Uganda’s Oil Refinery: Gauging the Government’s Stake
Summary
This report finds that while Uganda's planned oil refinery could be reasonably profitable in a baseline scenario, the government's plan to take a 40 percent equity stake is risky and may require diverting approximately $330 million in present value terms from the national budget for loan repayments in the 2030s.
Key insights
- In a baseline scenario with an average oil price of USD 54 per barrel between 2025 and 2050, the refinery could be reasonably profitable with an internal rate of return (IRR) of 13 percent.
- A government equity stake of 40 percent would require an initial contribution of approximately $540 million, which is equivalent to $440 million in present value terms (assuming a real discount rate of 8 percent).
- Borrowing to fund the equity stake is not a complete solution, as the government would likely need to divert around $330 million in present value terms from the national budget to cover loan repayments in the 2030s when UNOC's annual returns are unlikely to cover its costs.
- The refinery faces significant downside risks from construction cost overruns; if costs overrun by the global average, the IRR drops to 9 percent and the government would need to find $920 million in present value terms to support UNOC.
- The global energy transition poses a risk to profitability; if the world achieves net zero CO2 emissions by 2050, an average oil price of $16 per barrel could reduce the refinery's IRR to 9 percent.
- The refinery's high construction costs, estimated at $4.5 billion (approximately $62,000 per barrel of capacity), are driven by its small size (60,000 bpd), which prevents economies of scale.
- The refinery's viability is supported by its access to cheap crude oil from the Lake Albert project and a deregulated domestic market where it can price products based on import parity.
- The refinery is expected to generate up to 1 million tonnes of carbon dioxide per year, which would double Uganda's current emissions, though the government plans to offset this by planting 40 million trees.
- To reduce public finance risks, the government could employ alternatives to paid equity, such as providing sovereign guarantees for debt, offering targeted tax incentives, or taking carried equity.
Cite the original document
- APA
- BAGABO, P., & SCURFIELD, T. (2024). Uganda’s Oil Refinery: Gauging the Government’s Stake. Natural Resource Governance Institute. https://resourcegovernance.org/sites/default/files/2024-01/Uganda%27s%20Oil%20Refinery%20Gauging%20the%20Government%27s%20Stake.pdf
- Chicago
- BAGABO, PAUL, and THOMAS SCURFIELD. Uganda’s Oil Refinery: Gauging the Government’s Stake. Natural Resource Governance Institute, 2024. https://resourcegovernance.org/sites/default/files/2024-01/Uganda%27s%20Oil%20Refinery%20Gauging%20the%20Government%27s%20Stake.pdf.
- Wikipedia
- {{cite report |last1=BAGABO |first1=PAUL |last2=SCURFIELD |first2=THOMAS |title=Uganda’s Oil Refinery: Gauging the Government’s Stake |publisher=Natural Resource Governance Institute |date=January 2024 |url=https://resourcegovernance.org/sites/default/files/2024-01/Uganda%27s%20Oil%20Refinery%20Gauging%20the%20Government%27s%20Stake.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document NRGI-000860)}}
- BibTeX
- @techreport{bagabo2024ugandas, author = {BAGABO, PAUL and SCURFIELD, THOMAS}, title = {{Uganda’s Oil Refinery: Gauging the Government’s Stake}}, institution = {Natural Resource Governance Institute}, year = {2024}, month = jan, url = {https://resourcegovernance.org/sites/default/files/2024-01/Uganda%27s%20Oil%20Refinery%20Gauging%20the%20Government%27s%20Stake.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document NRGI-000860} }
Full text
Collected · Record updated