{"query_echo":{"q":"","filters":{"climate_tags":["water monitoring"]},"warnings":[{"code":"facet_value_not_in_vocabulary","message":"Value 'water monitoring' for facet 'climate_tags' is not in the controlled vocabulary."}]},"total":{"value":2,"relation":"eq"},"page":1,"page_size":20,"self":"https://climateinsightsdirectory.org/api/v1/search?climate_tags=water+monitoring","stability":"beta","ai_marking":{"digital_source_type":{"uri":"http://cv.iptc.org/newscodes/digitalsourcetype/trainedAlgorithmicMedia","name":"Created using Generative AI"},"notice":"Summary and key insights are generated using artificial intelligence."},"results":[{"id":"iisd-000565","url":"https://climateinsightsdirectory.org/document/iisd-000565","title":"Adaptive Monitoring on the Winnipeg River","publisher":{"name":"International Institute for Sustainable Development","organization":"international-institute-for-sustainable-development"},"document_type":"briefing","language":"en","date_published":"2022-07-05","source_url":"https://www.iisd.org/publications/brief/adaptive-monitoring-winnipeg-river","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"The International Institute for Sustainable Development (IISD) and Aquatic Life® are conducting a pilot project in the Winnipeg River basin to test high-frequency sensors that provide near real-time freshwater data via mobile networks and satellites.","ai_generated":true,"unit":"iisd-000565#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"IISD and Aquatic Life® have launched a pilot project in the Winnipeg River basin utilizing high-frequency sensors that transmit data in near real-time through satellites and mobile data networks. The project aims to enhance the shared understanding of the river's state, create near-term forecasting and surrogate models, and employ spectral fingerprints to distinguish between nitrogen and phosphorus.","ai_generated":true,"unit":"iisd-000565#insight-1","date_modified":"2026-08-17"},{"text":"Current project progress includes the installation of sensors at two specific locations: the Powerview-Pine Falls Drinking Water Treatment Facility and the Pinawa Marina.","ai_generated":true,"unit":"iisd-000565#insight-2","date_modified":"2026-08-17"}],"climate_tags":["freshwater","water monitoring","sensors"],"geography_discussed":["Pinawa Marina","Powerview-Pine Falls Drinking Water Treatment Facility"],"frame_perspective":[],"analysis_type":["pilot project"]},{"id":"cer-000147","url":"https://climateinsightsdirectory.org/document/cer-000147","title":"2011-da-terblanche-q44-hammarsdale-sludge-reports_-follow-up-question-on-q387-ea2e14be7560e234.pdf","publisher":{"name":"Centre for Environmental Rights","organization":"centre-for-environmental-rights"},"document_type":"briefing","language":"en","date_published":null,"source_url":"https://cer.org.za/wp-content/uploads/2011/11/2011-DA-Terblanche-Q44-Hammarsdale-sludge-reports_-follow-up-question-on-Q387.pdf?x21779","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","analysis_type"],"summary":{"text":"This document is a draft written reply from the Minister of Water and Environmental Affairs to a National Assembly question (Question 44) posed by Mrs J F Terblanche (DA) regarding the status of the Hammarsdale sludge pond site.","ai_generated":true,"unit":"cer-000147#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"No further rehabilitation work has been conducted at the Hammarsdale sludge pond site because of budgetary constraints.","ai_generated":true,"unit":"cer-000147#insight-1","date_modified":"2026-08-17"},{"text":"The Department of Water and Environmental Affairs intended to appoint a contractor to complete a concrete palisade fence at the site by the end of April 2011, following the receipt of quotations.","ai_generated":true,"unit":"cer-000147#insight-2","date_modified":"2026-08-17"},{"text":"Water monitoring was last performed in March 2010, with results indicating that the sludge ponds were not impacting groundwater or surface water; the next monitoring round was scheduled for April 2011. Public access to these reports is available via the Department's Regional Office in KwaZulu-Natal.","ai_generated":true,"unit":"cer-000147#insight-3","date_modified":"2026-08-17"}],"climate_tags":["water monitoring","environmental rehabilitation"],"geography_discussed":[],"frame_perspective":[],"analysis_type":["government response"]}]}