • The regulatory role of NERSA has become problematic, as it approved a 25% annual price increase for Eskom from 2010-2012 to finance infrastructure like the Medupi and Kusile coal plants before a robust long-term planning framework (the IRP2) was fully developed.

Cite the original document

APA
Pienaar, G., & Nakhooda, S. (2014). The Great Policy Disconnect: Climate Change. Heinrich Böll Stiftung Southern Africa. https://za.boell.org/en/2014/02/03/great-policy-disconnect-climate-change
Chicago
Pienaar, Gary, and Smita Nakhooda. The Great Policy Disconnect: Climate Change. Heinrich Böll Stiftung Southern Africa, 2014. https://za.boell.org/en/2014/02/03/great-policy-disconnect-climate-change.
Wikipedia
{{cite report |last1=Pienaar |first1=Gary |last2=Nakhooda |first2=Smita |title=The Great Policy Disconnect: Climate Change |publisher=Heinrich Böll Stiftung Southern Africa |date=3 February 2014 |url=https://za.boell.org/en/2014/02/03/great-policy-disconnect-climate-change |access-date=5 November 2026 |via=Climate Insights Directory (document boellza-000070)}}
BibTeX
@techreport{pienaar2014great, author = {Pienaar, Gary and Nakhooda, Smita}, title = {{The Great Policy Disconnect: Climate Change}}, institution = {Heinrich Böll Stiftung Southern Africa}, year = {2014}, month = feb, url = {https://za.boell.org/en/2014/02/03/great-policy-disconnect-climate-change}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document boellza-000070} }

Full text

Collected · Record updated