{"query_echo":{"q":"","filters":{"geography":["Jamshoro"]},"warnings":[]},"total":{"value":1,"relation":"eq"},"page":1,"page_size":20,"self":"https://climateinsightsdirectory.org/api/v1/search?geography=Jamshoro","stability":"beta","ai_marking":{"digital_source_type":{"uri":"http://cv.iptc.org/newscodes/digitalsourcetype/trainedAlgorithmicMedia","name":"Created using Generative AI"},"notice":"Summary and key insights are generated using artificial intelligence."},"results":[{"id":"ieefa-000306","url":"https://climateinsightsdirectory.org/document/ieefa-000306","title":"Expensive Underutilized Jamshoro Coal Plant Exposes Pakistan’s Power Sector Overcapacity","publisher":{"name":"Institute for Energy Economics and Financial Analysis","organization":"institute-for-energy-economics-and-financial-analysis"},"document_type":"research paper","language":"en","date_published":"2025-12-17","source_url":"https://ieefa.org/resources/expensive-underutilized-jamshoro-coal-plant-exposes-pakistans-power-sector-overcapacity","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"The Jamshoro coal-fired power plant, commissioned in May 2025, has an average dispatch rate of only 6% due to a national grid surplus of 10–12 GW. Despite this underutilization, capacity payments in Pakistan rose 96% between FY2022 and FY2024. The plant was financed by the ADB through a loan structure that increased costs for consumers via distribution companies, contributing to circular debt. The author suggests the ADB use the Jamshoro plant as a pilot for its Energy Transition Mechanism to achieve early retirement, noting that the plant's utilization is projected to remain below technical minimums even in high-demand scenarios.","ai_generated":true,"unit":"ieefa-000306#summary","date_modified":"2026-11-05"},"key_insights":[{"text":"The Jamshoro coal-fired power plant (CFPP) is severely underutilized, averaging a 6% dispatch rate in the six months following its May 2025 commissioning. Projections from the Indicative Generation Capacity Expansion Plan (2025-2035) suggest a maximum utilization of only 26% by 2027 under high-demand scenarios, while other scenarios predict output near zero for most of the next decade.","ai_generated":true,"unit":"ieefa-000306#insight-1","date_modified":"2026-11-05"},{"text":"Pakistan's power sector suffers from significant overcapacity, with a national grid surplus of 10–12 GW. This has led to a sharp increase in capacity payments, which rose from PKR0.97 trillion in FY2022 to PKR1.90 trillion in FY2024, representing a 96% increase over two years, while energy sales declined by 9.4% in FY2023 and 2.83% in FY2024.","ai_generated":true,"unit":"ieefa-000306#insight-2","date_modified":"2026-11-05"},{"text":"The financing of the Jamshoro CFPP involved a markup structure where the Asian Development Bank (ADB) lent to the Government of Pakistan (GoP) at low rates (e.g., LIBOR +0.5%), which the government then re-lent to the project at significantly higher rates (e.g., LIBOR +4.5% or a flat 15%). These inflated costs are passed to consumers through distribution companies (DISCOS), worsening the country's chronic circular debt.","ai_generated":true,"unit":"ieefa-000306#insight-3","date_modified":"2026-11-05"},{"text":"The Jamshoro CFPP was allowed to proceed despite emerging evidence of grid overcapacity and warnings from NEPRA members that the plant would exacerbate the issue. The project's design relies on an 80:20 blend of imported and local coal, meaning 80% of its fuel must be imported, putting further pressure on Pakistan's foreign exchange resources.","ai_generated":true,"unit":"ieefa-000306#insight-4","date_modified":"2026-11-05"},{"text":"The author proposes that the ADB consider the Jamshoro CFPP for early retirement or debt restructuring, aligning with the bank's 2021 energy policy framework and its Energy Transition Mechanism (ETM). A separate study suggests that accelerated closure of coal plants like Sahiwal could save Pakistan nearly USD5 billion in capacity payments and reduce CO2 emissions by up to 38 million tonnes.","ai_generated":true,"unit":"ieefa-000306#insight-5","date_modified":"2026-11-05"},{"text":"Widespread underutilization affects the broader Pakistani power fleet, with an average utilization rate of 34% in 2024. Other plants, such as the LNG plant in Trimmu, have seen dispatch rates as low as 3% between August 2024 and October 2025. Future additions of 10GW of hydroelectric capacity are expected to further reduce the need for fossil fuel-based plants.","ai_generated":true,"unit":"ieefa-000306#insight-6","date_modified":"2026-11-05"}],"climate_tags":["coal-fired power station","energy transition","decarbonization","distributed solar photovoltaics","climate finance","hydropower"],"geography_discussed":["Philippines","Indonesia","Kazakhstan","Bangladesh"],"frame_perspective":[],"analysis_type":["economic assessment","policy analysis"]}]}