{"query_echo":{"q":"","filters":{"geography":["Galion"]},"warnings":[]},"total":{"value":3,"relation":"eq"},"page":1,"page_size":20,"self":"https://climateinsightsdirectory.org/api/v1/search?geography=Galion","stability":"beta","ai_marking":{"digital_source_type":{"uri":"http://cv.iptc.org/newscodes/digitalsourcetype/trainedAlgorithmicMedia","name":"Created using Generative AI"},"notice":"Summary and key insights are generated using artificial intelligence."},"results":[{"id":"ieefa-000660","url":"https://climateinsightsdirectory.org/document/ieefa-000660","title":"Ohio wind farm proves case for wise renewable energy policy","publisher":{"name":"Institute for Energy Economics and Financial Analysis","organization":"institute-for-energy-economics-and-financial-analysis"},"document_type":"case study","language":"en","date_published":"2015-04-30","source_url":"https://ieefa.org/resources/ohio-wind-farm-proves-case-wise-renewable-energy-policy","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"This case study of the Blue Creek Wind Farm in Ohio finds that wind power is price-competitive with or cheaper than natural gas and coal, providing significant cost savings for public entities.","ai_generated":true,"unit":"ieefa-000660#summary","date_modified":"2026-11-05"},"key_insights":[{"text":"The Blue Creek Wind Farm, a 300-megawatt facility in Van Wert County, Ohio, provides electricity at prices that are competitive with or lower than other power sources, including natural gas and coal.","ai_generated":true,"unit":"ieefa-000660#insight-1","date_modified":"2026-11-05"},{"text":"The Ohio State University has saved $4 million on its electric bills through its 20-year agreement with Blue Creek, which has a levelized price of $54 per megawatt hour.","ai_generated":true,"unit":"ieefa-000660#insight-2","date_modified":"2026-11-05"},{"text":"American Municipal Power (AMP) secured a 10-year deal with Blue Creek with a levelized cost of electricity of $45 per megawatt hour, starting at $35 per megawatt hour and increasing by $2 per megawatt hour annually.","ai_generated":true,"unit":"ieefa-000660#insight-3","date_modified":"2026-11-05"},{"text":"In 2014, electricity from Blue Creek was the least expensive source for Galion, Ohio, except for hydropower from Niagara Falls, costing less than the average market price, the Fremont natural gas plant, and the Prairie State coal plant.","ai_generated":true,"unit":"ieefa-000660#insight-4","date_modified":"2026-11-05"},{"text":"Blue Creek Wind Farm has met its average capacity factor target of 35 percent, ensuring it can dispatch the amount of electricity customers expect.","ai_generated":true,"unit":"ieefa-000660#insight-5","date_modified":"2026-11-05"}],"climate_tags":["wind power","renewable energy","electricity price","power purchase agreement","fossil fuel","natural gas","coal","hydropower"],"geography_discussed":["Texas","Galion","Niagara Falls"],"frame_perspective":[],"analysis_type":["case study"]},{"id":"ieefa-001261","url":"https://climateinsightsdirectory.org/document/ieefa-001261","title":"COMPARISON OF PRICES GALION HAS PAID FOR PRAIRIE STATE POWER WITH AVERAGE MARKET PRICES","publisher":{"name":"Institute for Energy Economics and Financial Analysis","organization":"institute-for-energy-economics-and-financial-analysis"},"document_type":"fact sheet","language":"en","date_published":"2013-09-13","source_url":"https://ieefa.org/wp-content/uploads/2013/09/Galion-Basic-PSEC-Power-Prices-January-thru-July-2013-.pdf","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","analysis_type"],"summary":{"text":"This fact sheet demonstrates that Galion paid significantly higher prices for Prairie State power than both the promised rate of $48.00 per MWH and the average market prices during the period from March 2012 to July 2013.","ai_generated":true,"unit":"ieefa-001261#summary","date_modified":"2026-11-05"},"key_insights":[{"text":"From June 2012 to July 2013, the gross cost of Prairie State power per MWH consistently exceeded the promised cost of $48.00, reaching as high as $116.50 in May 2013.","ai_generated":true,"unit":"ieefa-001261#insight-1","date_modified":"2026-11-05"},{"text":"The actual costs paid for Prairie State power were consistently higher than the average market price of power per MWH, which ranged from $27.68 in June 2012 to $44.41 in July 2013.","ai_generated":true,"unit":"ieefa-001261#insight-2","date_modified":"2026-11-05"},{"text":"Between January and May 2013, and again in July 2013, AMP applied a 'rate levelization' credit to Galion's bills using funds from other sources, including bond proceeds, which must be repaid eventually.","ai_generated":true,"unit":"ieefa-001261#insight-3","date_modified":"2026-11-05"}],"climate_tags":["electricity price","power purchase agreement","energy costs"],"geography_discussed":[],"frame_perspective":[],"analysis_type":["policy analysis","comparative analysis"]},{"id":"ieefa-001519","url":"https://climateinsightsdirectory.org/document/ieefa-001519","title":"WHY SHOULD THE OHIO ATTORNEY GENERAL BE ASKED TO INVESTIGATE THE PRAIRIE STATE DEAL?","publisher":{"name":"Institute for Energy Economics and Financial Analysis","organization":"institute-for-energy-economics-and-financial-analysis"},"document_type":"briefing","language":"en","date_published":"2013-08-21","source_url":"https://ieefa.org/sites/default/files/resources/IEEFA-memo-to-Galion-August-2013.pdf","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"This briefing argues for a state investigation into the Prairie State coal plant deal, finding that electricity rates for participating cities like Galion have reached $85/MWH, far exceeding the projections provided to them in 2007.","ai_generated":true,"unit":"ieefa-001519#summary","date_modified":"2026-11-05"},"key_insights":[{"text":"The electricity rates charged to Galion in May and June 2013 were $85/MWH, which exceeds the highest possible price scenario of $85/MWH projected for 2025 in the 2007 RW Beck report, even though the 2025 projection included costs for CO2 regulation which have not yet been enacted.","ai_generated":true,"unit":"ieefa-001519#insight-1","date_modified":"2026-11-05"},{"text":"AMP and the RW Beck study underestimated construction cost risks in 2007 by projecting a maximum increase of 6%, while the actual cost increase from the $4.1 billion base level to the estimated $4.9 billion price tag is at least 20%.","ai_generated":true,"unit":"ieefa-001519#insight-2","date_modified":"2026-11-05"},{"text":"AMP failed to inform participating cities of 2007 industry reports from Standard and Poor's and the Brattle Group that warned of skyrocketing construction costs for coal plants, despite AMP acknowledging in a separate filing for the Meigs County plant that such price increases were \"staggering\".","ai_generated":true,"unit":"ieefa-001519#insight-3","date_modified":"2026-11-05"},{"text":"The Prairie State plant's actual average capacity factor is 62%, significantly lower than the 82% budgeted by AMP, and both units require extended outages in late 2013 and spring 2014 to correct design and construction deficiencies.","ai_generated":true,"unit":"ieefa-001519#insight-4","date_modified":"2026-11-05"},{"text":"AMP has used unused bond proceeds and reserve funds to lower rates, spending at least $20 million, but without this levelization, Galion's May bill would have been $121/MWH.","ai_generated":true,"unit":"ieefa-001519#insight-5","date_modified":"2026-11-05"},{"text":"Municipalities in the Midwest are facing financial distress; Marceline, Missouri divested its holdings in the plant, and the Northern Illinois Municipal Power Agency (comprising Batavia, Geneva, and Rochelle) underbudgeted electric expenses by $4.5 million for the first half of 2013.","ai_generated":true,"unit":"ieefa-001519#insight-6","date_modified":"2026-11-05"}],"climate_tags":["coal-fired power station","electricity price"],"geography_discussed":["Galion","Marceline","Missouri","Illinois","Batavia","Geneva","Rochelle"],"frame_perspective":[],"analysis_type":["policy analysis","financial analysis"]}]}