ACEP’s COMMENTS ON THE POWER PURCHASE AGREEMENT BETWEEN EARLY POWER LIMITED AND THE ELECTRICITY COMPANY OF GHANA

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Africa Centre for Energy Policy finds that while the Early Power Limited project improves fuel security and risk allocation through a Put-Call Option Agreement, the project's cost of $953.4 million appears high for the added capacity.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The project has transitioned from an emergency project to a regular long-term Independent Power Producer (IPP), increasing capacity from 344MW to 400MW by converting a 142.5MW simple cycle plant to a combined cycle plant with an additional 50MW steam turbine.
  • The Put-Call Option Agreement (PCOA) reduces government risk compared to the previous Government Consent and Support Agreement (GCSA) by capping maximum liabilities at the outstanding debt, projected at 70% of the project cost, or $667 million.
  • The project enhances fuel security by constructing LPG import and storage infrastructure, including a 12-inch discharge pipeline at Tema Oil Refinery (TOR) that will allow Ghana to import three times more LPG per year.
  • A critical flaw in the PPA is that while the plant can switch to natural gas, the buyer (ECG) is still obligated to pay charges based on LPG prices even if the investors use cheaper natural gas.
  • The total project cost increased from $647.7 million to $953.4 million; the estimated additional EPC cost for the 50MW steam installation ($150 - $190 million) is considered high.
  • The project's capacity charge structure is more favorable than other PPAs because ECG is not required to pay if the facility lacks fuel due to the investors' failure to supply it.

Cite the original document

APA
Africa Centre for Energy Policy (n.d.). ACEP’s COMMENTS ON THE POWER PURCHASE AGREEMENT BETWEEN EARLY POWER LIMITED AND THE ELECTRICITY COMPANY OF GHANA. https://acep.africa/wp-content/uploads/2023/03/EARLYPOWER-ACEPCOMMENTS.pdf
Chicago
Africa Centre for Energy Policy. ACEP’s COMMENTS ON THE POWER PURCHASE AGREEMENT BETWEEN EARLY POWER LIMITED AND THE ELECTRICITY COMPANY OF GHANA. n.d. https://acep.africa/wp-content/uploads/2023/03/EARLYPOWER-ACEPCOMMENTS.pdf.
Wikipedia
{{cite press release |author=Africa Centre for Energy Policy |title=ACEP’s COMMENTS ON THE POWER PURCHASE AGREEMENT BETWEEN EARLY POWER LIMITED AND THE ELECTRICITY COMPANY OF GHANA |url=https://acep.africa/wp-content/uploads/2023/03/EARLYPOWER-ACEPCOMMENTS.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document acep-000105)}}
BibTeX
@misc{africacentreforenergypolicyndaceps, author = {{Africa Centre for Energy Policy}}, title = {{ACEP’s COMMENTS ON THE POWER PURCHASE AGREEMENT BETWEEN EARLY POWER LIMITED AND THE ELECTRICITY COMPANY OF GHANA}}, publisher = {Africa Centre for Energy Policy}, url = {https://acep.africa/wp-content/uploads/2023/03/EARLYPOWER-ACEPCOMMENTS.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document acep-000105} }

Full text

Collected · Record updated