{"query_echo":{"q":"","filters":{"geography":["Cautín Province"]},"warnings":[{"code":"facet_value_not_in_vocabulary","message":"Value 'Cautín Province' for facet 'geography' is not in the controlled vocabulary."}]},"total":{"value":1,"relation":"eq"},"page":1,"page_size":20,"self":"https://climateinsightsdirectory.org/api/v1/search?geography=Caut%C3%ADn+Province","stability":"beta","ai_marking":{"digital_source_type":{"uri":"http://cv.iptc.org/newscodes/digitalsourcetype/trainedAlgorithmicMedia","name":"Created using Generative AI"},"notice":"Summary and key insights are generated using artificial intelligence."},"results":[{"id":"gaia-000086","url":"https://climateinsightsdirectory.org/document/gaia-000086","title":"Não à iniciação na América Latina: Temuco, Chile","publisher":{"name":"Global Alliance for Incinerator Alternatives","organization":"global-alliance-for-incinerator-alternatives"},"document_type":"case study","language":"pt","date_published":"2023-04-19","source_url":"https://www.no-burn.org/resources/nao-a-iniciacao-na-america-latina-temuco-chile/","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"In 2016, WTE Araucanía SPA proposed a waste incinerator in Lautaro, Chile, designed to process 200,000 tonnes of waste per year, primarily from Temuco. Local citizens actively campaigned against the project, leading to its rejection by local governance.","ai_generated":true,"unit":"gaia-000086#summary","date_modified":"2026-11-05"},"key_insights":[{"text":"In 2016, the company WTE Araucanía SPA proposed installing a waste incinerator in the city of Lautaro, located in the Cautín province of the Araucanía region, with a capacity to treat 200,000 tonnes of waste per year.","ai_generated":true,"unit":"gaia-000086#insight-1","date_modified":"2026-11-05"},{"text":"The incinerator was intended to initially process waste from the regional capital, Temuco, and eventually serve the entire region. Currently, the region generates 306,000 tonnes of waste annually, with at least half of that volume—originating from Temuco—being transported to the Bio Bio region at a monthly cost of 453,000 USD to the municipality.","ai_generated":true,"unit":"gaia-000086#insight-2","date_modified":"2026-11-05"},{"text":"The project was rejected by local governance following active efforts by citizens to educate themselves on the consequences of such projects and to repudiate the proposal.","ai_generated":true,"unit":"gaia-000086#insight-3","date_modified":"2026-11-05"}],"climate_tags":["incineration","waste management"],"geography_discussed":["Biobío Region"],"frame_perspective":[],"analysis_type":["case study"]}]}