{"query_echo":{"q":"","filters":{"geography":["Spanish Fork City"]},"warnings":[{"code":"facet_value_not_in_vocabulary","message":"Value 'Spanish Fork City' for facet 'geography' is not in the controlled vocabulary."}]},"total":{"value":1,"relation":"eq"},"page":1,"page_size":20,"self":"https://climateinsightsdirectory.org/api/v1/search?geography=Spanish+Fork+City","stability":"beta","ai_marking":{"digital_source_type":{"uri":"http://cv.iptc.org/newscodes/digitalsourcetype/trainedAlgorithmicMedia","name":"Created using Generative AI"},"notice":"Summary and key insights are generated using artificial intelligence."},"results":[{"id":"clibonds-000901","url":"https://climateinsightsdirectory.org/document/clibonds-000901","title":"Green Bond Fact Sheet","publisher":{"name":"Climate Bonds Initiative","organization":"climate-bonds-initiative"},"document_type":"fact sheet","language":"en","date_published":"2020-08-28","source_url":"https://www.climatebonds.net/files/drupal-files/files/2020-08_US_Spanish_Fork_City.pdf","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"Spanish Fork City issued a USD 73 million US Municipal green bond on August 5, 2020, with a maturity date of September 1, 2040. The proceeds are designated for the construction of additions and improvements to the city's sewer system, specifically including a new membrane bio–reactor treatment plant with solids holding tanks based on recommendations from a 2018 assessment. The bond carries an AA credit rating from S&P and a coupon of 4.000%.","ai_generated":true,"unit":"clibonds-000901#summary","date_modified":"2026-10-23"},"key_insights":[{"text":"Spanish Fork City issued a USD 73 million US Municipal green bond on August 5, 2020, with a maturity date of September 1, 2040, and a tenor of 20.1 years.","ai_generated":true,"unit":"clibonds-000901#insight-1","date_modified":"2026-10-23"},{"text":"The bond proceeds are allocated to water and wastewater projects, specifically for sewer system improvements and the construction of a new membrane bio–reactor treatment plant with solids holding tanks on property southeast of the existing plant, following a 2018 assessment.","ai_generated":true,"unit":"clibonds-000901#insight-2","date_modified":"2026-10-23"}],"climate_tags":["climate bond","wastewater treatment"],"geography_discussed":["Utah"],"frame_perspective":[],"analysis_type":["financial summary"]}]}