THIS IS NOT THE TIME FOR TIMETABLES. IT IS TIME FOR ECG TO INTRODUCE REDUNDANCY

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Africa Sustainable Energy Centre urges the Electricity Company of Ghana to prioritize system redundancy over load-shedding timetables to resolve power outages caused by operational gaps in transmission and distribution.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Current power disruptions in Ghana are primarily caused by gaps in operational planning and execution within the transmission and distribution segments, specifically a lack of adequate redundancy in critical infrastructure, rather than a shortage of generation capacity.
  • The Africa Sustainable Energy Centre recommends that the Electricity Company of Ghana (ECG) pause ongoing retrofits to restore normalcy and integrate redundancy into all critical systems to eliminate single points of failure.
  • Implementing load-shedding timetables is discouraged because it risks normalising a systemic problem that should instead be solved through better planning, coordination, and system design.

Cite the original document

APA
Centre-ASEC, A. S. E. (2026). THIS IS NOT THE TIME FOR TIMETABLES. IT IS TIME FOR ECG TO INTRODUCE REDUNDANCY. Africa Sustainable Energy Centre. https://www.asecafrica.org/asecgha/this-is-not-the-time-for-timetables-it-is-time-for-ecg-to-introduce-redundancy
Chicago
Centre-ASEC, Africa Sustainable Energy. THIS IS NOT THE TIME FOR TIMETABLES. IT IS TIME FOR ECG TO INTRODUCE REDUNDANCY. Africa Sustainable Energy Centre, 2026. https://www.asecafrica.org/asecgha/this-is-not-the-time-for-timetables-it-is-time-for-ecg-to-introduce-redundancy.
Wikipedia
{{cite press release |last1=Centre-ASEC |first1=Africa Sustainable Energy |title=THIS IS NOT THE TIME FOR TIMETABLES. IT IS TIME FOR ECG TO INTRODUCE REDUNDANCY |publisher=Africa Sustainable Energy Centre |date=28 April 2026 |url=https://www.asecafrica.org/asecgha/this-is-not-the-time-for-timetables-it-is-time-for-ecg-to-introduce-redundancy |access-date=5 November 2026 |via=Climate Insights Directory (document asecaf-000015)}}
BibTeX
@misc{centreasec2026this, author = {Centre-ASEC, Africa Sustainable Energy}, title = {{THIS IS NOT THE TIME FOR TIMETABLES. IT IS TIME FOR ECG TO INTRODUCE REDUNDANCY}}, publisher = {Africa Sustainable Energy Centre}, year = {2026}, month = apr, url = {https://www.asecafrica.org/asecgha/this-is-not-the-time-for-timetables-it-is-time-for-ecg-to-introduce-redundancy}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document asecaf-000015} }

Full text

Collected · Record updated