The Africa Centre for Energy Policy (ACEP) reports that the Ghana National Gas Company (Ghana Gas) has suffered from significant governance failures, including the sole-sourcing of contracts and a lack of parliamentary oversight. The Atuabo Gas project has been delayed by four years, costing the country an estimated US$2.2 billion in lost savings and revenues. ACEP highlights environmental risks from transporting LPG by road and financial risks stemming from a joint venture to build an LNG facility in Benin. The report recommends restructuring Ghana Gas as a subsidiary of the Ghana National Petroleum Corporation (GNPC) and increasing parliamentary scrutiny.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The establishment of Ghana Gas as a limited liability company has created governance risks, as the company avoids the transparent investment approval processes required of the Ghana National Petroleum Corporation (GNPC) despite using public funds. Specifically, a US$850 million EPC Agreement with SINOPEC was sole-sourced without parliamentary approval.
  • The Atuabo Gas project (Western Corridor Gas Infrastructure Development Project) has been delayed by four years, with a revised completion date of June 2014. ACEP estimates these delays have cost Ghana an average of US$550 million per year, totaling US$2.2 billion over four years, primarily due to the Volta River Authority's (VRA) continued reliance on expensive crude oil imports.
  • Delays in the gas project have led to the excessive re-injection of gas into oil wells, which has reduced oil production by 3,000 barrels daily and resulted in the loss of some of the 200 bcf of foundation gas provided for free by Jubilee partners.
  • Ghana faces a high risk of defaulting on its China Development Bank (CDB) loan repayment due in mid-2015 because the project delays have prevented Ghana Gas from generating the necessary revenues. This threatens the Annual Budget Funding Amount (ABFA), as the entire facility is collateralized against it.
  • A Memorandum of Understanding with Quantum Terminals Ltd grants the company exclusive rights for 25 years to build and operate an LPG holding facility and act as the sole off-taker. ACEP notes that the decision to transport 700 metric tons of LPG daily by road to Accra, rather than by sea, poses serious health and environmental risks and was done without permits from the Environmental Protection Agency (EPA) or the National Petroleum Authority (NPA).
  • Ghana Gas entered a Joint Venture (JV) with Afgen to build an LNG re-gasification facility in Benin. ACEP argues this is illogical as Benin does not produce natural gas, and the arrangement exposes Ghana to financial risks, potential 'pay-or-take' clauses for expensive LNG (US$14-16 per mmbtu), and security risks due to previous pipeline ruptures in Benin.

Cite the original document

APA
Africa Centre for Energy Policy (n.d.). Ghana Gas Report. https://acep.africa/wp-content/uploads/2023/03/Ghana-Gas-Report-May-2014.pdf
Chicago
Africa Centre for Energy Policy. Ghana Gas Report. n.d. https://acep.africa/wp-content/uploads/2023/03/Ghana-Gas-Report-May-2014.pdf.
Wikipedia
{{cite report |author=Africa Centre for Energy Policy |title=Ghana Gas Report |url=https://acep.africa/wp-content/uploads/2023/03/Ghana-Gas-Report-May-2014.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document acep-000125)}}
BibTeX
@techreport{africacentreforenergypolicyndghana, author = {{Africa Centre for Energy Policy}}, title = {{Ghana Gas Report}}, institution = {Africa Centre for Energy Policy}, url = {https://acep.africa/wp-content/uploads/2023/03/Ghana-Gas-Report-May-2014.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document acep-000125} }

Full text

Collected · Record updated