{"query_echo":{"q":"","filters":{"geography":["Jomotsangkha Wildlife Sanctuary"]},"warnings":[{"code":"facet_value_not_in_vocabulary","message":"Value 'Jomotsangkha Wildlife Sanctuary' for facet 'geography' is not in the controlled vocabulary."}]},"total":{"value":5,"relation":"eq"},"page":1,"page_size":20,"self":"https://climateinsightsdirectory.org/api/v1/search?geography=Jomotsangkha+Wildlife+Sanctuary","stability":"beta","ai_marking":{"digital_source_type":{"uri":"http://cv.iptc.org/newscodes/digitalsourcetype/trainedAlgorithmicMedia","name":"Created using Generative AI"},"notice":"Summary and key insights are generated using artificial intelligence."},"results":[{"id":"wwf-000560","url":"https://climateinsightsdirectory.org/document/wwf-000560","title":"Environmental and Social Management Plan for Jomotsangkha Wildlife Sanctuary","publisher":{"name":"WWF International","organization":"wwf-international"},"document_type":"report","language":"en","date_published":"2024","source_url":"https://files.worldwildlife.org/wwfcmsprod/files/Publication/file/58ymc6xk85_JWS_ESMP_2024.pdf","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"The Environmental and Social Management Plan (ESMP) for the Jomotsangkha Wildlife Sanctuary (JWS) outlines the safeguards and mitigation strategies for three 2024 activities: constructing waste disposal infrastructure, restoring lowland grasslands, and developing an ecotourism site. The plan ensures compliance with both Royal Government of Bhutan (RGoB) laws and WWF's Social Safeguards Integrated Policies and Procedures (SIPP), with the latter prevailing in cases of discrepancy. Key environmental risks identified include vegetation loss, dust pollution, and disturbance to wildlife, particularly elephants. The document also details comprehensive occupational health and safety (OHS) standards for workers and establishes grievance redressal mechanisms through BFL, WWF, and the Green Climate Fund (GCF).","ai_generated":true,"unit":"wwf-000560#summary","date_modified":"2026-10-23"},"key_insights":[{"text":"The Jomotsangkha Wildlife Sanctuary (JWS), established in 1974 and gazetted in 1993, covers 362.49 sq.km and is the second smallest naturally protected area in Bhutan, hosting over 572 plant species and 35 mammal species, including critically endangered species like the Chinese Pangolin and Lady Slipper.","ai_generated":true,"unit":"wwf-000560#insight-1","date_modified":"2026-10-23"},{"text":"Three primary activities are planned for 2024: the construction of waste disposal infrastructure in Aumshing (budgeted at Nu. 5,000,000), the restoration of 12.5 hectares of lowland grasslands in Kherkheri (budgeted at Nu. 400,000), and ecotourism site development in Rongchuthang (budgeted at Nu. 500,000).","ai_generated":true,"unit":"wwf-000560#insight-2","date_modified":"2026-10-23"},{"text":"The project identifies several recurring environmental and social risks across the activities, including vegetation change from clearing, dust pollution, and the risk of disturbing natural habitats, specifically elephants, through the use of machinery like tractors.","ai_generated":true,"unit":"wwf-000560#insight-3","date_modified":"2026-10-23"},{"text":"The ESMP mandates that WWF’s Social Safeguards Integrated Policies and Procedures (SIPP) prevail over Royal Government of Bhutan (RGoB) legislation in cases of discrepancy, particularly regarding the eligibility of non-title holders for compensation and the requirement for extensive community consultations.","ai_generated":true,"unit":"wwf-000560#insight-4","date_modified":"2026-10-23"},{"text":"A comprehensive set of Occupational Health and Safety (OHS) standards is required for all workers, including the provision of safety gear (helmets, gloves, boots, and reflective vests), mandatory information sessions on hazards, and specific guidelines for working at heights and managing electrical risks.","ai_generated":true,"unit":"wwf-000560#insight-5","date_modified":"2026-10-23"},{"text":"The document establishes a multi-tiered Grievance Redressal Mechanism (GRM) allowing stakeholders to report issues via the BFL-specific mechanism, the WWF Grievance Mechanism (via a Project Complaints Officer), or the Green Climate Fund (GCF) Independent Review Mechanism.","ai_generated":true,"unit":"wwf-000560#insight-6","date_modified":"2026-10-23"}],"climate_tags":["biodiversity conservation","climate resilience","waste management","ecotourism","Environmental and Social Safeguards"],"geography_discussed":["Samdrup Jongkhar District","India","Assam","Arunachal Pradesh"],"frame_perspective":[],"analysis_type":["environmental and social impact assessment","mitigation planning"]},{"id":"wwf-000229","url":"https://climateinsightsdirectory.org/document/wwf-000229","title":"Bhutan For Life Environmental and Social Management Plan","publisher":{"name":"WWF International","organization":"wwf-international"},"document_type":"report","language":"en","date_published":"2023-01","source_url":"https://files.worldwildlife.org/wwfcmsprod/files/Publication/file/1joizvf2su_FRPMD_ESMP_2023.pdf","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"The ESMP outlines the environmental and social safeguards for the Bhutan for Life (BFL) project's activities from January 2023 to June 2024. Key planned activities include the establishment of a cane and bamboo enterprise in Mongar, the creation of 51.97 hectares of new plantations, the maintenance of 39.47 hectares of existing plantations, and the creation of 36.23 hectares of habitat enrichment plantations. The plan identifies potential risks such as construction waste, noise pollution, and the introduction of invasive species, providing specific mitigation measures and monitoring arrangements. Implementation is led by Green Bhutan Corporation Limited (GBCL) under the supervision of the Department of Forest and Park Services (DoFPS).","ai_generated":true,"unit":"wwf-000229#summary","date_modified":"2026-10-23"},"key_insights":[{"text":"The Bhutan for Life (BFL) project is a 14-year initiative designed to secure biodiversity conservation, human well-being, and climate resilience by improving the management of Bhutan's Protected Area System (PAS) and Biological Corridors (BCs).","ai_generated":true,"unit":"wwf-000229#insight-1","date_modified":"2026-10-23"},{"text":"Between January 2023 and June 2024, the project will establish a cane and bamboo enterprise in Banjar village, Tsamang gewog, Mongar Dzongkhag, with a budget of Nu. 3,500,000. Activities include community consultation, resource assessment, construction of a weaving center, and skill development training.","ai_generated":true,"unit":"wwf-000229#insight-2","date_modified":"2026-10-23"},{"text":"The project plans to create 51.97 hectares of new plantations across seven sites in JWS, S/Jongkhar, Tashigang, Tsirang, and Sarpang with a budget of Nu. 9,673,000. These plantations will be maintained annually until 2028.","ai_generated":true,"unit":"wwf-000229#insight-3","date_modified":"2026-10-23"},{"text":"The plan includes the maintenance of 39.47 hectares of existing plantations across various locations, including Dagana, JWS, Tsirang, Sarpang, Samtse, Wangdue, and Punakha, with a budget of Nu. 785,000.","ai_generated":true,"unit":"wwf-000229#insight-4","date_modified":"2026-10-23"},{"text":"A budget of Nu. 4,320,000 is allocated for the creation of 36.23 hectares of habitat enrichment plantations in PWS, RMNP, Pemagatsel, and Thimphu, with maintenance continuing until 2028.","ai_generated":true,"unit":"wwf-000229#insight-5","date_modified":"2026-10-23"},{"text":"Potential environmental impacts identified for the planned activities include the generation of construction and plastic waste, noise pollution, dust generation, and the risk of introducing invasive species.","ai_generated":true,"unit":"wwf-000229#insight-6","date_modified":"2026-10-23"},{"text":"To mitigate the risk of invasive species, the project requires that only native species be planted and that biological control measures be emphasized.","ai_generated":true,"unit":"wwf-000229#insight-7","date_modified":"2026-10-23"},{"text":"Social impacts are primarily focused on occupational health and safety; mitigation includes prohibiting underage workers, ensuring decent work conditions, and implementing grievance mechanisms.","ai_generated":true,"unit":"wwf-000229#insight-8","date_modified":"2026-10-23"},{"text":"Implementation of plantation activities is carried out by the state-owned enterprise Green Bhutan Corporation Limited (GBCL) under the supervision of the Department of Forest and Park Services (DoFPS).","ai_generated":true,"unit":"wwf-000229#insight-9","date_modified":"2026-10-23"},{"text":"The total budget for the activities covered by the ESMP is Nu. 18,278,000, with the document stating that no separate fund for mitigation is required as the activities are small-scale.","ai_generated":true,"unit":"wwf-000229#insight-10","date_modified":"2026-10-23"}],"climate_tags":["biodiversity conservation","climate resilience","carbon neutrality","afforestation","reforestation","natural resource management"],"geography_discussed":["Mongar District","Sarpang District","Tsirang District","Trashigang District","Pema Gatshel","Thimphu District","Royal Manas National Park","Phibsoo Wildlife Sanctuary","Dagana District","Samtse District","Phrumsengla National Park","Punakha District","Jomotsangkha Wildlife Sanctuary"],"frame_perspective":[],"analysis_type":["environmental and social impact assessment","management plan"]},{"id":"wwf-000385","url":"https://climateinsightsdirectory.org/document/wwf-000385","title":"Bhutan for Life Environmental and Social Management Plan for Jomotsangkha Wildlife Sanctuary","publisher":{"name":"WWF International","organization":"wwf-international"},"document_type":"report","language":"en","date_published":"2022","source_url":"https://files.worldwildlife.org/wwfcmsprod/files/Publication/file/37e79azf97_JWS_ESMP.pdf","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"The Environmental and Social Management Plan (ESMP) for the Jomotsangkha Wildlife Sanctuary (JWS) outlines the safeguards and mitigation strategies for the 2022 implementation of the Bhutan for Life (BFL) project. The primary activity for 2022 is the establishment of a community nursery for the medicinal plant Paris polyphylla in Deptsang, budgeted at Nu. 700,000. The plan identifies potential minor impacts, such as waste generation and site digging, and mandates mitigation measures including proper waste disposal and landscaping. The ESMP integrates both Royal Government of Bhutan (RGoB) laws and WWF's Social Safeguards Integrated Policies and Procedures (SIPP), with the latter prevailing in cases of discrepancy, particularly regarding non-title land users and community consultation. Implementation is managed by the BFL focal person in JWS, with monitoring conducted through weekly field visits and semi-annual reports. The document also includes comprehensive occupational health and safety (OHS) standards and worker accommodation guidelines.","ai_generated":true,"unit":"wwf-000385#summary","date_modified":"2026-10-23"},"key_insights":[{"text":"The Bhutan for Life (BFL) project is a 14-year initiative designed to secure biodiversity conservation, human well-being, and climate resilience in Bhutan by maintaining a network of protected areas and biological corridors.","ai_generated":true,"unit":"wwf-000385#insight-1","date_modified":"2026-10-23"},{"text":"The Jomotsangkha Wildlife Sanctuary (JWS), formerly known as Khaling Wildlife Sanctuary, covers 362.49 sq.km in the Samdrup Jongkhar district and serves as a habitat for keystone species including tigers, elephants, and the critically endangered Chinese Pangolin and Lady Slipper.","ai_generated":true,"unit":"wwf-000385#insight-2","date_modified":"2026-10-23"},{"text":"The planned activity for 2022 is the establishment of a community nursery for Paris polyphylla (locally known as Thogsampa) in Deptsang, with a total budget of Nu. 700,000 and a specific ESS mitigation budget of Nu. 10,000.","ai_generated":true,"unit":"wwf-000385#insight-3","date_modified":"2026-10-23"},{"text":"The nursery project aims to reduce illegal harvesting and pressure on wild non-wood forest products (NWFP) by motivating the Deptsang NWFP group to domesticate high-value medicinal plants.","ai_generated":true,"unit":"wwf-000385#insight-4","date_modified":"2026-10-23"},{"text":"The ESMP identifies minor short-term and long-term risks for the nursery establishment, specifically waste generation from construction materials and the need for landscaping on slopes to prevent vegetation damage.","ai_generated":true,"unit":"wwf-000385#insight-5","date_modified":"2026-10-23"},{"text":"In cases of discrepancy between Royal Government of Bhutan (RGoB) laws and WWF's Social Safeguards Integrated Policies and Procedures (SIPP), the WWF SIPP prevails, particularly regarding the eligibility of non-title land users for compensation and the requirement for extensive community consultations.","ai_generated":true,"unit":"wwf-000385#insight-6","date_modified":"2026-10-23"}],"climate_tags":["biodiversity conservation","climate resilience","Environmental and Social Safeguards"],"geography_discussed":["Samdrup Jongkhar District","Deptsang"],"frame_perspective":[],"analysis_type":["management plan","impact assessment"]},{"id":"wwf-000534","url":"https://climateinsightsdirectory.org/document/wwf-000534","title":"Environmental and Social Management Plan for Jomotsangkha Wildlife Sanctuary, 2021","publisher":{"name":"WWF International","organization":"wwf-international"},"document_type":"report","language":"en","date_published":"2021","source_url":"https://files.worldwildlife.org/wwfcmsprod/files/Publication/file/4vwqidibdi_JWS_ESMP_2021.pdf","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"The 2021 ESMP for Jomotsangkha Wildlife Sanctuary (JWS) outlines mitigation strategies for five key activities: staff quarter construction, waterhole and salt lick improvement, lowland grassland restoration, river embankment construction, and outpost maintenance. It integrates Bhutanese national law with WWF's Social Safeguards Integrated Policies and Procedures (SIPP), prioritizing the more stringent WWF standards in cases of discrepancy, particularly regarding compensation for non-title land users and community consultation. The plan details specific risks such as increased poaching at improved waterholes, human-wildlife conflict in elephant habitats, and occupational health and safety for workers, providing a structured monitoring framework and a dedicated budget of USD 3,330 for mitigation measures.","ai_generated":true,"unit":"wwf-000534#summary","date_modified":"2026-10-23"},"key_insights":[{"text":"The Jomotsangkha Wildlife Sanctuary (JWS), formerly known as Khaling Wildlife Sanctuary, covers 362.49 sq.km in the Samdrup Jongkhar district of south-eastern Bhutan and is the country's second smallest naturally protected area.","ai_generated":true,"unit":"wwf-000534#insight-1","date_modified":"2026-10-23"},{"text":"JWS serves as a habitat for several keystone and flagship species, including tigers, common leopards, elephants, and gaur, as well as critically endangered species such as the Lady Slipper and Chinese Pangolin.","ai_generated":true,"unit":"wwf-000534#insight-2","date_modified":"2026-10-23"},{"text":"The project implements a hierarchy of regulations where WWF’s Social Safeguards Integrated Policies and Procedures (SIPP) prevail over Royal Government of Bhutan (RGoB) laws if the WWF requirements are more extensive, specifically regarding the eligibility of non-title land users for compensation and the necessity of community consultations.","ai_generated":true,"unit":"wwf-000534#insight-3","date_modified":"2026-10-23"},{"text":"Planned improvements to waterholes and salt licks are identified as a major long-term risk for increasing poaching, as these sites become hotspots for gathering animals.","ai_generated":true,"unit":"wwf-000534#insight-4","date_modified":"2026-10-23"},{"text":"Lowland grassland restoration involves the removal of invasive, non-palatable plant species—including Lantana camara, Chromolaena odorata, Pogostemon benghalensis, Ageratina adenophora, and Mekania micrantha—using mechanical removal and controlled burning.","ai_generated":true,"unit":"wwf-000534#insight-5","date_modified":"2026-10-23"},{"text":"The construction of a river protection wall along the Jomo River is intended to prevent flooding risks to the Park Range Office and Shiv Mandir, though it is noted as a major long-term risk for the disturbance of natural aquatic habitats.","ai_generated":true,"unit":"wwf-000534#insight-6","date_modified":"2026-10-23"},{"text":"The ESMP allocates a specific budget for mitigation measures from the ESS Fund totaling USD 3,330, in addition to the individual activity budgets.","ai_generated":true,"unit":"wwf-000534#insight-7","date_modified":"2026-10-23"},{"text":"To prevent poaching, the project explicitly avoids public consultation and disclosure of locations for habitat management works such as salt licks, waterholes, and grasslands, as these sites are deep within the forest.","ai_generated":true,"unit":"wwf-000534#insight-8","date_modified":"2026-10-23"},{"text":"Occupational health and safety (OHS) standards for workers include the provision of mandatory safety gear (helmets, gloves, boots, and reflective vests) and strict adherence to COVID-19 prevention protocols.","ai_generated":true,"unit":"wwf-000534#insight-9","date_modified":"2026-10-23"}],"climate_tags":["biodiversity conservation","climate resilience","environmental impact assessment","Environmental and Social Safeguards","carbon neutrality","natural resource management"],"geography_discussed":["Samdrup Jongkhar District","Assam","Arunachal Pradesh"],"frame_perspective":[],"analysis_type":["environmental and social impact assessment","mitigation planning"]},{"id":"wwf-000485","url":"https://climateinsightsdirectory.org/document/wwf-000485","title":"Bhutan for Life Environmental and Social Management Plan for Jomotsangkha Wildlife Sanctuary","publisher":{"name":"WWF International","organization":"wwf-international"},"document_type":"report","language":"en","date_published":"2020","source_url":"https://files.worldwildlife.org/wwfcmsprod/files/Publication/file/4ci72cuwiz_JWS_ESMP.pdf","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"The 2020 ESMP for Jomotsangkha Wildlife Sanctuary (JWS) outlines mitigation strategies for five key activities: the construction of a head office, improvement of waterholes and salt licks, restoration of lowland grasslands, river protection work, and maintenance of staff quarters. It integrates Bhutanese national law with WWF's Social Safeguards Integrated Policies and Procedures (SIPP), prioritizing the more stringent WWF standards where discrepancies exist, particularly regarding compensation for non-title land users and community consultation. The plan details specific environmental risks, such as vegetation clearing and aquatic habitat disturbance, and social risks, including water-source conflicts between construction workers and local communities. Implementation is managed by BFL focal persons and contractors, with a monitoring framework involving weekly field visits and quarterly reports to ensure compliance.","ai_generated":true,"unit":"wwf-000485#summary","date_modified":"2026-10-23"},"key_insights":[{"text":"The Jomotsangkha Wildlife Sanctuary (JWS), formerly known as Khaling Wildlife Sanctuary, covers 362.49 sq.km in south-eastern Bhutan and serves as a habitat for flagship species including tigers, elephants, and the critically endangered Chinese Pangolin and Lady Slipper.","ai_generated":true,"unit":"wwf-000485#insight-1","date_modified":"2026-10-23"},{"text":"The project identifies a discrepancy between Royal Government of Bhutan (RGoB) laws and WWF’s SIPP regarding land rights; while RGoB laws only recognize formal land owners for compensation, WWF’s SIPP extends eligibility to all users, including those lacking formal legal titles.","ai_generated":true,"unit":"wwf-000485#insight-2","date_modified":"2026-10-23"},{"text":"Planned construction of the JWS head office at Langchenphu (estimated cost US $224,113) presents social risks regarding water access, as the site shares a water source with a community of 30 households located approximately 2km away.","ai_generated":true,"unit":"wwf-000485#insight-3","date_modified":"2026-10-23"},{"text":"Habitat management activities in 2020 include the restoration of 56.68 acres of lowland grasslands in Tshoduen (Satpokheri) to remove invasive species like Lantana camara and Chromolaena odorata using controlled burning and machinery.","ai_generated":true,"unit":"wwf-000485#insight-4","date_modified":"2026-10-23"},{"text":"River protection work at Jomochu involves constructing a 1415m long and 30m wide embankment to prevent annual flash floods that destroy wildlife habitats and threaten a temple and the Park Range Office.","ai_generated":true,"unit":"wwf-000485#insight-5","date_modified":"2026-10-23"},{"text":"The improvement of waterholes and salt licks is flagged as a major long-term risk for increased poaching, as these sites become hotspots for gathering animals.","ai_generated":true,"unit":"wwf-000485#insight-6","date_modified":"2026-10-23"},{"text":"The total budget for the five primary activities is approximately USD 213,248, with an additional USD 408 specifically allocated for the implementation of ESMP mitigation measures.","ai_generated":true,"unit":"wwf-000485#insight-7","date_modified":"2026-10-23"}],"climate_tags":["biodiversity conservation","climate resilience","Flood mitigation","Environmental and Social Safeguards","natural resource management"],"geography_discussed":["Samdrup Jongkhar District","Langchenphu Gewog","Assam","Sakteng Wildlife Sanctuary","Arunachal Pradesh"],"frame_perspective":[],"analysis_type":["environmental impact assessment","social risk assessment","mitigation planning"]}]}