{"query_echo":{"q":"","filters":{"climate_tags":["clean-energy technology"]},"warnings":[{"code":"facet_value_not_in_vocabulary","message":"Value 'clean-energy technology' for facet 'climate_tags' is not in the controlled vocabulary."}]},"total":{"value":1,"relation":"eq"},"page":1,"page_size":20,"self":"https://climateinsightsdirectory.org/api/v1/search?climate_tags=clean-energy+technology","stability":"beta","ai_marking":{"digital_source_type":{"uri":"http://cv.iptc.org/newscodes/digitalsourcetype/trainedAlgorithmicMedia","name":"Created using Generative AI"},"notice":"Summary and key insights are generated using artificial intelligence."},"results":[{"id":"cer-000372","url":"https://climateinsightsdirectory.org/document/cer-000372","title":"CENTRE FOR ENVIRONMENTAL RIGHTS/ ESKOM HOLDINGS SOC LIMITED: APPLICATION FOR ACCESS TO INFORMATION IN TERMS OF THE PROMOTION OF ACCESS TO INFORMATION ACT, 2000 – KENDAL COMPLIANCE NOTICE (ESKOM REF 0087 MAN) – CLARIFICATION","publisher":{"name":"Centre for Environmental Rights","organization":"centre-for-environmental-rights"},"document_type":"statement","language":"en","date_published":null,"source_url":"https://cer.org.za/wp-content/uploads/2020/08/Annexure-6.pdf?x21779","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","analysis_type"],"summary":{"text":"A letter from Eskom to the Centre for Environmental Rights clarifying the distinction between the shutdown and decommissioning of its coal-fired power stations, noting that while shutdown dates are based on a 50-year plant life, firm decommissioning dates and detailed plans do not yet exist.","ai_generated":true,"unit":"cer-000372#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"Eskom utilizes a 50-year plant life assumption for long-term planning of its power station units. A unit is shut down, ceasing power production, generally around this 50-year mark, though the exact date is influenced by security of supply and social, economic, and environmental impacts.","ai_generated":true,"unit":"cer-000372#insight-1","date_modified":"2026-08-17"},{"text":"Eskom has placed 14 units, totaling 1969 MW from the Grootvlei, Hendrina, and Komati power stations, into reserve storage before they reached the 50-year norm, with no expectation of returning them to service.","ai_generated":true,"unit":"cer-000372#insight-2","date_modified":"2026-08-17"},{"text":"The decommissioning process, which includes site rehabilitation and dismantling the station, only begins after all units at a station have been shut down. The timing of this process is contingent upon Eskom's financial status, legislative approval, and potential repowering with clean-energy technology.","ai_generated":true,"unit":"cer-000372#insight-3","date_modified":"2026-08-17"},{"text":"While Eskom has anticipated shutdown dates based on the 50-year life cycle, the company currently lacks detailed plans or firm decommissioning dates for any of its coal-fired power stations.","ai_generated":true,"unit":"cer-000372#insight-4","date_modified":"2026-08-17"}],"climate_tags":["energy transition","coal power","decommissioning","clean-energy technology"],"geography_discussed":[],"frame_perspective":[],"analysis_type":["policy clarification"]}]}