{"query_echo":{"q":"","filters":{"climate_tags":["emissions monitoring"]},"warnings":[]},"total":{"value":12,"relation":"eq"},"page":1,"page_size":20,"self":"https://climateinsightsdirectory.org/api/v1/search?climate_tags=emissions+monitoring","stability":"beta","ai_marking":{"digital_source_type":{"uri":"http://cv.iptc.org/newscodes/digitalsourcetype/trainedAlgorithmicMedia","name":"Created using Generative AI"},"notice":"Summary and key insights are generated using artificial intelligence."},"results":[{"id":"cer-000535","url":"https://climateinsightsdirectory.org/document/cer-000535","title":"arnot-ael_april-2015-b7b67fb18afa1b35.pdf","publisher":{"name":"Centre for Environmental Rights","organization":"centre-for-environmental-rights"},"document_type":"report","language":"en","date_published":null,"source_url":"https://cer.org.za/wp-content/uploads/2015/04/Arnot-AEL_April-2015.pdf?x21779","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"This document consists of a formal letter and a variation of the Atmospheric Emission Licence (AEL) issued by the Nkangala District Municipality to Eskom Holdings SOC Limited for the Arnot Power Station. The letter, dated 20 April 2015, addresses Eskom's request to correct errors in the AEL, while the attached licence specifies the operational conditions, emission limits, and reporting requirements for the power station's activities.","ai_generated":true,"unit":"cer-000535#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"The Nkangala District Municipality issued a variation of the Atmospheric Emission Licence (AEL No: 17/4/AEL/MP313/11/10) for the Arnot Power Station, which is valid until 31 March 2019.","ai_generated":true,"unit":"cer-000535#insight-1","date_modified":"2026-08-17"},{"text":"The Arnot Power Station is authorised to conduct three listed activities: solid fuel combustion installations for steam raising or electricity generation (1.1), storage and handling of petroleum products in facilities exceeding 1000 cubic metres (2.4), and storage and handling of ore and coal (5.1).","ai_generated":true,"unit":"cer-000535#insight-2","date_modified":"2026-08-17"},{"text":"The power station's process involves burning coal, which generates approximately 130,000 tons of ash per month and flue gases containing carbon dioxide, sulphur dioxide, nitrogen dioxide, and dust particulates.","ai_generated":true,"unit":"cer-000535#insight-3","date_modified":"2026-08-17"},{"text":"The facility consumes approximately 105,033 tons of coal and 10,000 tons of fuel oil per month.","ai_generated":true,"unit":"cer-000535#insight-4","date_modified":"2026-08-17"},{"text":"Eskom is required to submit an Emission Offset Programme to reduce particulate matter (PM) pollution in the ambient or receiving environment by 31 March 2016.","ai_generated":true,"unit":"cer-000535#insight-5","date_modified":"2026-08-17"},{"text":"The licence mandates continuous monitoring and reporting of gaseous emissions, specifically sulphur dioxide (SO2) and nitrogen oxides (NOx), starting from 1 June 2015.","ai_generated":true,"unit":"cer-000535#insight-6","date_modified":"2026-08-17"},{"text":"The municipality denied a request to vary SO2 limits, stating this was a decision made by the National Air Quality Officer during a previous postponement request.","ai_generated":true,"unit":"cer-000535#insight-7","date_modified":"2026-08-17"},{"text":"The facility must maintain an official Air Quality Complaints Register and report the total number of complaints to the licensing authority on a monthly basis.","ai_generated":true,"unit":"cer-000535#insight-8","date_modified":"2026-08-17"}],"climate_tags":["energy transition","air quality","coal power","emissions monitoring","environmental regulation"],"geography_discussed":["Rietkuil","Mpumalanga","Steve Tshwete Local Municipality","Highveld Priority Area"],"frame_perspective":[],"analysis_type":["regulatory compliance","licensing"]},{"id":"cer-000560","url":"https://climateinsightsdirectory.org/document/cer-000560","title":"camden-ael_april-2015-f45e0519cc504d2d.pdf","publisher":{"name":"Centre for Environmental Rights","organization":"centre-for-environmental-rights"},"document_type":"statement","language":"en","date_published":null,"source_url":"https://cer.org.za/wp-content/uploads/2014/06/Camden-AEL_April-2015.pdf?x21779","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"This document is an Atmospheric Emission Licence (AEL) issued on 31 March 2015 by the Gert Sibande District Municipality to Eskom Holdings SOC Limited for the Camden Power Station. The licence, issued under the National Environmental Management: Air Quality Act, 2004, regulates emissions from solid fuel combustion, petroleum storage, and coal handling, establishing specific operational requirements, emission limits, and monitoring obligations for a period not exceeding five years.","ai_generated":true,"unit":"cer-000560#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"The Atmospheric Emission Licence (AEL) was issued to Eskom Holdings SOC Limited (Camden Power Station) on 31 March 2015 by the Gert Sibande District Municipality. It is a review licence intended to transfer the facility from an APPA registration certificate to an AEL and is valid for a period not exceeding five years.","ai_generated":true,"unit":"cer-000560#insight-1","date_modified":"2026-08-17"},{"text":"The licence covers three specific listed activity categories: Category 1 Sub-category 1.1 (solid fuel combustion for steam raising or electricity generation), Category 2 Sub-category 2.4 (petroleum products storage tanks and transfer facilities), and Category 5 Sub-category 5.1 (storage and handling of ore and coal).","ai_generated":true,"unit":"cer-000560#insight-2","date_modified":"2026-08-17"},{"text":"The Camden Power Station utilizes a process where coal is ground into Pulverised fuel (PF) and combusted in boilers (Units 1-8). The process produces heat, ash, CO2, SO2, and NOx, with 80% of ash removed by a fabric filter (fly ash) and 20% removed from the bottom of the boiler (bottom ash).","ai_generated":true,"unit":"cer-000560#insight-3","date_modified":"2026-08-17"},{"text":"The facility is located within the Highveld Priority Area, a designated national air pollution priority area, which may lead to the introduction of stricter conditions. The licence requires all units to be fitted with continuous emission monitoring equipment for PM, SO2, and NOx.","ai_generated":true,"unit":"cer-000560#insight-4","date_modified":"2026-08-17"},{"text":"The licence mandates specific abatement equipment, specifically Howden Pulse Jet Fabric filter bag plants for Boiler Units 1 through 8, with a reported minimum control efficiency of 95%. These must be operated 100% of the time during normal operation.","ai_generated":true,"unit":"cer-000560#insight-5","date_modified":"2026-08-17"},{"text":"The licence holder is required to maintain a complaints register for noise, dust, and offensive odours, which must be available for inspection and kept for at least five years. Additionally, a summarized report of complaints must be submitted monthly to the licensing authority.","ai_generated":true,"unit":"cer-000560#insight-6","date_modified":"2026-08-17"},{"text":"The licence holder must submit an annual report to the licensing authority within 60 days of the end of the reporting period. This report must include pollutant emission trends, compliance audit reports, and the implementation status of the Highveld Priority Air Quality Management Plan and offset programs.","ai_generated":true,"unit":"cer-000560#insight-7","date_modified":"2026-08-17"}],"climate_tags":["energy transition","air quality","emissions monitoring","coal-fired power"],"geography_discussed":["Mpumalanga","Gert Sibande District Municipality","Msukaligwa Local Municipality","Highveld Priority Area"],"frame_perspective":[],"analysis_type":["regulatory","technical"]},{"id":"cer-000871","url":"https://climateinsightsdirectory.org/document/cer-000871","title":"duvha-ael-07-04-2015-44120652613d42d3.pdf","publisher":{"name":"Centre for Environmental Rights","organization":"centre-for-environmental-rights"},"document_type":"report","language":"en","date_published":null,"source_url":"https://cer.org.za/wp-content/uploads/2015/04/DUVHA-AEL-07-04-2015.pdf?x21779","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","analysis_type"],"summary":{"text":"This document is a variation of an Atmospheric Emission Licence (AEL) issued by the Nkangala District Municipality to Eskom Holdings SOC Limited for the Duvha Power Station. The licence, valid until 31 May 2017, regulates atmospheric emissions from listed activities including solid fuel combustion, petroleum product storage, and coal handling, setting specific emission limits for particulate matter (PM), sulphur dioxide (SO2), and nitrogen oxides (NOx).","ai_generated":true,"unit":"cer-000871#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"The Atmospheric Emission Licence (AEL) for Duvha Power Station is a variation issued by the Nkangala District Municipality, valid until 31 May 2017. It covers listed activities including solid fuel combustion installations for electricity generation, storage and handling of petroleum products, and storage and handling of coal not on a mine premises.","ai_generated":true,"unit":"cer-000871#insight-1","date_modified":"2026-08-17"},{"text":"Duvha Power Station generates 600 MW of electricity, with 575 MW sent to the national transmission network and 25 MW used internally. The plant consumes up to 1,400,000 tons of coal and 5,000 tons of fuel oil per month.","ai_generated":true,"unit":"cer-000871#insight-2","date_modified":"2026-08-17"},{"text":"The facility employs specific abatement technologies to control emissions: Units 1, 2, and 3 use fabric filter bags (FFP) with a design efficiency of 99% and a minimum control of 50 mg/Nm³, while Units 4, 5, and 6 use electrostatic precipitators (ESP) with a design efficiency of 99.6% and a minimum control of 75 mg/Nm³.","ai_generated":true,"unit":"cer-000871#insight-3","date_modified":"2026-08-17"},{"text":"The licence establishes a phased reduction schedule for maximum emission rates. For PM, the limit is 100 mg/Nm³ by 1 April 2015, reducing to 50 mg/Nm³ by 1 April 2020. For SO2, the limit is 3500 mg/Nm³ by 1 April 2015, 2300 mg/Nm³ by 1 April 2020, and 500 mg/Nm³ by 4 April 2025. NOx limits are 1100 mg/Nm³ until 31 March 2025, then 750 mg/Nm³ from 1 April 2025.","ai_generated":true,"unit":"cer-000871#insight-4","date_modified":"2026-08-17"},{"text":"Eskom is required to implement an Emission Offset Programme to reduce particulate matter (PM) pollution in the ambient or receiving environment by 31 March 2016.","ai_generated":true,"unit":"cer-000871#insight-5","date_modified":"2026-08-17"},{"text":"The licence mandates strict monitoring and reporting, including continuous monitoring of PM, SO2, and NOx for all units (U1-U6) with monthly reporting. The holder must also maintain a complaints register for noise, dust, and odours, and submit annual reports covering pollutant trends, compliance audits, major upgrades, and greenhouse gas emissions.","ai_generated":true,"unit":"cer-000871#insight-6","date_modified":"2026-08-17"}],"climate_tags":["energy transition","air quality","coal-fired power","emissions monitoring","particulate matter","sulphur dioxide","nitrogen oxides","greenhouse gas emissions"],"geography_discussed":[],"frame_perspective":[],"analysis_type":["regulatory compliance","technical specifications"]},{"id":"cer-000877","url":"https://climateinsightsdirectory.org/document/cer-000877","title":"duvha_ael-after-appeal_jun13-f925ae6d97af40a3.pdf","publisher":{"name":"Centre for Environmental Rights","organization":"centre-for-environmental-rights"},"document_type":"report","language":"en","date_published":null,"source_url":"https://cer.org.za/wp-content/uploads/2014/03/Duvha_AEL-after-appeal_Jun13.pdf?x21779","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"This document is an Atmospheric Emission Licence (AEL) issued to Eskom Holdings SOC Limited for the Duvha Power Station in Mpumalanga, South Africa. Issued by the Mpumalanga Department of Economic Development, Environment and Tourism, the licence varies previous conditions following an appeal and establishes legal requirements for air quality management, emission limits, and monitoring for the facility's coal-fired power generation activities.","ai_generated":true,"unit":"cer-000877#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"The Atmospheric Emission Licence for Duvha Power Station is valid until 31 May 2017 and covers listed activities under Category 1.1, Category 2.2, and Category 5.1 of the National Environmental Management: Air Quality Act, 2004.","ai_generated":true,"unit":"cer-000877#insight-1","date_modified":"2026-08-17"},{"text":"Duvha Power Station generates 600MW of electricity, with 575MW sent to the national transmission network and 25MW used internally. The facility consumes coal at a maximum permitted rate of 1,400,000 tons per month.","ai_generated":true,"unit":"cer-000877#insight-2","date_modified":"2026-08-17"},{"text":"The station utilizes different abatement technologies across its units: Units 1-3 use fabric filter bags, while Units 4-6 use electrostatic precipitators (ESP).","ai_generated":true,"unit":"cer-000877#insight-3","date_modified":"2026-08-17"},{"text":"The licence mandates the installation of continuous emission monitoring equipment for particulate matter (PM), SO2, and NOx for all units by 2015.","ai_generated":true,"unit":"cer-000877#insight-4","date_modified":"2026-08-17"},{"text":"Specific emission limits for particulate matter (PM) are set to decrease over time: for Units 1-6, the limit is 100 mg/Nm3 immediately, reducing to 75 mg/Nm3 by 1 April 2015, and further to 50 mg/Nm3 by 1 April 2020.","ai_generated":true,"unit":"cer-000877#insight-5","date_modified":"2026-08-17"},{"text":"The facility is located within the Highveld Priority Area (HPA), and the licensing authority may review conditions to align with Highveld Air Pollution Priority Area interventions.","ai_generated":true,"unit":"cer-000877#insight-6","date_modified":"2026-08-17"},{"text":"The licence holder is required to maintain an official Air Quality Complaints Register and report the total number of complaints to the licensing authority on a monthly basis.","ai_generated":true,"unit":"cer-000877#insight-7","date_modified":"2026-08-17"}],"climate_tags":["energy transition","coal-fired power","air quality","emissions monitoring","industrial pollution"],"geography_discussed":["Nkangala District Municipality"],"frame_perspective":[],"analysis_type":["regulatory compliance","environmental permitting"]},{"id":"cer-001010","url":"https://climateinsightsdirectory.org/document/cer-001010","title":"hendrina-ael_31mar2016-083e4f9841af0b6e.pdf","publisher":{"name":"Centre for Environmental Rights","organization":"centre-for-environmental-rights"},"document_type":"statement","language":"en","date_published":null,"source_url":"https://cer.org.za/wp-content/uploads/2014/06/Hendrina-AEL_31Mar2016.pdf?x21779","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","analysis_type"],"summary":{"text":"This document is an Atmospheric Emission Licence (AEL) issued by the Nkangala District Municipality to Eskom Holdings SOC Limited for the Hendrina Power Station. The licence, varied on 31 March 2016, sets out the legal conditions, emission limits, and monitoring requirements for the station's operations under the National Environmental Management: Air Quality Act, 2004.","ai_generated":true,"unit":"cer-001010#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"The Atmospheric Emission Licence (AEL) for the Hendrina Power Station was varied on 31 March 2016 and is valid until 31 March 2019.","ai_generated":true,"unit":"cer-001010#insight-1","date_modified":"2026-08-17"},{"text":"The Hendrina Power Station has a total capacity of 2000 MW, consisting of ten 200MW Boiler sets that use pulverised fuel (PF) fired boilers. The operational life of individual units is expected to last at least until 2025, with an annual installed plant load factor between 75% and 90%.","ai_generated":true,"unit":"cer-001010#insight-2","date_modified":"2026-08-17"},{"text":"The facility is authorised to conduct three listed activities: solid fuel combustion for steam raising or electricity generation (Category 1.1), storage of liquid petroleum products with a combined capacity exceeding 1000 cubic metres (Category 2.4), and storage and handling of coal not situated on a mine (Category 5.1).","ai_generated":true,"unit":"cer-001010#insight-3","date_modified":"2026-08-17"},{"text":"The station's maximum permitted raw material consumption is 820,000 tons of coal per month and 3,200 tons of fuel oil per month. The maximum design production capacity for electricity is 2000 MW, with a by-product of ash produced at a maximum permitted capacity of 290,000 tons per month.","ai_generated":true,"unit":"cer-001010#insight-4","date_modified":"2026-08-17"},{"text":"The licence mandates that both smoke stacks be equipped with continuous emission monitoring equipment for particulate matter (PM), sulphur dioxide (SO2), and nitrogen oxides (NOx) by 1 June 2015.","ai_generated":true,"unit":"cer-001010#insight-5","date_modified":"2026-08-17"},{"text":"Eskom Hendrina Power Station is required to provide an approved, time-bound Atmospheric Emission Off-Set Plan by 31 March 2016 to reduce PM pollution in the ambient or receiving environment.","ai_generated":true,"unit":"cer-001010#insight-6","date_modified":"2026-08-17"},{"text":"The facility is located within the Highveld Air Pollution Priority Area (HPA), and the licence holder must maintain an official Air Quality Complaints Register and submit annual reports to the Licensing Authority within 60 days of the end of each reporting period.","ai_generated":true,"unit":"cer-001010#insight-7","date_modified":"2026-08-17"}],"climate_tags":["energy transition","electricity generation","air quality","coal power","emissions monitoring"],"geography_discussed":[],"frame_perspective":[],"analysis_type":["regulatory compliance","environmental permitting"]},{"id":"cer-001011","url":"https://climateinsightsdirectory.org/document/cer-001011","title":"hendrina-ael_april-2015-b9d142910e00261d.pdf","publisher":{"name":"Centre for Environmental Rights","organization":"centre-for-environmental-rights"},"document_type":"statement","language":"en","date_published":null,"source_url":"https://cer.org.za/wp-content/uploads/2014/06/Hendrina-AEL_April-2015.pdf?x21779","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","analysis_type"],"summary":{"text":"This document is a variation of an Atmospheric Emission Licence (AEL) issued by the Nkangala District Municipality to Eskom Holdings SOC Limited for the Hendrina Power Station. The licence, valid until 31 March 2019, regulates emissions from listed activities including solid fuel combustion, storage of liquid petroleum products, and handling of coal.","ai_generated":true,"unit":"cer-001011#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"The Atmospheric Emission Licence (AEL) for the Hendrina Power Station was re-issued on 31 March 2015 as a variation and remains valid until 31 March 2019.","ai_generated":true,"unit":"cer-001011#insight-1","date_modified":"2026-08-17"},{"text":"The Hendrina Power Station has a total capacity of 2000 MW, consisting of ten 200MW Boiler sets, and is expected to have an operational life until at least 2025.","ai_generated":true,"unit":"cer-001011#insight-2","date_modified":"2026-08-17"},{"text":"The facility's maximum permitted consumption rates for raw materials are 820,000 tons of coal per month and 3,200 tons of fuel oil per month.","ai_generated":true,"unit":"cer-001011#insight-3","date_modified":"2026-08-17"},{"text":"Eskom is required to install continuous emission monitoring equipment for particulate matter (PM), sulfur dioxide (SO2), and nitrogen oxides (NOx) on both stacks by 01 June 2015.","ai_generated":true,"unit":"cer-001011#insight-4","date_modified":"2026-08-17"},{"text":"The licence holder must submit an Emission Offset Programme to reduce PM pollution in the ambient or receiving environment by 31 March 2016.","ai_generated":true,"unit":"cer-001011#insight-5","date_modified":"2026-08-17"},{"text":"The facility is located within the Highveld Priority Area, and the licence holder must maintain a complaints register for noise, dust, and offensive odours, keeping records for at least five years.","ai_generated":true,"unit":"cer-001011#insight-6","date_modified":"2026-08-17"}],"climate_tags":["energy transition","air quality","power generation","emissions monitoring","coal"],"geography_discussed":[],"frame_perspective":[],"analysis_type":["regulatory","compliance"]},{"id":"cer-001056","url":"https://climateinsightsdirectory.org/document/cer-001056","title":"komati-ael_31mar2016-5c9b24c1f2764ac6.pdf","publisher":{"name":"Centre for Environmental Rights","organization":"centre-for-environmental-rights"},"document_type":"statement","language":"en","date_published":null,"source_url":"https://cer.org.za/wp-content/uploads/2014/06/Komati-AEL_31Mar2016.pdf?x21779","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"This document is an Atmospheric Emission Licence (AEL) issued by the Nkangala District Municipality to Eskom Holdings SOC Limited for the Komati Power Station. The licence, varied on 31 March 2016 following an appeal, sets specific emission limits for particulate matter (PM), sulphur dioxide (SO2), and nitrogen oxides (NOx), and mandates the implementation of an Atmospheric Emission Off-Set Plan to reduce PM pollution.","ai_generated":true,"unit":"cer-001056#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"The Atmospheric Emission Licence for the Komati Power Station was varied on 31 March 2016 and is valid until 31 March 2019.","ai_generated":true,"unit":"cer-001056#insight-1","date_modified":"2026-08-17"},{"text":"Komati Power Station has a total nominal capacity of 940 MW and utilizes nine boilers (Boilers 1 to 3 by Babcock and Wilcox and Boilers 4 to 9 by Mitchell Engineering) to generate electricity.","ai_generated":true,"unit":"cer-001056#insight-2","date_modified":"2026-08-17"},{"text":"The facility is authorized for three listed activities: solid fuel combustion installations for steam raising or electricity generation (Category 1.1), storage of petroleum products in facilities with a combined capacity exceeding 1000 cubic metres (Category 2.4), and storage and handling of coal not situated on a mine (Category 5.1).","ai_generated":true,"unit":"cer-001056#insight-3","date_modified":"2026-08-17"},{"text":"Maximum permitted consumption rates for raw materials are set at 460,000 tons per month for coal and 5,000 tons per month for fuel oil.","ai_generated":true,"unit":"cer-001056#insight-4","date_modified":"2026-08-17"},{"text":"The licence establishes specific maximum release rates for pollutants. For the East Flue (Boilers 1-5), PM limits are 100 mg/Nm3 (until April 2015) and 50 mg/Nm3 (from 1 April 2020), while SO2 limits are 3500 mg/Nm3 (until April 2015) and 2600 mg/Nm3 (from 1 April 2020). For the West Flue (Boilers 6-9), PM is limited to 500 mg/Nm3 (until 1 April 2025) and NOx is limited to 1300 mg/Nm3 (until April 2015) and 750 mg/Nm3 (from 1 April 2020).","ai_generated":true,"unit":"cer-001056#insight-5","date_modified":"2026-08-17"},{"text":"Eskom Komati Power Station was required to provide a specific and time-bound Atmospheric Emission Off-Set Plan to reduce PM pollution in the ambient/receiving environment by 31 March 2016.","ai_generated":true,"unit":"cer-001056#insight-6","date_modified":"2026-08-17"},{"text":"All units were required to be fitted with continuous emission monitoring equipment for PM, SO2, and NOx by 1 June 2015.","ai_generated":true,"unit":"cer-001056#insight-7","date_modified":"2026-08-17"}],"climate_tags":["energy transition","air quality","power generation","emissions monitoring","coal-fired power"],"geography_discussed":["Nkangala District Municipality","Mpumalanga","Steve Tshwete Local Municipality","Highveld Priority Area"],"frame_perspective":[],"analysis_type":["regulatory compliance","emission limits"]},{"id":"cer-001059","url":"https://climateinsightsdirectory.org/document/cer-001059","title":"komati-power-station-ael-2042015-6232103feb77f59e.pdf","publisher":{"name":"Centre for Environmental Rights","organization":"centre-for-environmental-rights"},"document_type":"statement","language":"en","date_published":null,"source_url":"https://cer.org.za/wp-content/uploads/2014/06/Komati-Power-Station-AEL-2042015.pdf?x21779","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"This document is an Atmospheric Emission Licence (AEL) variation issued by the Nkangala District Municipality to Eskom Holdings SOC Limited for the Komati Power Station. The licence, valid until 31 March 2019, regulates emissions from electricity generation activities, specifying maximum release rates for pollutants, monitoring requirements, and mitigation measures for fugitive emissions.","ai_generated":true,"unit":"cer-001059#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"The Atmospheric Emission Licence (AEL) No. NDM/AEL/MP313/12/12 was issued to Eskom Holdings SOC Limited - Komati Power Station and is valid until 31 March 2019.","ai_generated":true,"unit":"cer-001059#insight-1","date_modified":"2026-08-17"},{"text":"Komati Power Station has a total nominal capacity of 940 MW and is scheduled for decommissioning between 2024 and 2029 based on its 50-year life span.","ai_generated":true,"unit":"cer-001059#insight-2","date_modified":"2026-08-17"},{"text":"The facility is authorised for three listed activities: solid fuel combustion installations used for steam raising or electricity generation (Category 1.1), storage and handling of liquid petroleum products with a combined capacity exceeding 1000 cubic metres (Category 2.4), and storage and handling of ore and coal not situated on a mine (Category 5.1).","ai_generated":true,"unit":"cer-001059#insight-3","date_modified":"2026-08-17"},{"text":"Maximum permitted consumption rates for raw materials are 460,000 tons of coal per month and 5,000 tons of fuel oil per month.","ai_generated":true,"unit":"cer-001059#insight-4","date_modified":"2026-08-17"},{"text":"The licence sets specific maximum release rates for pollutants from the boiler stacks. For the East Flue Stack (Units 1-5), PM limits are 100 mg/Nm³ by 1 April 2015 and 50 mg/Nm³ by 1 April 2020, while SO2 limits are 3500 mg/Nm³ by 1 April 2015 and 2600 mg/Nm³ by 1 April 2020. For the West Flue Stack (Units 6-9), NOX limits are 1300 mg/Nm³ by 1 April 2015 and 750 mg/Nm³ by 1 April 2020.","ai_generated":true,"unit":"cer-001059#insight-5","date_modified":"2026-08-17"},{"text":"The Licence Holder is required to install continuous emission monitoring equipment for PM, SO2, and NOX on all units by 01 June 2015.","ai_generated":true,"unit":"cer-001059#insight-6","date_modified":"2026-08-17"},{"text":"The Licence Holder must submit an Emission Offset Programme to reduce PM pollution in the ambient or receiving environment by 31 March 2016.","ai_generated":true,"unit":"cer-001059#insight-7","date_modified":"2026-08-17"}],"climate_tags":["energy transition","electricity generation","air quality","coal-fired power","emissions monitoring"],"geography_discussed":["Nkangala District Municipality","Mpumalanga","Steve Tshwete Local Municipality","Highveld Priority Area"],"frame_perspective":[],"analysis_type":["regulatory compliance","environmental permitting"]},{"id":"cer-001060","url":"https://climateinsightsdirectory.org/document/cer-001060","title":"komati-power-station-final-ael-postponement-31-03-2015-f4f35d786bc6b280.pdf","publisher":{"name":"Centre for Environmental Rights","organization":"centre-for-environmental-rights"},"document_type":"statement","language":"en","date_published":null,"source_url":"https://cer.org.za/wp-content/uploads/2015/04/Komati-Power-Station-Final-AEL-Postponement-31-03-2015.pdf?x21779","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"This document is a variation of an Atmospheric Emission Licence (AEL) issued on 31 March 2015 by the Nkangala District Municipality to Eskom Holdings SOC Limited for the Komati Power Station. The licence, valid until 31 March 2019, regulates emissions from listed activities including solid fuel combustion, petroleum storage, and coal handling, while setting specific emission limits and monitoring requirements for particulate matter (PM), sulphur dioxide (SO2), and nitrogen oxides (NOx).","ai_generated":true,"unit":"cer-001060#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"The Atmospheric Emission Licence (AEL) for Komati Power Station was re-issued as a variation on 31 March 2015 and remains valid until 31 March 2019.","ai_generated":true,"unit":"cer-001060#insight-1","date_modified":"2026-08-17"},{"text":"The licence covers three specific listed activities: solid fuel combustion installations used for steam raising or electricity generation (Category 1, Sub-category 1), storage and handling of petroleum products in facilities with a combined capacity exceeding 1,000 cubic metres (Category 2, Sub-category 2.4), and storage and handling of ore and coal not on a mine (Category 5, Sub-category 5.1).","ai_generated":true,"unit":"cer-001060#insight-2","date_modified":"2026-08-17"},{"text":"Komati Power Station has a total nominal capacity of 940 MW and utilizes coal and fuel oil as primary inputs, with maximum permitted consumption rates of 460,000 tons per month for coal and 5,000 tons per month for fuel oil.","ai_generated":true,"unit":"cer-001060#insight-3","date_modified":"2026-08-17"},{"text":"The licence establishes a schedule for reducing maximum emission rates for pollutants from the boiler flues between 1 April 2015 and 1 April 2020. For PM, the limit drops from 100 mg/Nm³ to 50 mg/Nm³; for SO2, from 3,500 mg/Nm³ to 2,600 mg/Nm³; and for NOx, from 1,300 mg/Nm³ to 750 mg/Nm³.","ai_generated":true,"unit":"cer-001060#insight-4","date_modified":"2026-08-17"},{"text":"Eskom is required to install continuous emission monitoring equipment for PM, SO2, and NOx on all units by 01 June 2015 and must submit an Emission Offset Programme to reduce PM pollution in the ambient environment by 31 March 2016.","ai_generated":true,"unit":"cer-001060#insight-5","date_modified":"2026-08-17"},{"text":"The power station is scheduled for decommissioning between 2024 and 2029, based on a 50-year life span.","ai_generated":true,"unit":"cer-001060#insight-6","date_modified":"2026-08-17"}],"climate_tags":["energy transition","air quality","power generation","emissions monitoring","decommissioning"],"geography_discussed":["Mpumalanga","Steve Tshwete Local Municipality","Highveld Priority Area"],"frame_perspective":[],"analysis_type":["regulatory_compliance","environmental_permitting"]},{"id":"cer-001147","url":"https://climateinsightsdirectory.org/document/cer-001147","title":"majuba-ael_23jun15-bf0219a23d0d4e31.pdf","publisher":{"name":"Centre for Environmental Rights","organization":"centre-for-environmental-rights"},"document_type":"statement","language":"en","date_published":null,"source_url":"https://cer.org.za/wp-content/uploads/2017/07/Majuba-AEL_23Jun15.pdf?x21779","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"This document is an Atmospheric Emission Licence (AEL) issued on 23 June 2015 by the Gert Sibande District Municipality to Eskom Holdings SOC Limited for the Majuba Power Station. The licence, granted under the National Environmental Management: Air Quality Act, 2004, serves as a provisional transfer from an APPA registration certificate to an AEL and is valid for a period not exceeding 12 months.","ai_generated":true,"unit":"cer-001147#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"The Atmospheric Emission Licence was issued to Eskom Holdings SOC Limited for the Majuba Power Station, covering Listed Activity Category 1 (Sub-category 1.1) and Category 5 (Sub-category 5.14). The licence is valid for a period not exceeding 12 months from the date of signature.","ai_generated":true,"unit":"cer-001147#insight-1","date_modified":"2026-08-17"},{"text":"Majuba Power Station has a maximum permitted production capacity of 4,110 MW of electricity. Its regulated raw material consumption limits are 1,800,000 tons of coal per month and 6,000 tons of heavy fuel oil per month.","ai_generated":true,"unit":"cer-001147#insight-2","date_modified":"2026-08-17"},{"text":"The facility utilizes two main stacks (Stack 1 and Stack 2), each with a height of 250 meters. These stacks serve boiler units 1-6 and operate continuously 24 hours a day.","ai_generated":true,"unit":"cer-001147#insight-3","date_modified":"2026-08-17"},{"text":"Air pollution is controlled using pulse jet fabric filter plants for all boiler units (1-6), with a design minimum control efficiency of 95% and a minimum utilization of 100%.","ai_generated":true,"unit":"cer-001147#insight-4","date_modified":"2026-08-17"},{"text":"The licence identifies several sources of fugitive dust and volatile organic compounds (VOCs), including the coal stockpile, ash dumps, fuel oil tanks, conveyor belts, and unpaved roads. For most of these area and line sources, specific parameters were required to be provided within six months of the licence issue date.","ai_generated":true,"unit":"cer-001147#insight-5","date_modified":"2026-08-17"},{"text":"The licence holder is required to submit an Atmospheric Emission Management Plan within 12 months of the signature date. This plan must detail measures to achieve emission standards and manage point-source and fugitive emissions.","ai_generated":true,"unit":"cer-001147#insight-6","date_modified":"2026-08-17"},{"text":"Eskom Majuba is required to implement an offset programme by 31 March 2016 to reduce PM pollution in the ambient receiving environment, with a definite implementation plan expected within six months of the licence issue.","ai_generated":true,"unit":"cer-001147#insight-7","date_modified":"2026-08-17"}],"climate_tags":["energy transition","electricity generation","air quality","coal combustion","emissions monitoring"],"geography_discussed":["Amersfoort","Volksrust"],"frame_perspective":[],"analysis_type":["regulatory compliance","environmental permitting"]},{"id":"cer-001155","url":"https://climateinsightsdirectory.org/document/cer-001155","title":"matimba-correlation-test-results-cover-letter-257bd03ebeeeaf30.pdf","publisher":{"name":"Centre for Environmental Rights","organization":"centre-for-environmental-rights"},"document_type":"statement","language":"en","date_published":null,"source_url":"https://cer.org.za/wp-content/uploads/2017/07/Matimba-Correlation-test-results-cover-letter.pdf?x21779","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"A cover letter from Matimba Power Station to the Limpopo Department of Economic Development, Environment and Tourism submitting a correlation test report to comply with Minimum Emission Standard requirements.","ai_generated":true,"unit":"cer-001155#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"Matimba Power Station submitted a correlation test report to the Limpopo Department of Economic Development, Environment and Tourism on 11 July 2016 to satisfy the Minimum Emission Standard (MES) requirements under section 15, condition 18(c)(i)(ii) of the listed activities on GNR 893.","ai_generated":true,"unit":"cer-001155#insight-1","date_modified":"2026-08-17"},{"text":"The submitted correlation test report is a component of the annual emissions report that Matimba Power Station previously submitted in May 2016.","ai_generated":true,"unit":"cer-001155#insight-2","date_modified":"2026-08-17"}],"climate_tags":["energy transition","emissions monitoring","regulatory compliance"],"geography_discussed":["Polokwane","Lephalale"],"frame_perspective":[],"analysis_type":["regulatory submission"]},{"id":"cer-001429","url":"https://climateinsightsdirectory.org/document/cer-001429","title":"unit-1-correlations-report-summary-40fc0ae4d90696f8.pdf","publisher":{"name":"Centre for Environmental Rights","organization":"centre-for-environmental-rights"},"document_type":"report","language":"en","date_published":null,"source_url":"https://cer.org.za/wp-content/uploads/2017/07/Unit-1-Correlations-report-Summary.pdf?x21779","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","analysis_type"],"summary":{"text":"This document provides a results summary of particulate emission monitor and air-to-gas flow correlations for Unit No. 1 at Duvha Power Station, based on February 2016 data. It confirms compliance with ISO 10155 and ESKOM standards and recommends the use of specific correlation functions for reporting emissions to authorities.","ai_generated":true,"unit":"cer-001429#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"The particulate emission monitor and air-to-gas flow correlations for Unit No. 1 at Duvha Power Station, conducted in February 2016, meet all minimum requirements specified in ISO 10155 and the ESKOM Standard for Emission Monitoring and Reporting (420-56242363).","ai_generated":true,"unit":"cer-001429#insight-1","date_modified":"2026-08-17"},{"text":"The report recommends that particulate emissions from Unit No. 1 reported to authorities be based on the correlation functions presented in Figures 1, 2, and 3 of the report.","ai_generated":true,"unit":"cer-001429#insight-2","date_modified":"2026-08-17"},{"text":"The document recommends that new compliant correlations for these units be performed during the first quarter of 2018.","ai_generated":true,"unit":"cer-001429#insight-3","date_modified":"2026-08-17"}],"climate_tags":["energy transition","emissions monitoring","particulate matter"],"geography_discussed":[],"frame_perspective":[],"analysis_type":["technical report","compliance audit"]}]}