ACEP’s COMMENTS ON THE OCTP GAS UTILIZATION CHALLENGES
Summary
The Africa Centre for Energy Policy reports that Ghana is unable to consume the full 171mmscf of gas per day from the OCTP project, leading to a monthly take-or-pay liability of approximately $42.6 million.
Key insights
- Ghana is unable to consume the planned 171mmscf of gas per day due to defective commitment and inadequate planning, specifically the failure to align power generation investments with the gas location, as many plants were placed in the Eastern power enclave while gas is in the West.
- The government's take-or-pay liability for the OCTP project is approximately $42.6 million per month, based on a renegotiated gas price of $7.89/MMBtu. To reduce this burden, the government has deferred its 5% royalty and GNPC’s 20% share of production, lowering the monthly payment to $32.3 million.
- The $100 million Escrow Reserve Holding Account (ERHA) has already been encumbered by private parties because the Volta River Authority (VRA) has not paid for the gas it consumes and the government has defaulted on take-or-pay payments. Failure to replenish this account may lead partners to draw from a $500 million World Bank Guaranteed Letter of Credit, potentially damaging Ghana's international financial reputation.
- The state is experiencing revenue losses of approximately $28 million per month due to unutilized gas. While the Ministry of Energy claims this is not a loss because the gas can be supplied later, ACEP argues this ignores the time value of money and technical risks, citing the Jubilee fields where actual production (90,000bopd) fell short of projected capacity (120,000bopd).
Cite the original document
- APA
- Africa Centre for Energy Policy (2019). ACEP’s COMMENTS ON THE OCTP GAS UTILIZATION CHALLENGES. https://acep.africa/wp-content/uploads/2023/03/09645691-aceps_comments_on_the_octp_gas_utilization_challenges-2.pdf
- Chicago
- Africa Centre for Energy Policy. ACEP’s COMMENTS ON THE OCTP GAS UTILIZATION CHALLENGES. 2019. https://acep.africa/wp-content/uploads/2023/03/09645691-aceps_comments_on_the_octp_gas_utilization_challenges-2.pdf.
- Wikipedia
- {{cite press release |author=Africa Centre for Energy Policy |title=ACEP’s COMMENTS ON THE OCTP GAS UTILIZATION CHALLENGES |date=16 January 2019 |url=https://acep.africa/wp-content/uploads/2023/03/09645691-aceps_comments_on_the_octp_gas_utilization_challenges-2.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document acep-000031)}}
- BibTeX
- @misc{africacentreforenergypolicy2019aceps, author = {{Africa Centre for Energy Policy}}, title = {{ACEP’s COMMENTS ON THE OCTP GAS UTILIZATION CHALLENGES}}, publisher = {Africa Centre for Energy Policy}, year = {2019}, month = jan, url = {https://acep.africa/wp-content/uploads/2023/03/09645691-aceps_comments_on_the_octp_gas_utilization_challenges-2.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document acep-000031} }
Full text
Collected · Record updated