{"query_echo":{"q":"","filters":{"analysis_type":["territorial"]},"warnings":[{"code":"facet_value_not_in_vocabulary","message":"Value 'territorial' for facet 'analysis_type' is not in the controlled vocabulary."}]},"total":{"value":1,"relation":"eq"},"page":1,"page_size":20,"self":"https://climateinsightsdirectory.org/api/v1/search?analysis_type=territorial","stability":"beta","ai_marking":{"digital_source_type":{"uri":"http://cv.iptc.org/newscodes/digitalsourcetype/trainedAlgorithmicMedia","name":"Created using Generative AI"},"notice":"Summary and key insights are generated using artificial intelligence."},"results":[{"id":"sei-001270","url":"https://climateinsightsdirectory.org/document/sei-001270","title":"PLANIFICACIÓN ENERGÉTICA DE LARGO PLAZO","publisher":{"name":"Stockholm Environment Institute","organization":"stockholm-environment-institute"},"document_type":"report","language":"es","date_published":"2025-04-22","source_url":"https://leap.sei.org/documents/Chile_pelp_2023-2027.pdf","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"The PELP 2023-2027 report outlines three development scenarios for Chile: Slow Recovery, Carbon Neutrality, and Accelerated Transition. It projects a significant shift toward renewable energy, primarily wind and solar photovoltaic, and identifies critical transmission expansion needs. A key innovation is the introduction of Electric Generation Development Poles (PDGE) in the provinces of Antofagasta and Tocopilla to optimize renewable energy deployment. The report also analyzes the role of green hydrogen, energy storage, and the phased retirement of coal-fired power plants to meet 2050 carbon neutrality goals.","ai_generated":true,"unit":"sei-001270#summary","date_modified":"2026-10-23"},"key_insights":[{"text":"Critical transmission expansion is identified for the next 20 years, specifically requiring at least 3,000 MW of capacity between the Alto Jahuel and Rio Malleco substations, and expansion between Parinas and the Cumbre and Los Changos substations.","ai_generated":true,"unit":"sei-001270#insight-1","date_modified":"2026-10-23"}],"climate_tags":["energy transition","carbon neutrality","renewable energy","wind power","photovoltaics","green hydrogen","energy storage","electric power transmission","Coal phase-out","energy efficiency","carbon tax","climate resilience","distributed generation"],"geography_discussed":["Antofagasta Province","Tocopilla Province","Maule Región","Argentina"],"frame_perspective":[],"analysis_type":["prospectively","quantitative","territorial"]}]}