COMMUNIQUE CALLING ON PRESIDENT YOWERI MUSEVENI TO STOP FEASIBILITY STUDY FOR A HYDROPOWER DAM AT MURCHISON FALLS

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

A coalition of civil society organisations calls on President Yoweri Museveni to stop the feasibility study for a dam at Murchison Falls, arguing that Uganda's energy sector is plagued by high debt and low grid access despite billions in investment.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Ugandan government has invested over $3 billion in dams and distribution lines in the five years preceding February 2020, yet grid electricity access remains low at 24%.
  • The power sector accounts for over 35% of Uganda's national debt, which is estimated to be over $13 billion, and has received over 10% of annual budget allocations for approximately ten years.
  • Due to the high cost of electricity—nearly Shs. 1,000 per unit for domestic consumers—over 90% of Ugandans rely on charcoal or firewood, leading to the destruction of forests and wetlands and worsening climate change effects.
  • Existing hydropower infrastructure is underperforming; the 183-mw Isimba dam produces only 90mw due to a lack of an evacuation line, and the government pays Shs. 10 million per hour for the failure to construct an evacuation line for the 43mw-Achwa II dam.
  • Off-grid energy access, at 26%, has surpassed grid power access (24%), indicating a preference for off-grid solar power among rural Ugandans.

Cite the original document

APA
Kamugisha, D. (2020). COMMUNIQUE CALLING ON PRESIDENT YOWERI MUSEVENI TO STOP FEASIBILITY STUDY FOR A HYDROPOWER DAM AT MURCHISON FALLS. Africa Institute for Energy Governance. https://www.afiego.org/wp-content/uploads/2024/03/CSO-communique-against-conducting-a-feasibility-study-for-a-dam-at-Murchison-Falls-24-February-2020.pdf
Chicago
Kamugisha, Dickens. COMMUNIQUE CALLING ON PRESIDENT YOWERI MUSEVENI TO STOP FEASIBILITY STUDY FOR A HYDROPOWER DAM AT MURCHISON FALLS. Africa Institute for Energy Governance, 2020. https://www.afiego.org/wp-content/uploads/2024/03/CSO-communique-against-conducting-a-feasibility-study-for-a-dam-at-Murchison-Falls-24-February-2020.pdf.
Wikipedia
{{cite press release |last1=Kamugisha |first1=Dickens |title=COMMUNIQUE CALLING ON PRESIDENT YOWERI MUSEVENI TO STOP FEASIBILITY STUDY FOR A HYDROPOWER DAM AT MURCHISON FALLS |publisher=Africa Institute for Energy Governance |date=24 February 2020 |url=https://www.afiego.org/wp-content/uploads/2024/03/CSO-communique-against-conducting-a-feasibility-study-for-a-dam-at-Murchison-Falls-24-February-2020.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document afiego-000030)}}
BibTeX
@misc{kamugisha2020communique, author = {Kamugisha, Dickens}, title = {{COMMUNIQUE CALLING ON PRESIDENT YOWERI MUSEVENI TO STOP FEASIBILITY STUDY FOR A HYDROPOWER DAM AT MURCHISON FALLS}}, publisher = {Africa Institute for Energy Governance}, year = {2020}, month = feb, url = {https://www.afiego.org/wp-content/uploads/2024/03/CSO-communique-against-conducting-a-feasibility-study-for-a-dam-at-Murchison-Falls-24-February-2020.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document afiego-000030} }

Full text

Collected · Record updated