Interim Statement on the Termination of PDS Concession

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Africa Centre for Energy Policy (ACEP) argues that the termination of the PDS concession was a necessary response to invalid insurance guarantees, though it criticizes the government's poor management of the process.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The termination of the PDS concession was a credible response to the discovery of defects in the insurance guarantees, which were deemed invalid by Ghanaian experts and government investigations because the assumed reinsurer, Al Koot Insurance, did not underwrite the policy according to corporate guidelines.
  • ACEP contends that the FTI report, commissioned by MiDA and endorsed by MCC, was skewed to exonerate transaction advisors (IFC and Hunton Andrews Kurth) and failed to explain how the validity of the insurance was verified before the transfer date.
  • The bid process for the concession was flawed due to the introduction of a 51 percent local participation requirement without a transparent process, and the subsequent use of a Hong Kong-based Special Purpose Vehicle (SPV) by Meralco to isolate its performance from the parent company.
  • The failure of the PSP threatens the sustainability of private investment in the sector and may negatively impact American businesses that rely on a liquid power sector for equipment supply and cashflow, as well as delaying generation investments tied to General Electric turbines.
  • ACEP proposes a new concession framework to fix the distribution segment, suggesting a structure where Tier Two Pension and Life Insurance Funds hold a 55% stake, other institutional investments (SSNIT and GIIF) hold 25%, and individual or private investments hold 20%.

Cite the original document

APA
Africa Centre for Energy Policy (2019). Interim Statement on the Termination of PDS Concession. https://acep.africa/wp-content/uploads/2023/03/InterimStatementontheterminationofPDSConcession.pdf
Chicago
Africa Centre for Energy Policy. Interim Statement on the Termination of PDS Concession. 2019. https://acep.africa/wp-content/uploads/2023/03/InterimStatementontheterminationofPDSConcession.pdf.
Wikipedia
{{cite press release |author=Africa Centre for Energy Policy |title=Interim Statement on the Termination of PDS Concession |date=29 October 2019 |url=https://acep.africa/wp-content/uploads/2023/03/InterimStatementontheterminationofPDSConcession.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document acep-000133)}}
BibTeX
@misc{africacentreforenergypolicy2019interim, author = {{Africa Centre for Energy Policy}}, title = {{Interim Statement on the Termination of PDS Concession}}, publisher = {Africa Centre for Energy Policy}, year = {2019}, month = oct, url = {https://acep.africa/wp-content/uploads/2023/03/InterimStatementontheterminationofPDSConcession.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document acep-000133} }

Full text

Collected · Record updated