ESKOM: A HISTORY OF HOW WE GOT HERE
Summary
The document examines the history of Eskom's corporatisation and argues that the government's plan to unbundle the utility into separate generation, transmission, and distribution entities will exacerbate the energy crisis and lead to 'marketization'. It contends that private investment is insufficient to meet climate targets due to a 'three-fall effect' where falling prices lead to falling profits and investment. Instead, it proposes a 'public pathway' involving the decorporatisation of Eskom, the cancellation of 'odious debt' (specifically a World Bank loan for the Medupi plant), and the reallocation of funds from the Government Employee Pension Fund (GEPF) to finance a low-carbon reindustrialisation programme.
Key insights
- The transition of Escom to Eskom between 1984 and 1987 marked a shift from a not-for-profit public entity to a commercial entity operating on market-based lines, moving away from 'Keynesian racial capitalism' toward a neoliberal state model.
- The 2008 load shedding crisis was caused by a combination of supply constraints due to the lack of a new build programme, maintenance backlogs, and the intentional reduction of coal piles to make the balance sheet more attractive for privatisation.
- The Medupi and Kusile coal-fired plants have significantly contributed to Eskom's debt crisis, greenhouse gas emissions, and water scarcity, while suffering from massive cost and time overruns.
- Unbundling Eskom into an Independent Transmission System and Market Operator (ITSMO) is viewed as a path to 'marketization' that will likely result in higher consumer tariffs and turn Eskom's generation division into a 'zombie' utility—financially unviable but too important to fail.
- Private sector investment in renewable energy is subject to a 'three-fall effect' where falling technology prices lead to falling profits, which subsequently lead to falling investment, making the private sector incapable of leading the scale of transition required to avert the climate crisis.
- The document proposes that Eskom's debt be reduced by writing off a $3.05 billion World Bank loan for the Medupi plant as 'odious debt' due to corruption and the loan's contradiction of climate goals.
- The Government Employee Pension Fund (GEPF) is identified as a potential source of funding for a just transition; shifting it from a fully funded scheme back to a 'pay-as-you-go' scheme could liberate over R1 trillion for sustainable industries.
- The Renewable Energy Independent Power Producer Procurement Programme (REI4P) has failed to drive local manufacturing, as evidenced by the fourth round where all solar panels were imported from China despite local capacity.
Cite the original document
- APA
- Baigrie, B., Brown, D., Cannard, J., Oelofsen, J., & van Niekerk, S. (2020). ESKOM: A HISTORY OF HOW WE GOT HERE. Alternative Information & Development Centre. https://aidc.org.za/download/22Why-Eskom-is-in-a-mess-and-what-to-do-about-it22.pdf
- Chicago
- Baigrie, Bruce, Dominic Brown, Jonathan Cannard, Jaco Oelofsen, and Sandra van Niekerk. ESKOM: A HISTORY OF HOW WE GOT HERE. Alternative Information & Development Centre, 2020. https://aidc.org.za/download/22Why-Eskom-is-in-a-mess-and-what-to-do-about-it22.pdf.
- Wikipedia
- {{cite report |last1=Baigrie |first1=Bruce |last2=Brown |first2=Dominic |last3=Cannard |first3=Jonathan |last4=Oelofsen |first4=Jaco |last5=van Niekerk |first5=Sandra |title=ESKOM: A HISTORY OF HOW WE GOT HERE |publisher=Alternative Information & Development Centre |date=September 2020 |url=https://aidc.org.za/download/22Why-Eskom-is-in-a-mess-and-what-to-do-about-it22.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document aidcza-000109)}}
- BibTeX
- @techreport{baigrie2020eskom, author = {Baigrie, Bruce and Brown, Dominic and Cannard, Jonathan and Oelofsen, Jaco and van Niekerk, Sandra}, title = {{ESKOM: A HISTORY OF HOW WE GOT HERE}}, institution = {Alternative Information \& Development Centre}, year = {2020}, month = sep, url = {https://aidc.org.za/download/22Why-Eskom-is-in-a-mess-and-what-to-do-about-it22.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document aidcza-000109} }
Full text
Collected · Record updated