AFIEGO demands the immediate revocation of new electricity connection charges in Uganda, arguing that the fees were implemented without public consultation and violate the 1999 Electricity Act.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The new approved connection charges for electricity in Uganda include costs ranging from 576,773 UGX for a no-pole single phase connection with a wired pre-paid split metre to 3,445,256 UGX for a no-pole three phase connection.
  • AFIEGO contends that the Electricity Regulatory Authority (ERA) violated the 1999 Electricity Act by allowing the minister to direct the increase of connection fees without public consultations, thereby interfering with ERA's independence as established in Section 4 and Section 16.
  • The document argues that the new fees violate Section 62 of the 1999 Electricity Act, which mandates the promotion and support of rural electrification programmes to ensure equitable regional access to electricity.
  • AFIEGO asserts that requiring customers who applied under the Electricity Connection Policy (ECP) before its suspension to pay top-up fees constitutes a breach of contract.
  • The notice demands an audit by the Auditor General into the implementation of the ECP from 2018 to the date of the letter to account for the planned USD 112 million.

Cite the original document

APA
Africa Institute for Energy Governance (n.d.). notice-of-intention-to-sue-era-and-umeme-over-new-connection-fees-10-december-2020-bb0a6e5da32fefa9.pdf. https://www.afiego.org/wp-content/uploads/2024/03/Notice-of-intention-to-sue-ERA-and-UMEME-over-new-connection-fees-10-December-2020.pdf
Chicago
Africa Institute for Energy Governance. notice-of-intention-to-sue-era-and-umeme-over-new-connection-fees-10-december-2020-bb0a6e5da32fefa9.pdf. n.d. https://www.afiego.org/wp-content/uploads/2024/03/Notice-of-intention-to-sue-ERA-and-UMEME-over-new-connection-fees-10-December-2020.pdf.
Wikipedia
{{cite press release |author=Africa Institute for Energy Governance |title=notice-of-intention-to-sue-era-and-umeme-over-new-connection-fees-10-december-2020-bb0a6e5da32fefa9.pdf |url=https://www.afiego.org/wp-content/uploads/2024/03/Notice-of-intention-to-sue-ERA-and-UMEME-over-new-connection-fees-10-December-2020.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document afiego-000088)}}
BibTeX
@misc{africainstituteforenergygovernancendnoticeofintentiontosueeraandumemeovernewconnectionfees10december2020bb0a6e5da32fefa9pdf, author = {{Africa Institute for Energy Governance}}, title = {{notice-of-intention-to-sue-era-and-umeme-over-new-connection-fees-10-december-2020-bb0a6e5da32fefa9.pdf}}, publisher = {Africa Institute for Energy Governance}, url = {https://www.afiego.org/wp-content/uploads/2024/03/Notice-of-intention-to-sue-ERA-and-UMEME-over-new-connection-fees-10-December-2020.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document afiego-000088} }

Full text

Collected · Record updated