{"query_echo":{"q":"","filters":{"geography":["Copal Urco"]},"warnings":[{"code":"facet_value_not_in_vocabulary","message":"Value 'Copal Urco' for facet 'geography' is not in the controlled vocabulary."}]},"total":{"value":1,"relation":"eq"},"page":1,"page_size":20,"self":"https://climateinsightsdirectory.org/api/v1/search?geography=Copal+Urco","stability":"beta","ai_marking":{"digital_source_type":{"uri":"http://cv.iptc.org/newscodes/digitalsourcetype/trainedAlgorithmicMedia","name":"Created using Generative AI"},"notice":"Summary and key insights are generated using artificial intelligence."},"results":[{"id":"ruralele-000055","url":"https://climateinsightsdirectory.org/document/ruralele-000055","title":"acciona.org Foundation – Luz en Casa Amazonia Microgrid Pilot Project in Copal Urco (Peru)","publisher":{"name":"Alliance for Renewable Electrification","organization":"alliance-for-renewable-electrification"},"document_type":"case study","language":"en","date_published":"2023-01-17","source_url":"https://renewelec.org/case-study/accionaorg-foundation-luz-en-casa-amazonia-microgrid-pilot-project-copal-urco/","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"The Luz en Casa Amazonia Microgrid Pilot Project in Copal Urco, Peru, replaced a diesel-fed system that provided only three hours of daily power with a 33.5-kWp solar PV station and 95-kWh lithium battery storage. Funded with EUR 185,000 by acciona.org, the project provides at least six hours of electricity daily to 60 households and 24-hour power to schools, a health centre, and a community centre. The initiative avoids 50 tonnes of CO2 emissions annually and utilizes a pay-for-service model where users purchase kWh at a local centre. The project also supports local commerce through cooling systems and enabled online education during the COVID-19 pandemic.","ai_generated":true,"unit":"ruralele-000055#summary","date_modified":"2026-10-23"},"key_insights":[{"text":"The project replaced a 45 kW diesel-fed microgrid that provided only three hours of electricity per day with a 33.5-kWp solar PV station and a 95-kWh lithium battery-based storage system, retaining a diesel generator for backup.","ai_generated":true,"unit":"ruralele-000055#insight-1","date_modified":"2026-10-23"},{"text":"The new infrastructure provides 24-hour electricity to three schools, one health centre, and one community centre, three hours of nightly street lighting, and at least six hours of daily electricity to 60 households.","ai_generated":true,"unit":"ruralele-000055#insight-2","date_modified":"2026-10-23"},{"text":"The project employs a pay-for-service model where acciona.org sets an affordable cost per kWh, users purchase electricity at the Luz en Casa Centre, and a trained community group handles preventive maintenance.","ai_generated":true,"unit":"ruralele-000055#insight-3","date_modified":"2026-10-23"},{"text":"Environmental and social benefits include the mitigation of 50 tonnes of CO2 per year, the prevention of fuel leaks into the Napo River, the creation of a paid maintenance job, and the ability to deliver online classes during the COVID-19 pandemic.","ai_generated":true,"unit":"ruralele-000055#insight-4","date_modified":"2026-10-23"}],"climate_tags":["photovoltaics","microgrid","energy storage","green job","climate change mitigation","energy access"],"geography_discussed":["Loreto Department"],"frame_perspective":[],"analysis_type":["case study"]}]}