csos-petition-to-parliament-on-karuma-dam-defects-sept-22-26-4c301691b6ea862d.pdf

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

Civil society organisations are petitioning the Ugandan Parliament to reject additional funding for the Karuma Hydropower dam, arguing that the project's defects, such as missing log boom lines, should be the contractor's financial responsibility.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Karuma Hydropower dam was commissioned in September 2024 without the reinstallation of log boom lines, which were critical for trapping water weeds and debris; their absence has led to severe infestation of water weeds affecting operations.
  • The Karuma Hydropower project experienced significant delays and cost overruns, taking approximately 114 months to implement against a 60-month contract, with costs increasing from an original budget of $1.7 billion (UGX 6.323 trillion) to UGX 8.18 trillion.
  • Uganda incurred UGX 113.9 billion in interest charges because it began servicing the project loan from the Export-Import Bank of China before the dam started generating electricity.
  • Approximately 119 households displaced by the Karuma Hydropower Project remain uncompensated and not physically resettled, with the government owing roughly UGX 70 billion to Project Affected Persons (PAPs).
  • Despite high public investment in hydropower—over $4.1 billion (over UGX 15 trillion) spent on dams including Owen Falls, Kiira, Bujagali, Isimba, and Achwa—only 25.3% of Ugandans have access to grid electricity.

Cite the original document

APA
Africa Institute for Energy Governance (n.d.). csos-petition-to-parliament-on-karuma-dam-defects-sept-22-26-4c301691b6ea862d.pdf. https://www.afiego.org/wp-content/uploads/2026/09/CSOs-petition-to-Parliament-on-Karuma-dam-defects-Sept-22-26.pdf
Chicago
Africa Institute for Energy Governance. csos-petition-to-parliament-on-karuma-dam-defects-sept-22-26-4c301691b6ea862d.pdf. n.d. https://www.afiego.org/wp-content/uploads/2026/09/CSOs-petition-to-Parliament-on-Karuma-dam-defects-Sept-22-26.pdf.
Wikipedia
{{cite press release |author=Africa Institute for Energy Governance |title=csos-petition-to-parliament-on-karuma-dam-defects-sept-22-26-4c301691b6ea862d.pdf |url=https://www.afiego.org/wp-content/uploads/2026/09/CSOs-petition-to-Parliament-on-Karuma-dam-defects-Sept-22-26.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document afiego-000052)}}
BibTeX
@misc{africainstituteforenergygovernancendcsospetitiontoparliamentonkarumadamdefectssept22264c301691b6ea862dpdf, author = {{Africa Institute for Energy Governance}}, title = {{csos-petition-to-parliament-on-karuma-dam-defects-sept-22-26-4c301691b6ea862d.pdf}}, publisher = {Africa Institute for Energy Governance}, url = {https://www.afiego.org/wp-content/uploads/2026/09/CSOs-petition-to-Parliament-on-Karuma-dam-defects-Sept-22-26.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document afiego-000052} }

Full text

Collected · Record updated