The document contends that Eskom's financial crisis is a synthetic result of neoliberal 'electricity for profit' policies and corporatisation rather than mere mismanagement. It argues that the current Renewable Energy Independent Power Producer Procurement Programme (REI4P) undermines Eskom's finances through expensive power purchase agreements (PPAs) and threatens energy sovereignty by relying on foreign technology. The authors propose a 'New Eskom' based on social ownership, funded by the Government Employees Pension Fund (GEPF) and the repudiation of 'odious' World Bank debt. Technically, the report warns that a transition to high levels of renewables requires massive state-led planning for grid stability and storage, which the for-profit IPP model cannot provide. It calls for a global 'public goods' approach to energy transition, including the transfer of technology and skills to the Global South.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Eskom's debt crisis, which reached over R445 billion by March 2019, is attributed to four primary factors: commercialisation, corruption and wasteful expenditure, expensive early contracts with Independent Power Producers (IPPs), and a sharp increase in low-grade coal prices since 2008-2010.
  • The report argues that the REI4P program contributes to Eskom's 'death spiral' because it guarantees profits for private companies through PPAs, regardless of whether the electricity is needed, while the utility bears the system-balancing and grid integration costs.
  • The authors claim that the 'least cost option' argument for renewables is misleading because the Levelised Cost of Energy (LCOE) ignores essential system costs, such as backup capacity and grid integration, which are borne by the public utility or consumers.
  • Global investment in renewables is described as stagnating or falling outside of China due to a 'three fall effect': falling bid prices lead to falling profits, which in turn lead to falling investment levels.
  • The report proposes using the Government Employees Pension Fund (GEPF) to fund Eskom, arguing that the fund is 'bloated' with surpluses and that shifting its investment from risky shares to bonds for Eskom would lower the cost of capital.
  • The authors call for the repudiation of a $3.75 billion World Bank loan used for the Medupi power station, labeling it 'odious debt' due to associated corruption involving the ANC and Hitachi Power Africa.
  • The report warns that expanding the REI4P program will lead to a loss of energy sovereignty, as most generating capacity would be operated under long-term PPAs with foreign companies using technologies from Europe or China.
  • Technical analysis suggests that achieving a high-renewables system (70-95% by 2050) requires massive capacity redundancy and infrastructure; for example, total installed capacity might need to grow from 48GW to 148GW to meet a 50% increase in demand.
  • The report advocates for 'Public-Public Partnerships' (PUPs) and a global 'public goods' approach to energy transition to bypass intellectual property restrictions and facilitate technology transfer to the Global South.
  • The proposed 'New Eskom' would be based on principles of democratic governance, including multi-stakeholder boards with representatives from labor, civil society, and users, moving away from the 'corporatisation' model.

Cite the original document

APA
Ashley, B., Chavez, D., Forslund, D., Sweeney, S., & Van Niekerk, S. (2020). ACHIEVING A JUST ENERGY TRANSITION FOR SOUTH AFRICA. Alternative Information & Development Centre. https://aidc.org.za/download/Eskom-Transformed-Full-Report-1.pdf
Chicago
Ashley, Brian, Daniel Chavez, Dick Forslund, Sean Sweeney, and Sandra Van Niekerk. ACHIEVING A JUST ENERGY TRANSITION FOR SOUTH AFRICA. Alternative Information & Development Centre, 2020. https://aidc.org.za/download/Eskom-Transformed-Full-Report-1.pdf.
Wikipedia
{{cite report |last1=Ashley |first1=Brian |last2=Chavez |first2=Daniel |last3=Forslund |first3=Dick |last4=Sweeney |first4=Sean |last5=Van Niekerk |first5=Sandra |title=ACHIEVING A JUST ENERGY TRANSITION FOR SOUTH AFRICA |publisher=Alternative Information & Development Centre |date=July 2020 |url=https://aidc.org.za/download/Eskom-Transformed-Full-Report-1.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document aidcza-000121)}}
BibTeX
@techreport{ashley2020achieving, author = {Ashley, Brian and Chavez, Daniel and Forslund, Dick and Sweeney, Sean and Van Niekerk, Sandra}, title = {{ACHIEVING A JUST ENERGY TRANSITION FOR SOUTH AFRICA}}, institution = {Alternative Information \& Development Centre}, year = {2020}, month = jul, url = {https://aidc.org.za/download/Eskom-Transformed-Full-Report-1.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document aidcza-000121} }

Full text

Collected · Record updated