A coalition of civil society organizations argues that Total's Tilenga ESMPs process violates the 1998 EIA regulations and demands that NEMA halt the process until ongoing court cases regarding procedural irregularities are resolved.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The development and review process for the Tilenga ESMPs is allegedly violating the 1998 EIA regulations, specifically Regulation 12 regarding effective public consultation and Regulation 10 regarding the requirement for Terms of Reference (ToR).
  • The draft ESMPs shared by Total on July 13, 2020, are criticized for providing an insufficient review period of 14 working days for civil society organizations to comment on 28 different documents.
  • The draft ESMPs contain significant gaps, including a lack of risk statements identified in the ESIA report, missing budgets for mitigation activities, undefined stakeholder roles, lack of legal analysis for compliance, and missing implementation timelines.
  • The ongoing ESMP process is being conducted despite pending High Court cases against NEMA and the Petroleum Authority of Uganda (PAU) concerning procedural illegalities in the 2018 Tilenga ESIA public review process.

Cite the original document

APA
Africa Institute for Energy Governance (n.d.). letter-to-nema-on-tilenga-esmps-05-august-2020-0f2e4e0f43c6b59f.pdf. https://www.afiego.org/wp-content/uploads/2024/03/LETTER-TO-NEMA-ON-TILENGA-ESMPS-05-August-2020.pdf
Chicago
Africa Institute for Energy Governance. letter-to-nema-on-tilenga-esmps-05-august-2020-0f2e4e0f43c6b59f.pdf. n.d. https://www.afiego.org/wp-content/uploads/2024/03/LETTER-TO-NEMA-ON-TILENGA-ESMPS-05-August-2020.pdf.
Wikipedia
{{cite press release |author=Africa Institute for Energy Governance |title=letter-to-nema-on-tilenga-esmps-05-august-2020-0f2e4e0f43c6b59f.pdf |url=https://www.afiego.org/wp-content/uploads/2024/03/LETTER-TO-NEMA-ON-TILENGA-ESMPS-05-August-2020.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document afiego-000079)}}
BibTeX
@misc{africainstituteforenergygovernancendlettertonemaontilengaesmps05august20200f2e4e0f43c6b59fpdf, author = {{Africa Institute for Energy Governance}}, title = {{letter-to-nema-on-tilenga-esmps-05-august-2020-0f2e4e0f43c6b59f.pdf}}, publisher = {Africa Institute for Energy Governance}, url = {https://www.afiego.org/wp-content/uploads/2024/03/LETTER-TO-NEMA-ON-TILENGA-ESMPS-05-August-2020.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document afiego-000079} }

Full text

Collected · Record updated