{"query_echo":{"q":"","filters":{"geography":["Edwardsport"]},"warnings":[]},"total":{"value":1,"relation":"eq"},"page":1,"page_size":20,"self":"https://climateinsightsdirectory.org/api/v1/search?geography=Edwardsport","stability":"beta","ai_marking":{"digital_source_type":{"uri":"http://cv.iptc.org/newscodes/digitalsourcetype/trainedAlgorithmicMedia","name":"Created using Generative AI"},"notice":"Summary and key insights are generated using artificial intelligence."},"results":[{"id":"ieefa-000627","url":"https://climateinsightsdirectory.org/document/ieefa-000627","title":"Duke Energy’s costly Edwardsport coal gasification project continues","publisher":{"name":"Institute for Energy Economics and Financial Analysis","organization":"institute-for-energy-economics-and-financial-analysis"},"document_type":"statement","language":"en","date_published":"2018-08-01","source_url":"https://ieefa.org/resources/ieefa-update-duke-energys-costly-edwardsport-coal-gasification-project-continues","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","analysis_type"],"summary":{"text":"Duke Energy's Edwardsport coal gasification plant has cost ratepayers over $1.4 billion more than market prices for power, with operating costs averaging $60 per MWh.","ai_generated":true,"unit":"ieefa-000627#summary","date_modified":"2026-11-05"},"key_insights":[{"text":"Between June 2013 and December 2017, the all-in cost of power from the Edwardsport plant averaged $145 per MWh, significantly exceeding the market average of $32 per MWh.","ai_generated":true,"unit":"ieefa-000627#insight-1","date_modified":"2026-11-05"},{"text":"Indiana ratepayers paid more than $1.4 billion extra for power from the Edwardsport plant compared to purchasing the same energy and capacity from competitive wholesale markets in the MISO region.","ai_generated":true,"unit":"ieefa-000627#insight-2","date_modified":"2026-11-05"},{"text":"The plant's operating and maintenance costs alone have averaged $60 per MWh since opening, and it has failed to meet performance metrics regarding heat rate, capacity factor, equivalent forced outage rate, and syngas availability.","ai_generated":true,"unit":"ieefa-000627#insight-3","date_modified":"2026-11-05"},{"text":"The plant is technically uneconomical unless it operates at a net capacity factor of 82% or more when using syngas, but it is currently operating at barely half that factor.","ai_generated":true,"unit":"ieefa-000627#insight-4","date_modified":"2026-11-05"},{"text":"The economic viability of Edwardsport is expected to decline further due to low natural gas prices and the decreasing costs of wind and solar energy on the MISO grid.","ai_generated":true,"unit":"ieefa-000627#insight-5","date_modified":"2026-11-05"}],"climate_tags":["wind energy","solar energy","natural gas","electricity price","renewable energy"],"geography_discussed":[],"frame_perspective":[],"analysis_type":["policy analysis","economic analysis"]}]}