CSOS COMMUNIQUE CALLING ON THE AUDITOR GENERAL TO AUDIT BUJAGALI DAM PROJECT AND TAX WAIVERS

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

A communique from 13 CSOs argues that tax exemptions for Bujagali Energy Ltd have failed to lower electricity costs and calls for a forensic audit to uncover corruption and mismanagement in Uganda's energy sector.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Despite continuous tax exemptions for the Bujagali dam project since 2012, electricity tariffs remain high and unaffordable for over 80% of Ugandans.
  • The current power tariff from the Bujagali dam is US cents 8.3 kWh, which exceeds the government's target of US cents 5 per kWh.
  • Uganda is producing significant excess power, known as deemed energy, which the government must pay for despite a lack of market demand; in the FY2022/2023 budget, UGX 190 billion was allocated for this purpose.
  • The Bujagali Energy Ltd (BEL) irregularly claimed insurance of over UGX 427 million, and the government irregularly paid billions to the company that were already included in the tariff costs.
  • Uganda's total public debt reached UGX 80.7 trillion in the 2023/24 budget, with a significant portion attributed to energy projects like the Karuma dam ($1.7bn loan) and Isimba dam ($567m loan) from the Exim Bank of China.
  • The Rural Electrification Agency (REA) was disbanded without a performance evaluation audit, despite operating in an opaque manner and failing to yield positive returns on trillions of shillings in investment.
  • The electrification rate in Uganda is 19%, one of the lowest in the world, and the share of Ugandans using grid-based hydropower decreased from 24% in 2019 to 19% in 2020 due to high tariffs.

Cite the original document

APA
Africa Institute for Energy Governance (2023). CSOS COMMUNIQUE CALLING ON THE AUDITOR GENERAL TO AUDIT BUJAGALI DAM PROJECT AND TAX WAIVERS. https://www.afiego.org/wp-content/uploads/2024/03/CSOs-communique-calling-on-the-Auditor-General-to-audit-the-Bujagali-project-and-tax-waivers.pdf
Chicago
Africa Institute for Energy Governance. CSOS COMMUNIQUE CALLING ON THE AUDITOR GENERAL TO AUDIT BUJAGALI DAM PROJECT AND TAX WAIVERS. 2023. https://www.afiego.org/wp-content/uploads/2024/03/CSOs-communique-calling-on-the-Auditor-General-to-audit-the-Bujagali-project-and-tax-waivers.pdf.
Wikipedia
{{cite press release |author=Africa Institute for Energy Governance |title=CSOS COMMUNIQUE CALLING ON THE AUDITOR GENERAL TO AUDIT BUJAGALI DAM PROJECT AND TAX WAIVERS |date=1 August 2023 |url=https://www.afiego.org/wp-content/uploads/2024/03/CSOs-communique-calling-on-the-Auditor-General-to-audit-the-Bujagali-project-and-tax-waivers.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document afiego-000049)}}
BibTeX
@misc{africainstituteforenergygovernance2023csos, author = {{Africa Institute for Energy Governance}}, title = {{CSOS COMMUNIQUE CALLING ON THE AUDITOR GENERAL TO AUDIT BUJAGALI DAM PROJECT AND TAX WAIVERS}}, publisher = {Africa Institute for Energy Governance}, year = {2023}, month = aug, url = {https://www.afiego.org/wp-content/uploads/2024/03/CSOs-communique-calling-on-the-Auditor-General-to-audit-the-Bujagali-project-and-tax-waivers.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document afiego-000049} }

Full text

Collected · Record updated