28 REASONS WHY OIL AND GAS WILL FAIL UGANDA’S ENERGY TRANSITION PLAN

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This report by AFIEGO identifies 28 reasons why oil and gas exploitation in Uganda will fail the country's Energy Transition Plan, most notably by creating a 'lock-in effect' that diverts investment and policy focus away from renewable energy.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Oil and gas projects are projected to emit 3,791 metric tons of carbon, which is 25 times the combined yearly emissions of Uganda and Tanzania, threatening the national goal of reducing greenhouse gas emissions by 22% by 2030.
  • The East African Crude Oil Pipeline (EACOP) poses severe environmental risks, including passing through nearly 2,000 sq. km of protected areas and threatening habitats for endangered species like chimpanzees and African elephants.
  • Uganda's public debt has risen significantly due to borrowing for oil and gas infrastructure, increasing from USD 2.7 billion in 2005/2006 to a projected USD 25.716 billion by June 2024, which limits funding for the renewable energy sector.
  • Oil development has caused significant socioeconomic displacement; the EACOP project has displaced over 14,000 households, while the Tilenga project affected 4,865 households (31,716 individuals).
  • The government's focus on oil and gas creates a 'lock-in effect' and diverts policy and financial resources away from sustainable alternatives like solar, wind, and hydropower.
  • Corruption and mismanagement in the natural resources sector are severe, with the Inspector General of Government reporting annual losses of UGX 868 billion in contract royalties and total annual corruption losses of UGX 10 trillion.
  • Oil exploitation threatens water and food security, particularly for the 42 million people in East Africa dependent on Lake Victoria, where a third of the EACOP route is located.

Cite the original document

APA
Africa Institute for Energy Governance (2024). 28 REASONS WHY OIL AND GAS WILL FAIL UGANDA’S ENERGY TRANSITION PLAN. https://www.afiego.org/wp-content/uploads/2024/11/28-reasons-why-oil-and-gas-will-fail-the-ETP-November-2024.pdf
Chicago
Africa Institute for Energy Governance. 28 REASONS WHY OIL AND GAS WILL FAIL UGANDA’S ENERGY TRANSITION PLAN. 2024. https://www.afiego.org/wp-content/uploads/2024/11/28-reasons-why-oil-and-gas-will-fail-the-ETP-November-2024.pdf.
Wikipedia
{{cite report |author=Africa Institute for Energy Governance |title=28 REASONS WHY OIL AND GAS WILL FAIL UGANDA’S ENERGY TRANSITION PLAN |date=September 2024 |url=https://www.afiego.org/wp-content/uploads/2024/11/28-reasons-why-oil-and-gas-will-fail-the-ETP-November-2024.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document afiego-000006)}}
BibTeX
@techreport{africainstituteforenergygovernance2024reasons, author = {{Africa Institute for Energy Governance}}, title = {{28 REASONS WHY OIL AND GAS WILL FAIL UGANDA’S ENERGY TRANSITION PLAN}}, institution = {Africa Institute for Energy Governance}, year = {2024}, month = sep, url = {https://www.afiego.org/wp-content/uploads/2024/11/28-reasons-why-oil-and-gas-will-fail-the-ETP-November-2024.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document afiego-000006} }

Full text

Collected · Record updated