The African Continental Power Systems Masterplan Support Studies – Geothermal Power Plants (GPP)
Summary
The report identifies a significant untapped geothermal potential of 15-20GW in East Africa, with only ~1GW currently installed. While geothermal provides reliable, low-cost baseload power, its expansion is hindered by high upfront exploration costs and risks. Kenya is highlighted as the regional leader due to its transparent regulatory frameworks and the establishment of the Geothermal Development Company to mitigate private sector risk.
Key insights
- East Africa possesses a total geothermal power plant (GPP) potential estimated between 15 and 20GW, yet it remains largely underexploited with a current total installed capacity of approximately 1GW.
- Geothermal energy is projected to increase its share of the African electricity mix from 0.7% in 2023 to 1.1% by 2040 according to the Continental Power System Masterplan (CMP).
- The East African Rift System (EARS) is the primary location for GPPs, with the eastern branch (including Ethiopia, Eritrea, Djibouti, Kenya, Somalia, and Tanzania north) having the greatest potential, while the western branch (including Burundi, Uganda, Rwanda, Tanzania west, Malawi, Mozambique, Zambia, and DRC) is better suited for direct use projects.
- Kenya is the dominant African leader in geothermal energy, with installed capacity of 986MWe as of 2021 and a target of up to 10GW by 2040, achieved through clear policy and the creation of the Geothermal Development Company (GDC) in 2008 to reduce upfront risks for private investors.
- The primary economic and technical barriers to GPP development are the high upfront drilling and exploration costs, which are high-risk sunk costs if the resource is insufficient, and the lack of transparent legal and regulatory frameworks in most African countries.
- Geothermal power offers a low-cost, reliable baseload supply with a levelized cost of electricity (LCOE) averaging between USD 0.049 and USD 0.085 per kWh from 2010 to 2020, providing essential ancillary support for grids integrating variable renewable energy.
Cite the original document
- APA
- Africa-EU Energy Partnership (2023). The African Continental Power Systems Masterplan Support Studies – Geothermal Power Plants (GPP). https://africa-eu-energy-partnership.org/wp-content/uploads/2023/08/GPP-Summary-Report_Final-clean.pdf
- Chicago
- Africa-EU Energy Partnership. The African Continental Power Systems Masterplan Support Studies – Geothermal Power Plants (GPP). 2023. https://africa-eu-energy-partnership.org/wp-content/uploads/2023/08/GPP-Summary-Report_Final-clean.pdf.
- Wikipedia
- {{cite report |author=Africa-EU Energy Partnership |title=The African Continental Power Systems Masterplan Support Studies – Geothermal Power Plants (GPP) |date=June 2023 |url=https://africa-eu-energy-partnership.org/wp-content/uploads/2023/08/GPP-Summary-Report_Final-clean.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document afreupar-000054)}}
- BibTeX
- @techreport{africaeuenergypartnership2023african, author = {{Africa-EU Energy Partnership}}, title = {{The African Continental Power Systems Masterplan Support Studies – Geothermal Power Plants (GPP)}}, institution = {Africa-EU Energy Partnership}, year = {2023}, month = jun, url = {https://africa-eu-energy-partnership.org/wp-content/uploads/2023/08/GPP-Summary-Report_Final-clean.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document afreupar-000054} }
Full text
Collected · Record updated