{"query_echo":{"q":"","filters":{"climate_tags":["jetp"]},"warnings":[{"code":"facet_value_not_in_vocabulary","message":"Value 'jetp' for facet 'climate_tags' is not in the controlled vocabulary."}]},"total":{"value":3,"relation":"eq"},"page":1,"page_size":20,"self":"https://climateinsightsdirectory.org/api/v1/search?climate_tags=jetp","stability":"beta","ai_marking":{"digital_source_type":{"uri":"http://cv.iptc.org/newscodes/digitalsourcetype/trainedAlgorithmicMedia","name":"Created using Generative AI"},"notice":"Summary and key insights are generated using artificial intelligence."},"results":[{"id":"trendas-000017","url":"https://climateinsightsdirectory.org/document/trendas-000017","title":"Ambiguitas Versus Ambisi: Tinjauan Kebijakan Transisi Energi Indonesia","publisher":{"name":"Trend Asia","organization":"trend-asia"},"document_type":"report","language":"id","date_published":"2023-03-28","source_url":"https://trendasia.org/ambiguitas-versus-ambisi-tinjauan-kebijakan-transisi-energi-indonesia/","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","analysis_type"],"summary":{"text":"This report by Trend Asia examines Indonesia's energy transition policies, specifically focusing on the Just Energy Transition Partnership (JETP) and the role of the state electricity company, PLN, in managing energy capacity and emissions.","ai_generated":true,"unit":"trendas-000017#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"The Just Energy Transition Partnership (JETP) mandates that the Indonesian government reduce energy sector emissions by 2030 to no more than 290 million tons of CO2, down from the original target of 357 million tons, and increase the renewable energy mix to at least 34%, compared to the government's target of 23.4%.","ai_generated":true,"unit":"trendas-000017#insight-1","date_modified":"2026-08-17"},{"text":"Between 2017 and 2021, Indonesia increased its operating coal power plant units by 30%, adding over 12 GW of fossil fuel capacity, while renewable energy additions were limited to 1.6 GW, primarily from geothermal and hydropower, with solar and wind contributing less than 1%.","ai_generated":true,"unit":"trendas-000017#insight-2","date_modified":"2026-08-17"},{"text":"The state electricity company, PLN, faces poor finances and heavy debt burdens due to massive capital-intensive fossil fuel capacity additions and an oversupply caused by overestimated future demand and market barriers.","ai_generated":true,"unit":"trendas-000017#insight-3","date_modified":"2026-08-17"}],"climate_tags":["energy transition","renewable energy","coal","ghg emissions","jetp"],"geography_discussed":[],"frame_perspective":[],"analysis_type":["Policy Review"]},{"id":"trendas-000020","url":"https://climateinsightsdirectory.org/document/trendas-000020","title":"Ambiguities versus Ambition: A Review of Indonesia's Energy Transition Policy","publisher":{"name":"Trend Asia","organization":"trend-asia"},"document_type":"report","language":"en","date_published":"2023-03-28","source_url":"https://trendasia.org/en/ambiguities-versus-ambition-a-review-of-indonesias-energy-transition-policy/","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","analysis_type"],"summary":{"text":"A review of Indonesia's energy transition policy focusing on the challenges of meeting Just Energy Transition Partnership (JETP) targets amidst a legacy of coal-fired power expansion and state utility debt.","ai_generated":true,"unit":"trendas-000020#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"Indonesia faces significant challenges in meeting JETP targets, which include peaking power sector emissions by 2030 and achieving 34% renewable energy generation by 2030. These goals require a fundamental change in power regulation and a departure from previous energy security planning.","ai_generated":true,"unit":"trendas-000020#insight-1","date_modified":"2026-08-17"},{"text":"Recent energy capacity additions have been dominated by fossil fuels, with over 12 GW commissioned in the last five years, increasing the coal fleet by 30%. In contrast, renewable energy growth is slow, with only 1.6 GW added between 2017 and 2021, primarily from geothermal and hydro, while solar and wind represent less than 1% of additions.","ai_generated":true,"unit":"trendas-000020#insight-2","date_modified":"2026-08-17"},{"text":"The state electricity company, Perusahaan Listrik Negara (PLN), suffers from heavy debt and poor financial returns due to an oversupply of electricity. This oversupply resulted from overestimating demand and over-constructing large fossil fuel generators, alongside market barriers. To align with JETP, the updated Electricity Supply Business Plan (RUPTL) must halt and cancel committed and awarded new coal power plants.","ai_generated":true,"unit":"trendas-000020#insight-3","date_modified":"2026-08-17"}],"climate_tags":["energy transition","renewable energy","coal-fired power plants","jetp","power sector emissions"],"geography_discussed":[],"frame_perspective":[],"analysis_type":["Policy Review"]},{"id":"gem-000066","url":"https://climateinsightsdirectory.org/document/gem-000066","title":"Boom-Bust-Coal-2024-Vietnamese","publisher":{"name":"Global Energy Monitor","organization":"global-energy-monitor"},"document_type":"report","language":"vi","date_published":null,"source_url":"https://globalenergymonitor.org/sites/default/files/migration/reports/Boom-Bust-Coal-2024-Vietnamese_11.pdf","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"This document is a Vietnamese translation of excerpts from the 'Boom & Burst Coal 2024' report by Global Energy Monitor and its partners. It analyzes global coal power trends in 2023, highlighting a dichotomy where new construction has hit a 9-year low outside China but an 8-year high within China. The report provides a detailed assessment of Vietnam's energy transition, focusing on the Power Development Plan VIII (PDP8) and the Just Energy Transition Partnership (JETP), while noting that global coal capacity reached an all-time high in 2023.","ai_generated":true,"unit":"gem-000066#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"Global coal power capacity increased by 48.4 gigawatts (GW), or 2%, in 2023 to a total of 2,130 GW, with China accounting for two-thirds of these additions.","ai_generated":true,"unit":"gem-000066#insight-1","date_modified":"2026-08-17"},{"text":"There is a stark contrast in new coal construction: starts reached a 9-year low in countries outside China, while in China, they reached an 8-year high, contradicting President Xi Jinping's 2021 commitment to \"strictly control\" coal projects.","ai_generated":true,"unit":"gem-000066#insight-2","date_modified":"2026-08-17"},{"text":"Only 15% (317 GW) of the world's operating coal capacity currently has a decommissioning commitment aligned with the Paris Agreement's 1.5°C goal. To phase out operating capacity by 2040, an average of 126 GW must be decommissioned annually for the next 17 years.","ai_generated":true,"unit":"gem-000066#insight-3","date_modified":"2026-08-17"},{"text":"Vietnam's Power Development Plan VIII (PDP8) specifies that coal capacity will peak at 30.2 GW by 2030 and gradually decrease to 0 GW by 2050. As of December 2023, Vietnam had 27.2 GW of operating capacity, implying a limit of 3 GW in additional capacity.","ai_generated":true,"unit":"gem-000066#insight-4","date_modified":"2026-08-17"},{"text":"Despite PDP8 goals, Vietnam had 3.9 GW of capacity across 6 units still under construction at the end of 2023, plus 4 GW in 'pre-permitting' or 'permitted' stages at the An Khánh - Bắc Giang, Na Dương-2, Nam Định-1, and Sông Hậu-2 plants.","ai_generated":true,"unit":"gem-000066#insight-5","date_modified":"2026-08-17"},{"text":"The Just Energy Transition Partnership (JETP) for Vietnam, supported by a $15.5 billion funding package from G7 nations, aims for peak emissions by 2030. The JETP Resource Mobilization Plan (RMP) seeks to reduce the number of coal projects and close inefficient plants, though specific decommissioning dates per plant are missing.","ai_generated":true,"unit":"gem-000066#insight-6","date_modified":"2026-08-17"},{"text":"In 2023, India proposed 11.4 GW of entirely new coal power, the highest amount since 2016, and some long-delayed projects were revived.","ai_generated":true,"unit":"gem-000066#insight-7","date_modified":"2026-08-17"}],"climate_tags":["coal phase-out","energy transition","power development plan viii","jetp","global coal capacity"],"geography_discussed":["People's Republic of China","India","European Union","United Kingdom","United States","Turkey","Indonesia","Pakistan","Bangladesh","Laos","Philippines","South Korea","Japan","Australia","Central Asia","Middle East and North Africa","sub-Saharan Africa","Latin America","Kazakhstan","Zimbabwe","Brazil"],"frame_perspective":[],"analysis_type":["Policy analysis","Capacity monitoring","Trend analysis"]}]}