Press Statement By Africa Centre For Energy Policy( ACEP) On Challenges Facing Ghana’s Power Sector: The Load Shedding Politics

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Africa Centre for Energy Policy argues that Ghana's load shedding will not end in the short to medium term due to unreliable water and gas supplies, despite ongoing generation expansion projects.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Ghana has experienced five major power crises, occurring in 1982/83, 1997/98, 2002/3, 2006/7, and 2012, which have led the business community to procure electric generators due to a loss of confidence in the power generation system.
  • While a generation expansion programme started in 2007 aimed to add 1100MW of capacity through projects like the Bui hydro electricity project and Tema Thermal Plants, only 375MW has been added so far.
  • Current load shedding is attributed to a gas shortage from Nigeria, where Ghana's estimated demand of 200mmscfd far exceeds the daily supply of 105mmscfd, a situation compounded by Nigeria's own plans to increase its power generation from 6000MW to 13,000MW by the end of 2012.
  • Alternative gas solutions are insufficient for the medium term: an LNG vessel would take three years to build, and Jubilee gas cannot sustain demand as total supply (including WAGP) will fall short of the minimum demand beyond 2013 until Sankofa comes on stream in 2017.
  • The implementation of Power Sector Reforms has been hindered by a lack of political will, specifically through political interference in the PURC's pricing reforms and delays in establishing the transmission company until 2006.

Cite the original document

APA
Africa Centre for Energy Policy (2013). Press Statement By Africa Centre For Energy Policy( ACEP) On Challenges Facing Ghana’s Power Sector: The Load Shedding Politics. https://acep.africa/wp-content/uploads/2023/03/69764d19-5th-december-2013-challenges-facing-ghanas-power-sector-the-load-shedding-politics.pdf
Chicago
Africa Centre for Energy Policy. Press Statement By Africa Centre For Energy Policy( ACEP) On Challenges Facing Ghana’s Power Sector: The Load Shedding Politics. 2013. https://acep.africa/wp-content/uploads/2023/03/69764d19-5th-december-2013-challenges-facing-ghanas-power-sector-the-load-shedding-politics.pdf.
Wikipedia
{{cite press release |author=Africa Centre for Energy Policy |title=Press Statement By Africa Centre For Energy Policy( ACEP) On Challenges Facing Ghana’s Power Sector: The Load Shedding Politics |date=5 December 2013 |url=https://acep.africa/wp-content/uploads/2023/03/69764d19-5th-december-2013-challenges-facing-ghanas-power-sector-the-load-shedding-politics.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document acep-000043)}}
BibTeX
@misc{africacentreforenergypolicy2013press, author = {{Africa Centre for Energy Policy}}, title = {{Press Statement By Africa Centre For Energy Policy( ACEP) On Challenges Facing Ghana’s Power Sector: The Load Shedding Politics}}, publisher = {Africa Centre for Energy Policy}, year = {2013}, month = dec, url = {https://acep.africa/wp-content/uploads/2023/03/69764d19-5th-december-2013-challenges-facing-ghanas-power-sector-the-load-shedding-politics.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document acep-000043} }

Full text

Collected · Record updated