{"query_echo":{"q":"","filters":{"geography":["Cheyyur"]},"warnings":[]},"total":{"value":1,"relation":"eq"},"page":1,"page_size":20,"self":"https://climateinsightsdirectory.org/api/v1/search?geography=Cheyyur","stability":"beta","ai_marking":{"digital_source_type":{"uri":"http://cv.iptc.org/newscodes/digitalsourcetype/trainedAlgorithmicMedia","name":"Created using Generative AI"},"notice":"Summary and key insights are generated using artificial intelligence."},"results":[{"id":"ieefa-001085","url":"https://climateinsightsdirectory.org/document/ieefa-001085","title":"சசெய்யூர் மின் திட்டம் குறித்த ஆய்வறிக்கக","publisher":{"name":"Institute for Energy Economics and Financial Analysis","organization":"institute-for-energy-economics-and-financial-analysis"},"document_type":"report","language":"ta","date_published":null,"source_url":"https://ieefa.org/wp-content/uploads/2015/05/cheyyur-Project-Tamil-Translation1.pdf","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"The IEEFA report concludes that the 4,000 MW Cheyyur coal power plant is not a profitable project and will impose an excessive financial burden on consumers through high electricity tariffs.","ai_generated":true,"unit":"ieefa-001085#summary","date_modified":"2026-11-05"},"key_insights":[{"text":"The 4,000 MW Cheyyur ultra supercritical coal power plant is deemed not profitable and will result in electricity tariffs that consumers cannot afford.","ai_generated":true,"unit":"ieefa-001085#insight-1","date_modified":"2026-11-05"},{"text":"The cost of electricity from the Cheyyur plant is projected to be Rs. 4.9 per unit in its first year of operation (2021), with an average cost of Rs. 5.95 per unit over its 40-year lifespan, significantly higher than other ultra supercritical projects in India which range from Rs. 1.15 to 3.7 per unit.","ai_generated":true,"unit":"ieefa-001085#insight-2","date_modified":"2026-11-05"},{"text":"The project's cost calculations exclude the impacts on public health, agriculture, fisheries, and local water resources, and do not account for potential cost increases due to land acquisition and local opposition.","ai_generated":true,"unit":"ieefa-001085#insight-3","date_modified":"2026-11-05"},{"text":"The plant is designed to require 12 to 14 million tonnes of coal per year, with costs calculated based on the assumption that using local coal would be approximately twice as expensive.","ai_generated":true,"unit":"ieefa-001085#insight-4","date_modified":"2026-11-05"}],"climate_tags":["coal","wind power","solar energy"],"geography_discussed":["India"],"frame_perspective":[],"analysis_type":["financial analysis","policy analysis"]}]}