ADVISORY REPORT ON GHANA'S NEW PETROLEUM (EXPLORATION AND PRODUCTION) BILL 2014

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Africa Centre for Energy Policy finds that while Ghana's draft Petroleum Bill 2014 improves upon previous laws, it grants excessive unregulated discretionary powers to the Minister of Energy that could undermine transparency and competitive bidding.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The draft Bill introduces an open and competitive tender regime for oil blocks, but allows the Minister to ignore these outcomes in favor of direct negotiations without requiring a public justification for doing so.
  • The Bill mandates the establishment of a public register of petroleum agreements, licenses, and permits by the Petroleum Commission, though it remains unclear if full primary contracts will be disclosed.
  • Fiscal terms are becoming more stringent, including an increase in initial carried interest from 10% to a minimum of 15%, and the introduction of capital gain tax and thin capitalization rules to harmonize the sector with the Internal Revenue Act, 2000.
  • The draft Bill introduces reconnaissance licensing to promote data acquisition in unlicensed basins, but contains contradictions regarding whether these licenses grant exclusive or non-exclusive rights.
  • The duration of Petroleum Agreements is reduced from 30 to 25 years, which may discourage investment in projects with long gestation periods, such as gas projects.
  • The Bill leaves the determination of commerciality to the contractor, which the report argues should instead be defined and reviewed from the host nation's perspective to ensure prudent exploitation.
  • There is a risk of regulatory conflict because the Bill grants the Minister powers over infrastructure installation and tariff determination that may overlap with the mandates of the Energy Commission and the Public Utilities Regulatory Commission.
  • Environmental protections are based on the Polluter-Pays principle, but the report recommends adding mandatory requirements for independent third-party certification of blow-out preventers and relief well drilling plans.

Cite the original document

APA
Africa Centre for Energy Policy (2014). ADVISORY REPORT ON GHANA'S NEW PETROLEUM (EXPLORATION AND PRODUCTION) BILL 2014. https://acep.africa/wp-content/uploads/2023/03/Analysis-of-EP-BIll-1.pdf
Chicago
Africa Centre for Energy Policy. ADVISORY REPORT ON GHANA'S NEW PETROLEUM (EXPLORATION AND PRODUCTION) BILL 2014. 2014. https://acep.africa/wp-content/uploads/2023/03/Analysis-of-EP-BIll-1.pdf.
Wikipedia
{{cite report |author=Africa Centre for Energy Policy |title=ADVISORY REPORT ON GHANA'S NEW PETROLEUM (EXPLORATION AND PRODUCTION) BILL 2014 |date=March 2014 |url=https://acep.africa/wp-content/uploads/2023/03/Analysis-of-EP-BIll-1.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document acep-000083)}}
BibTeX
@techreport{africacentreforenergypolicy2014advisory, author = {{Africa Centre for Energy Policy}}, title = {{ADVISORY REPORT ON GHANA'S NEW PETROLEUM (EXPLORATION AND PRODUCTION) BILL 2014}}, institution = {Africa Centre for Energy Policy}, year = {2014}, month = mar, url = {https://acep.africa/wp-content/uploads/2023/03/Analysis-of-EP-BIll-1.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document acep-000083} }

Full text

Collected · Record updated