The EACOP is being constructed ... But at what cost?

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report documents significant negative socio-economic impacts from the construction of the EACOP and Tilenga feeder pipeline in Uganda, including land loss without consent, destruction of roads, and environmental damage. It highlights that while Uganda's oil revenues between 2013 and 2025 (over USD 868 million) could have funded small solar home systems for rural households, they remain insufficient for full national grid expansion.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Construction of the EACOP was approximately 82% complete by April 2026, while the Tilenga feeder pipeline was reported by communities to be in more advanced stages of development.
  • The construction process has caused severe socio-economic disruptions, including the unauthorized dumping of soil on community land, loss of productive farming land, and the creation of flooding and mudslides in wetlands that destroy agricultural investments.
  • Infrastructure damage and social instability have affected multiple districts; heavy trucks damaged roads in Hoima, Kikuube, Kakumiro, Lwengo, and Kyotera, while the influx of project workers is linked to gender-based violence, family breakdown, and rising school drop-outs.
  • Uganda faces a critical energy gap where only 18% of approximately 5.4 million rural households have electricity, and the country averages 200 hours of power outages per month.
  • Oil revenues exceeding USD 868 million generated between 2013 and 2025 were sufficient to cover the estimated USD 771 million (UGX 2.88 trillion) needed for small solar home systems for rural households, though they cannot fully fund the multi-billion dollar national grid expansion.

Cite the original document

APA
Africa Institute for Energy Governance (2026). The EACOP is being constructed ... But at what cost? https://www.afiego.org/wp-content/uploads/2026/06/Summary-of-publication-EACOP-is-being-constructed-but-at-what-cost-June-2026.pdf
Chicago
Africa Institute for Energy Governance. The EACOP is being constructed ... But at what cost? 2026. https://www.afiego.org/wp-content/uploads/2026/06/Summary-of-publication-EACOP-is-being-constructed-but-at-what-cost-June-2026.pdf.
Wikipedia
{{cite report |author=Africa Institute for Energy Governance |title=The EACOP is being constructed ... But at what cost? |date=June 2026 |url=https://www.afiego.org/wp-content/uploads/2026/06/Summary-of-publication-EACOP-is-being-constructed-but-at-what-cost-June-2026.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document afiego-000120)}}
BibTeX
@techreport{africainstituteforenergygovernance2026eacop, author = {{Africa Institute for Energy Governance}}, title = {{The EACOP is being constructed ... But at what cost?}}, institution = {Africa Institute for Energy Governance}, year = {2026}, month = jun, url = {https://www.afiego.org/wp-content/uploads/2026/06/Summary-of-publication-EACOP-is-being-constructed-but-at-what-cost-June-2026.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document afiego-000120} }

Full text

Collected · Record updated