{"query_echo":{"q":"","filters":{"geography":["K'gari"]},"warnings":[{"code":"facet_value_not_in_vocabulary","message":"Value 'K'gari' for facet 'geography' is not in the controlled vocabulary."}]},"total":{"value":1,"relation":"eq"},"page":1,"page_size":20,"self":"https://climateinsightsdirectory.org/api/v1/search?geography=K%27gari","stability":"beta","ai_marking":{"digital_source_type":{"uri":"http://cv.iptc.org/newscodes/digitalsourcetype/trainedAlgorithmicMedia","name":"Created using Generative AI"},"notice":"Summary and key insights are generated using artificial intelligence."},"results":[{"id":"ruralele-000021","url":"https://climateinsightsdirectory.org/document/ruralele-000021","title":"Cegasa – PV System with Energy Storage for the Rangers HQ Fraser Island, Queensland (Australia)","publisher":{"name":"Alliance for Renewable Electrification","organization":"alliance-for-renewable-electrification"},"document_type":"case study","language":"en","date_published":"2021-09-07","source_url":"https://renewelec.org/case-study/cegasa-pv-system-energy-storage-rangers-hq-fraser-island-queensland-australia/","generator":"Climate Insights Directory","generated_fields":["summary","key_insights"],"summary":{"text":"A case study on an off-grid hybrid solar power plant at the Rangers Headquarters on Fraser Island, Australia, featuring 81.34 kWp PV and 464 kWh of Cegasa lithium LFP battery storage, aiming for an 80% reduction in diesel use.","ai_generated":true,"unit":"ruralele-000021#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"Solar Hybrids Pty Ltd constructed a hybrid photovoltaic solar power plant for the Queensland Parks and Wild Life service at the Rangers Headquarters on Fraser Island. The installation is an off-grid system designed to power offices, bedrooms, and auxiliary services.","ai_generated":true,"unit":"ruralele-000021#insight-1","date_modified":"2026-08-17"},{"text":"The technical specifications of the project include a ground-installed PV power of 81.34 kWp and a storage capacity of 464 kWh (144 Vdc) provided by containerised Cegasa lithium LFP batteries, which are integrated with three Selectronic 120V battery inverters.","ai_generated":true,"unit":"ruralele-000021#insight-2","date_modified":"2026-08-17"},{"text":"The project faced significant logistical challenges due to Fraser Island's geography, which lacks paved roads and urbanised areas, requiring access via barge and 4x4 vehicles on a beach exceeding 100km in length during low tide. The system is expected to initially reduce diesel use by 80%.","ai_generated":true,"unit":"ruralele-000021#insight-3","date_modified":"2026-08-17"}],"climate_tags":[],"geography_discussed":[],"frame_perspective":[],"analysis_type":[]}]}