CSO MEMORANDUM OF PROPOSALS TO THE NATIONAL ENVIRONMENT MANAGENEMT AUTHORITY (NEMA) ON THE TILENGA PROJECT ESIA
Summary
A coalition of 15 civil society organisations calls for the rejection of the Tilenga project ESIA, asserting that it lacks concrete mitigation plans and relies on outdated environmental laws.
Key insights
- The ESIA fails to provide concrete measures or an Integrated Management Plan (IMP) to protect wildlife and aquatic life from oil risks, such as poaching and ecosystem degradation, and lacks detailed risk assessments for the River Nile bed.
- Social and economic mitigation measures are insufficient, relying on non-binding documents like the Land Acquisition and Resettlement Framework (LARF) rather than enforceable laws, and lacking costed plans for community influx and grievance management.
- The report lacks essential emergency and waste management plans, specifically missing an Oil Contingency Plan and an Emergency Response Plan to protect Lake Albert and the River Nile from pollution.
- The ESIA is based on outdated environmental laws (1995 National Environment Act and 1998 EIA Regulations) and does not address the risks of commencing the project before new legislation, such as the National Environment Bill of 2017, is enacted.
- Compensation for Project-Affected-Persons (PAPs) is contested, with reports of dissatisfaction regarding compensation rates and a lack of domestic law to ensure fair, adequate, and prompt payment.
- The ESIA does not provide a comparative analysis of the long-term economic value of biodiversity and tourism in Murchison Falls National Park against the 25 to 30 year lifespan of oil production.
- The project may create significant financial risk, as Uganda may borrow over $15 billion to finance oil developments, potentially compromising the country's capacity to conserve biodiversity due to debt obligations.
- The ESIA fails to address transboundary implications and potential tensions with the Democratic Republic of Congo (DRC) regarding the use of Lake Albert waters and the enforcement of the 2007 Uganda-DRC Ngurdoto Agreement.
Cite the original document
- APA
- Africa Institute for Energy Governance (2018). CSO MEMORANDUM OF PROPOSALS TO THE NATIONAL ENVIRONMENT MANAGENEMT AUTHORITY (NEMA) ON THE TILENGA PROJECT ESIA. https://www.afiego.org/wp-content/uploads/2024/03/Final-CSO-memorandum-of-proposals-on-Tilenga-ESIA-to-NEMA-9-NOV-2018.pdf
- Chicago
- Africa Institute for Energy Governance. CSO MEMORANDUM OF PROPOSALS TO THE NATIONAL ENVIRONMENT MANAGENEMT AUTHORITY (NEMA) ON THE TILENGA PROJECT ESIA. 2018. https://www.afiego.org/wp-content/uploads/2024/03/Final-CSO-memorandum-of-proposals-on-Tilenga-ESIA-to-NEMA-9-NOV-2018.pdf.
- Wikipedia
- {{cite press release |author=Africa Institute for Energy Governance |title=CSO MEMORANDUM OF PROPOSALS TO THE NATIONAL ENVIRONMENT MANAGENEMT AUTHORITY (NEMA) ON THE TILENGA PROJECT ESIA |date=8 November 2018 |url=https://www.afiego.org/wp-content/uploads/2024/03/Final-CSO-memorandum-of-proposals-on-Tilenga-ESIA-to-NEMA-9-NOV-2018.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document afiego-000062)}}
- BibTeX
- @misc{africainstituteforenergygovernance2018cso, author = {{Africa Institute for Energy Governance}}, title = {{CSO MEMORANDUM OF PROPOSALS TO THE NATIONAL ENVIRONMENT MANAGENEMT AUTHORITY (NEMA) ON THE TILENGA PROJECT ESIA}}, publisher = {Africa Institute for Energy Governance}, year = {2018}, month = nov, url = {https://www.afiego.org/wp-content/uploads/2024/03/Final-CSO-memorandum-of-proposals-on-Tilenga-ESIA-to-NEMA-9-NOV-2018.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document afiego-000062} }
Full text
Collected · Record updated