OPEN LETTER TO THE UGANDAN PRESIDENT TO ADDRESS OBSTACLES TO CLEAN ENERGY TRANSITION

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

A coalition of Ugandan civil society groups argues that massive investments in oil projects and systemic failures in the electricity sector are undermining Uganda's transition to clean energy.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Planned investments of over USD 15 billion in oil projects, including the East African Crude Oil Pipeline (EACOP), Tilenga, and Kingfisher, are expected to increase Uganda's public debt and limit the capacity to fund clean energy. By December 2021, national debt exceeded USD 19 billion, and the debt-to-GDP ratio is estimated to hit 52.9% this financial year.
  • Oil exploitation activities have led to ecosystem destruction in the Albertine Graben, including land grabbing in the Bugoma forest for sugarcane and the construction of roads through Murchison Falls National Park and Budongo central forest reserve without participatory Environmental and Social Impact Assessment (ESIA) processes.
  • Despite increasing electricity generation capacity from 60mw in 1986 to over 1,300mw, the sector suffers from high power prices and low access due to failed reforms, lack of transparency, and corruption.
  • The 'Free' Electricity Connections Policy, launched in 2018 with over USD 400 million in investment, has a performance rate of only 40%, with only 359,987 out of 900,000 targeted connections made by December 2021.
  • Uganda faces a 'deemed energy' problem where high tariffs limit consumption, leaving hundreds of megawatts as excess power that citizens must pay for; peak consumption is less than 800mw and off-peak is less than 400mw.
  • Tax exemptions provided since 2015 to Bujagali Energy Limited for the 250mw Bujagali dam have resulted in losses of over UGX 388 billion for Ugandans without reducing electricity tariffs to the promised USD 5 cents per kilowatt.

Cite the original document

APA
Kamugisha, D. (2022). OPEN LETTER TO THE UGANDAN PRESIDENT TO ADDRESS OBSTACLES TO CLEAN ENERGY TRANSITION. Africa Institute for Energy Governance. https://www.afiego.org/wp-content/uploads/2024/03/CSO-open-letter-to-the-president-on-energy-transition-11-August-2022.pdf
Chicago
Kamugisha, Dickens. OPEN LETTER TO THE UGANDAN PRESIDENT TO ADDRESS OBSTACLES TO CLEAN ENERGY TRANSITION. Africa Institute for Energy Governance, 2022. https://www.afiego.org/wp-content/uploads/2024/03/CSO-open-letter-to-the-president-on-energy-transition-11-August-2022.pdf.
Wikipedia
{{cite press release |last1=Kamugisha |first1=Dickens |title=OPEN LETTER TO THE UGANDAN PRESIDENT TO ADDRESS OBSTACLES TO CLEAN ENERGY TRANSITION |publisher=Africa Institute for Energy Governance |date=11 August 2022 |url=https://www.afiego.org/wp-content/uploads/2024/03/CSO-open-letter-to-the-president-on-energy-transition-11-August-2022.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document afiego-000043)}}
BibTeX
@misc{kamugisha2022open, author = {Kamugisha, Dickens}, title = {{OPEN LETTER TO THE UGANDAN PRESIDENT TO ADDRESS OBSTACLES TO CLEAN ENERGY TRANSITION}}, publisher = {Africa Institute for Energy Governance}, year = {2022}, month = aug, url = {https://www.afiego.org/wp-content/uploads/2024/03/CSO-open-letter-to-the-president-on-energy-transition-11-August-2022.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document afiego-000043} }

Full text

Collected · Record updated